ML16048A212 | |
Person / Time | |
---|---|
Site: | Diablo Canyon |
Issue date: | 12/31/2014 |
Revision: | 0 |
From: | Pacific Gas & Electric Co |
To: | Office of Nuclear Reactor Regulation |
Shared Package | |
ML16048A230 | List:
|
References | |
DCL-15-142, CAC MF4019, CAC MF4020 | |
Download: ML16048A212 (1) | |
Similar Documents at Diablo Canyon | |
---|---|
Category:Environmental Monitoring Report
MONTHYEARDCL-24-082, Decommissioning Draft Biological Assessment and Draft Essential Fish Habitat Assessment2024-08-28028 August 2024
[Table view]Decommissioning Draft Biological Assessment and Draft Essential Fish Habitat Assessment DCL-2024-523, Submittal of Report on Discharge Self-Monitoring2024-07-18018 July 2024 Submittal of Report on Discharge Self-Monitoring DCL-2024-527, Sea Turtle Stranding Report (Loggerhead Sea Turtle) Diablo Canyon Power Plant2024-07-0101 July 2024 Sea Turtle Stranding Report (Loggerhead Sea Turtle) Diablo Canyon Power Plant DCL-24-047, 2023 Annual Non-radiological Environmental Operating Report2024-05-0101 May 2024 2023 Annual Non-radiological Environmental Operating Report DCL-24-049, 2023 Annual Radiological Environmental Operating Report2024-05-0101 May 2024 2023 Annual Radiological Environmental Operating Report DCL-24-027, 2023 Annual Radioactive Effluent Release Report2024-04-28028 April 2024 2023 Annual Radioactive Effluent Release Report A000375, Discharge Self-Monitoring at Diablo Canyon Power Plant (DCPP) - 1st Quarter Report 20242024-04-20020 April 2024 Discharge Self-Monitoring at Diablo Canyon Power Plant (DCPP) - 1st Quarter Report 2024 DCL-2024-507, 2023 Annual Report on Discharge Self-Monitoring2024-02-27027 February 2024 2023 Annual Report on Discharge Self-Monitoring DCL-2024-501, Sea Turtle Stranding Report (Green Sea Turtle)2024-01-24024 January 2024 Sea Turtle Stranding Report (Green Sea Turtle) DCL-2024-500, Transmittal of the 4th Quarter of 2023 Report on Discharge Self-Monitoring2024-01-18018 January 2024 Transmittal of the 4th Quarter of 2023 Report on Discharge Self-Monitoring ML24003A7212023-11-27027 November 2023 Independent Safety Committee; Diablo Canyon Nuclear Power Plant Operations, Thirty-Third Annual Report on the Safety July 1, 2022-June 30, 2023 DCL-2023-520, Discharge Self-Monitoring at Diablo Canyon Power Plant (DCPP)2023-10-19019 October 2023 Discharge Self-Monitoring at Diablo Canyon Power Plant (DCPP) DCL-23-034, 2022 Annual Nonradiological Environmental Operating Report2023-05-0101 May 2023 2022 Annual Nonradiological Environmental Operating Report DCL-2023-511, Report on Discharge Monitoring for the First Quarter of 20232023-04-20020 April 2023 Report on Discharge Monitoring for the First Quarter of 2023 ML23137A1352023-04-18018 April 2023 NPDES Receiving Water Monitoring Program 2022 Annual Report ML23052A1152023-02-18018 February 2023 Independent Spent Fuel Storage Installation, Annual Radioactive Effluent Release Report for 2022 DCL-2023-503, Annual Sea Turtle Report2023-01-26026 January 2023 Annual Sea Turtle Report DCL-2023-502, (DCPP) 4th Quarter 2022 Report on Discharge Self-Monitoring2023-01-18018 January 2023 (DCPP) 4th Quarter 2022 Report on Discharge Self-Monitoring DCL-22-032, 2021 Annual Nonradiological Environmental Operating Report2022-04-27027 April 2022 2021 Annual Nonradiological Environmental Operating Report DCL-22-033, Annual Report of Occupational Radiation Exposure for 20212022-04-26026 April 2022 Annual Report of Occupational Radiation Exposure for 2021 DCL-22-025, 2021 Annual Radiological Environmental Operating Report2022-04-21021 April 2022 2021 Annual Radiological Environmental Operating Report DCL-22-017, Submittal of 2021 Annual Radioactive Effluent Release Report2022-04-21021 April 2022 Submittal of 2021 Annual Radioactive Effluent Release Report DCL-21-037, Annual Nonradiological Environmental Operating Report2021-04-28028 April 2021 Annual Nonradiological Environmental Operating Report DCL-2021-514, NPDES Receiving Water Monitoring Program: 2020 Annual Report2021-04-27027 April 2021 NPDES Receiving Water Monitoring Program: 2020 Annual Report DCL-21-022, 2020 Annual Radiological Environmental Operating Report2021-04-0101 April 2021 2020 Annual Radiological Environmental Operating Report L-21-003, Independent Spent Fuel Storage Installation - Annual Radioactive Effluent Release Report for 20202021-03-0101 March 2021 Independent Spent Fuel Storage Installation - Annual Radioactive Effluent Release Report for 2020 DCL-20-036, 2019 Annual Non-Radiological Environment Operating Report2020-04-29029 April 2020 2019 Annual Non-Radiological Environment Operating Report DCL-20-010, 2019 Annual Radiological Environmental Operating Report2020-04-16016 April 2020 2019 Annual Radiological Environmental Operating Report L-20-003, Independent Spent Fuel Storage Installation - Annual Radioactive Effluent Release Report for 20192020-03-0202 March 2020 Independent Spent Fuel Storage Installation - Annual Radioactive Effluent Release Report for 2019 DCL-2020-509, 2019 Annual Report on Discharge Self-Monitoring2020-02-27027 February 2020 2019 Annual Report on Discharge Self-Monitoring DCL-19-026, Annual Radioactive Effluent Release Report2019-04-23023 April 2019 Annual Radioactive Effluent Release Report DCL-18-028, Submittal of 2017 Annual Radioactive Effluent Release Report2018-04-24024 April 2018 Submittal of 2017 Annual Radioactive Effluent Release Report DCL-17-034, 2016 Annual Non-Radiological Environmental Operating Report2017-04-27027 April 2017 2016 Annual Non-Radiological Environmental Operating Report ML17128A0242017-04-26026 April 2017 Submittal of 2016 Annual Radiological Environmental Operating Report DCL-17-030, Diablo Canyon Units 1 and 2, Submittal of 2016 Annual Radiological Environmental Operating Report2017-04-26026 April 2017 Diablo Canyon Units 1 and 2, Submittal of 2016 Annual Radiological Environmental Operating Report DCL-17-031, Transmittal of 2016 Annual Radioactive Effluent Release Report2017-04-26026 April 2017 Transmittal of 2016 Annual Radioactive Effluent Release Report ML17096A7662017-04-0606 April 2017 Submittal of Mitigating Strategies Assessment for Flooding Report DCL-17-030, 2016 Annual Quality Assurance Report for the Radiological Environmental Monitoring Program (REMP)2017-03-29029 March 2017 2016 Annual Quality Assurance Report for the Radiological Environmental Monitoring Program (REMP) DCL-2017-511, Submittal of 2016 Annual Discharge Self-Monitoring Report2017-02-28028 February 2017 Submittal of 2016 Annual Discharge Self-Monitoring Report DCL-2017-501, Diablo Power Plant - 2016 Annual Sea Turtle Report2017-01-27027 January 2017 Diablo Power Plant - 2016 Annual Sea Turtle Report DCL-2017-500, Discharge Monitoring Report for Fourth Quarter 20162017-01-20020 January 2017 Discharge Monitoring Report for Fourth Quarter 2016 DCL-16-113, Corrections to the 2014 and 2015 Annual Radioactive Effluent Release Reports2016-11-0101 November 2016 Corrections to the 2014 and 2015 Annual Radioactive Effluent Release Reports DCL-16-055, Transmittal of 2015 Annual Non-Radiological Environmental Operating Report2016-04-28028 April 2016 Transmittal of 2015 Annual Non-Radiological Environmental Operating Report ML16154A1652016-04-27027 April 2016 Submittal of Copies of Receiving Water Monitoring Program 2015 Annual Report L-2016-518, Diablo Canyon Power Plant, Submittal of Copies of Receiving Water Monitoring Program 2015 Annual Report2016-04-27027 April 2016 Diablo Canyon Power Plant, Submittal of Copies of Receiving Water Monitoring Program 2015 Annual Report DCL-16-054, Annual Radioactive Effluent Release Report for 20152016-04-27027 April 2016 Annual Radioactive Effluent Release Report for 2015 DCL-2016-518, NPDES Receiving Water Monitoring Program: 2015 Annual Report2016-04-25025 April 2016 NPDES Receiving Water Monitoring Program: 2015 Annual Report DCL-16-045, Submittal of 2015 Annual Radiological Environmental Operating Report2016-04-21021 April 2016 Submittal of 2015 Annual Radiological Environmental Operating Report DCL-2016-516, Transmittal of 1st Quarter 2016 Report on Discharge Self-Monitoring2016-04-20020 April 2016 Transmittal of 1st Quarter 2016 Report on Discharge Self-Monitoring DCL-15-137, Corrections to the 2014 Annual Radioactive Effluent Release Report2015-12-31031 December 2015 Corrections to the 2014 Annual Radioactive Effluent Release Report 2024-08-28 Category:Graphics incl Charts and Tables MONTHYEARML23241A1532023-05-25025 May 2023
[Table view]7 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-2, Drawing 102002, 6A, Rev. 113, Condensate System ML23241A2032023-05-25025 May 2023 7 to Updated Final Safety Analysis Report, Chapter 7, Figure 7.2-1, Drawing 495885, Revision 5, Sheet 1, I & C Functional Logic Diagram Auxiliary Feedwater Pumps Startup ML23241A2542023-05-25025 May 2023 7 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-13, Drawing 108013, Sheet 2, Rev. 37, Spent Fuel Pit Cooling System ML23241A3362023-05-25025 May 2023 7 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-21, Drawing 108021, Sheet 5A, Rev. 44, Combustion Air and Exhaust System 2-2 ML23241A5182023-05-25025 May 2023 7 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-19, Drawing 108019, Sheet 6B, Rev. 18, Liquid Radwaste Media Filters and Radwaste Ion Exchangers ML23241A5682023-05-25025 May 2023 7 to Updated Final Safety Analysis Report, Chapter 7, Figure 7.2-1, Drawing 495849, Revision 7, Sheet 1, I & C Functional Logic Diagram Rod Controls & Rod Blocks ML23241A6112023-05-25025 May 2023 7 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.8-59, Drawing 439509, Sheet 1, Rev. 4, Mechanical Requirements for 125 Ton Crane Auxiliary Building Fuel Handling Area DCL-22-039, Irradiated Fuel Management Plan, Revision 12022-10-12012 October 2022 Irradiated Fuel Management Plan, Revision 1 ML22108A1652022-05-0303 May 2022 Enclosure 2 - Timeline of Event ML21305A4022021-10-11011 October 2021 6 to Updated Final Safety Analysis Report, Figure 3.2-23, Sheet 22 of 53, Drawing 108023, Revision 75, Sheet 13, Ventilation & Air Conditioning Systems ML19259A1112019-09-16016 September 2019 Exemption Spreadsheet ML16314C2912016-11-0909 November 2016 Graphics, Charts and Tables for Pacific Gas & Electric Co. SER 7 Item (6) Subitem (5)(d) ML16083A5512016-03-30030 March 2016 Interim Staff Response to Reevaluated Flood Hazards Submitted in Response to 10 CFR 50.54(f) Information Request - Flood-Causing Mechanism Reevaluation ML16056A1392016-03-11011 March 2016 Correction to the U.S. Nuclear Regulatory Commission Analysis of Licensees' Decommissioning Funding Status Reports ML16004A3552015-12-17017 December 2015 Response to NRC Request for Additional Information Regarding License Amendment Request 15-03, Regulatory Guide 1.183 Conformance Tables, Revision 1 ML16048A2082015-12-15015 December 2015 Wastewater Treatment Unit Schematic ML16048A2152015-12-15015 December 2015 Fleet Vehicle-Asset List DCL-15-131, Pressurizer Spray Line Pipe Weld Flaw Evaluation, Calculation Package, Part 22015-11-0303 November 2015 Pressurizer Spray Line Pipe Weld Flaw Evaluation, Calculation Package, Part 2 ML15233A0062015-09-10010 September 2015 Summary of Meeting with Pacific Gas and Electric Company to Discuss Digital Replacement of Process Protection System at Diablo Canyon Power Plant, Units 1 and 2 ML16133A0792015-07-0101 July 2015 NRC to Nfms Second Scoping Letter July 1 2015 ML15160A261 ML16048A2122014-12-31031 December 2014 Hazardous Waste Volume Trends 1994-2014 ML14307B7072014-12-10010 December 2014 Supplemental Information Related to Development of Seismic Risk Evaluations for Information Request Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Seismic Hazard Reevaluations for Recommendation 2.1 of the Near-T ML14330A6392014-11-26026 November 2014 One-Hundred-Twenty-Day Response to NRC Request for Additional Information - National Fire Protection Association Standard 805, Part 2 of 2 DCL-14-110, One-Hundred-Twenty-Day Response to NRC Request for Additional Information - National Fire Protection Association Standard 805, Part 1 of 22014-11-26026 November 2014 One-Hundred-Twenty-Day Response to NRC Request for Additional Information - National Fire Protection Association Standard 805, Part 1 of 2 DCL-14-081, Diablo Canyon Units 1 and 2, Central Coastal California Seismic Imaging Project (Cccsip) Chapter 2, GEO.DCPP.TR.12.01 R1 Figures 09-02-142014-09-10010 September 2014 Diablo Canyon Units 1 and 2, Central Coastal California Seismic Imaging Project (Cccsip) Chapter 2, GEO.DCPP.TR.12.01 R1 Figures 09-02-14 DCL-14-081, Diablo Canyon Units 1 and 2, Central Coastal California Seismic Imaging Project (Cccsip) Chapter 5, GEO.DCPP.TR.14.04 R0 App A-G Figures 08-06-142014-09-10010 September 2014 Diablo Canyon Units 1 and 2, Central Coastal California Seismic Imaging Project (Cccsip) Chapter 5, GEO.DCPP.TR.14.04 R0 App A-G Figures 08-06-14 ML14260A0332014-09-10010 September 2014 Central Coastal California Seismic Imaging Project (Cccsip) Chapter 2, GEO.DCPP.TR.12.01 R1 Figures 09-02-14 ML14260A0432014-09-10010 September 2014 Central Coastal California Seismic Imaging Project (Cccsip) Chapter 5, GEO.DCPP.TR.14.04 R0 App A-G Figures 08-06-14 ML13148A4202013-06-0606 June 2013 2/20/13 Summary of Public Meeting with Pacific Gas and Electric Company to Discuss Digital Replacement of Process Protection System at Diablo Canyon Power Plant, Units 1 and 2 ML12341A1232012-12-19019 December 2012 Summary of Meeting Via Teleconference with Pacific Gas and Electric Company to Discuss Digital Replacement of Process Protection System at Diablo Canyon Power Plant, Units 1 and 2 ML12200A1272012-08-0202 August 2012 Summary of Meeting with Pacific Gas and Electric Company to Discuss Digital Replacement of Process Protection System at Diablo Canyon Power Plant, Units 1 and 2 ML1214500142012-05-23023 May 2012 NFPA 805 LAR Status Matrix - May 2012 DCL-12-041, 2011 Annual Radiological Environmental Operating Report. Part 4 of 52012-04-16016 April 2012 2011 Annual Radiological Environmental Operating Report. Part 4 of 5 ML12125A3872012-04-16016 April 2012 2011 Annual Radiological Environmental Operating Report. Part 4 of 5 ML1117206342011-06-20020 June 2011 Draft Seismic Information Evaluation Flowchart ML1109101572011-03-31031 March 2011 Licensee Slides from 3/31/11 Meeting with Pacific Gas and Electric Company Change in Probabilistic Hazard ML1109101462011-03-31031 March 2011 Licensee Slides from 3/31/11 Meeting with Pacific Gas and Electric Company Deterministic Comparison DCL-11-023, Response to Summary of Telephone Conference Call Held on 02/28/2011, Between U.S. Nuclear Regulatory Commission & PG&E Co. Concerning Responses to Requests for Additional Info. for Renewal Application2011-03-25025 March 2011 Response to Summary of Telephone Conference Call Held on 02/28/2011, Between U.S. Nuclear Regulatory Commission & PG&E Co. Concerning Responses to Requests for Additional Info. for Renewal Application ML1019004182010-06-28028 June 2010 Quick View Chart ML1007104232010-03-12012 March 2010 Diesel Relay Setpoint Changes ML0835402612008-12-17017 December 2008 Shoreline Fault Characterization Schedule ML0906902942008-11-21021 November 2008 Meeting Slide, Spectra 6.5 Slide from Pacific Gas and Electric Regarding License Amendment Request Re AFW System and CST, Diablo Canyon Power Plant, Unit Nos. 1 and 2 ML11166A2072008-10-10010 October 2008 Water Supplier Table DCL-10-083, Water Supplier Table2008-10-10010 October 2008 Water Supplier Table DCL-08-021, Revision to the Unit 1 Reactor Vessel Material Surveillance Program Withdrawal Schedule2008-03-12012 March 2008 Revision to the Unit 1 Reactor Vessel Material Surveillance Program Withdrawal Schedule ML0728203072007-10-11011 October 2007 Electronic Distribtion Initiative Letter, Licensee List, Electronic Distribution Input Information, Division Plant Mailing Lists DCL-06-080, PG&E Response to NRC Request for Additional Information Regarding, Special Report 06-01 - Results of Steam Generator (SG) Tube Inspections for Diablo Canyon, Unit 1 Thirteenth Refueling Outage2006-06-23023 June 2006 PG&E Response to NRC Request for Additional Information Regarding, Special Report 06-01 - Results of Steam Generator (SG) Tube Inspections for Diablo Canyon, Unit 1 Thirteenth Refueling Outage 2023-05-25 |