ULNRC-06812, Submittal of 2022 Annual Radiological Environmental Operating Report

From kanterella
Revision as of 09:22, 8 May 2023 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Submittal of 2022 Annual Radiological Environmental Operating Report
ML23117A293
Person / Time
Site: Callaway  Ameren icon.png
Issue date: 04/27/2023
From: Witt T
Ameren Missouri, Union Electric Co
To:
Office of Nuclear Reactor Regulation, Document Control Desk
Shared Package
ML23117A292 List:
References
ULNRC-06812
Download: ML23117A293 (1)


Text

Callaway Plant

.t April 27, 2023 ULNRC-06812 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001 40 CFR 190 10 CFR 72.44(d)(2)

Ladies and Gentlemen:

DOCKET NUMBERS 50-483 AND 72-1045 CALLAWAY PLANT UNIT 1 UNION ELECTRIC CO.

RENEWED FACILITY OPERATING LICENSE NPF-30 2022 ANNUAL RADIOLOGICAL ENVIRONMENTAL OPERATING REPORT Please find enclosed the 2022 Annual Radiological Environmental Operating Report for the Callaway Plant (Callaway Energy Center). This report is submitted in accordance with Section 5.6.2 of the Callaway Plant Technical Specifications and Appendix B to the Callaway Plant Operating License.

The report concerns the environmental monitoring program established for the Callaway Energy Center, which also pertains to the independent spent fuel storage facility at the plant consistent with Section 5.1.b of Appendix A to the HI-STORM UMAX Certificate of Compliance.

This letter does not contain new commitments.

If there are any questions, please contact Aaron Enloe at 573-592-9286.

Sincerely, A Witt Todd A.

Manager, Regulatory Affairs Enclosure

.t 8315 County Road 459 : Steedman, MO 65077 : AmerenMissouri.com

.t

.t

ULNRC-06812 April 27, 2023 Page 2 of 3 cc: Mr. Robert Lewis Regional Administrator U. S. Nuclear Regulatory Commission Region IV 1600 East Lamar Boulevard Arlington, TX 76011-4511 Senior Resident Inspector Callaway Resident Office U.S. Nuclear Regulatory Commission 8201 NRC Road Steedman, MO 65077 Mr. M. Chawla Project Manager, Callaway Plant Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Mail Stop O8B1A Washington, DC 20555-0001

ULNRC-06812 April 27, 2023 Page 3 of 3 Index and send hardcopy to QA File A160.0761 Hardcopy:

Certrec Corporation 6500 West Freeway, Suite 400 Fort Worth, TX 76116 (Certrec receives ALL attachments as long as they are non-safeguards and may be publicly disclosed.)

Electronic distribution for the following can be made via Responses and Reports ULNRC Distribution:

F. M. Diya K. C. Scott D. E. Farnsworth T. A. Witt B. L. Jungmann T. B. Elwood M. Maxwell V. D. Miller A. E. Enloe E. R. Newcomb C. J. Giesmann NSRB Secretary Mr. Jason Davenport, REP Manager (SEMA)

STARS Regulatory Affairs Mr. Jay Silberg (Pillsbury Winthrop Shaw Pittman LLP)

Mr. Aaron Schmidt (DNR)

.