HL-5736, Forwards Rev 0 to Ei Hatch Nuclear Plant Unit 1 Fuel Cycle 16 Colr

From kanterella
Revision as of 05:11, 27 September 2022 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Rev 0 to Ei Hatch Nuclear Plant Unit 1 Fuel Cycle 16 Colr
ML20078F442
Person / Time
Site: Hatch Southern Nuclear icon.png
Issue date: 11/07/1994
From: Beckham J
GEORGIA POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20078F444 List:
References
HL-5736, NUDOCS 9411150265
Download: ML20078F442 (1)


Text

Georgia Power Company 40 inverness Center Parkway Post Office Box 1295 B.rmingham. Alabarna 3520 5 Te;ephone 205 877-7279 A

J. T. Beckham. Jr. Georgia Power

'C

'; ~ % * *'

ey rnbrn ce ch: systen November 7, 1994 Docket No. 50-321 HI 4736 colr16nr U.S. Nuclear Regulatory Commission ATfN: Document Control Desk Washington, D.C. 20555 Edwin I. Hatch Nuclear Plant - Unit 1 Cycle 16 Core Operating Limits Report Gentlemen:

By Amendment 168 to the Unit 1 Technical Specifications, the NRC authorized relocation of certain fuel-related limits from the Technical Spege'fications to the adjunct Core O)erating Limits Report (COLR). This letter transmits an information copy of the CO LR for Hatch Unit 1 Cycle 16.

If you have questions regarding the enclosed COLR, please contact this office.

Sincerely, h

' . T. Beckham, Jr. d-SRP/sp

Enclosure:

Unit 1 Cycle 16 Core Operating Limits Report c: Georcia Power Company (w/o enclosure)

Mr. II. L Sumner, Nuclear Plant General Manager NORMS

.U.S. Nuclear Reculatory Commission. Washincton. D.C. .

Mr. K. II. Jabbour, Licensing Project Manager - Hatch l U.S. Nudcar Reculatory Commission. Recion II

~

Mr. S. D. Ebneter, Regional Administrator (w/o enclosure)

Mr. B. L. Ilolbrook, Senior Resident Inspector - Hatch 9411150265 941107 - g i j PDR p

ADOCK 05000321 PDR v

-) l l

l j