HL-4807, Forwards Rev 1 to Ei Hatch Nuclear Plant Unit 2 COLR for Fuel Cycle 12

From kanterella
Revision as of 15:26, 26 September 2022 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Rev 1 to Ei Hatch Nuclear Plant Unit 2 COLR for Fuel Cycle 12
ML20081D907
Person / Time
Site: Hatch Southern Nuclear icon.png
Issue date: 03/14/1995
From: Beckham J
GEORGIA POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20081D912 List:
References
HL-4807, NUDOCS 9503210067
Download: ML20081D907 (1)


Text

--

-- ~ .

Georgia Power Company .

40invrrrass Centes Pa4way

i Post offica Box ;295 Birmingham Alabama 33201, Telephone 205 877 7279
  • J. T. Beckham, Jr. Georgia Power Pres t Mear fte sasun drtre systern

, Vj,*h p, g

March 14, 1995 Docket No. 50-366 HL-4807 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk -

Washington, D. C. 20555 Edwin I. Hatch Nuclear Plant Revision 1 to Cycle 12 Core Operating Limits Report Gentlemen:

By Amendment 106 to the Unit 2 Technical Specifications, the NRC authorized relocation

- of certain fuel-related limits from the Technical Specifications to the adjunct Core Operating Limits Report (COLR). This letter transmits an information copy Revision 1 to the COLR for Hatch 2 Cycle 12.

If there are any questions regarding this report, please contact this oflice.

Sincerely,

$h J. T. Beckham, Jr.

RDB/eb

Enclosure:

Unit 2 Cycle 12 Core Operating Limits Report, Revision 1 cc: Georeia Power Company Mr. H. L. Sumner, Jr., Nuclear Plant General Manager NORMS U. S Nuclear Regulatorv Commission. Washington. D. C.

Mr. K. Jabbour, Licensing Project Manager - Hatch U. S. Nuclear Regulatory Commission. Region H Mr. S. D. Ebneter, Regional Administrator j Mr. B. L. Holbrook, Senior Resident Inspector - Hatch ,,0 V

9503210067 950314 il PDR ADOCK 05000366 P PDR