Administration Results Other: DCL-15-142, Pacific Gas & Electric 230kV Electrical Switchyard Voltage Support Project, DCL-2011-512, 2010 Annual Report on Discharge Monitoring, DCL-2014-500, 2013 Annual Report on Discharge Monitoring, ML16048A204, ML16048A205, ML16048A206, ML16048A207, ML16048A208, ML16048A210, ML16048A211, ML16048A212, ML16048A213, ML16048A214, ML16048A215, ML16048A218, ML16048A219, ML16048A284, ML16048A286, ML16050A291, ML16050A292, ML16050A294, ML16050A296, ML16050A297 | |
MONTHYEARML16050A2912008-08-22022 August 2008
[Table View]Water Resources Evaluation: Well Installation and Aquifer Testing. Part 1 of 2 Project stage: Other ML16050A2922008-08-22022 August 2008 Water Resources Evaluation: Well Installation and Aquifer Testing. Part 2 of 2 Project stage: Other ML16048A2112010-12-31031 December 2010 SB14 Performance Report (2010) Project stage: Other ML16048A2842010-12-31031 December 2010 CEC-1304 Schedule 3 Part a (Page 1), Year 2010. Part 1 of 2 Project stage: Other DCL-2011-512, 2010 Annual Report on Discharge Monitoring2011-02-28028 February 2011 2010 Annual Report on Discharge Monitoring Project stage: Other ML16048A2142011-03-0707 March 2011 2010 Air Emission Inventory Report Project stage: Other ML16050A1782011-07-18018 July 2011 Seismic Study Meeting San Luis Obispo County Project stage: Meeting ML16048A2102012-12-31031 December 2012 RCRA Waste Off-Specification Adhesives and Sealants from Maintenance Activities Project stage: Other ML16050A2972013-04-24024 April 2013 Nrhp Dist. Nom. Update: Rancho Canada De Los Osos Y Pecho Y Islay Project stage: Other ML16048A2862013-12-31031 December 2013 CEC-1304 Schedule 3 Part a (Page 1), Year 2013. Part 2 of 2 Project stage: Other DCL-15-142, Pacific Gas & Electric 230kV Electrical Switchyard Voltage Support Project2014-02-20020 February 2014 Pacific Gas & Electric 230kV Electrical Switchyard Voltage Support Project Project stage: Other DCL-2014-500, 2013 Annual Report on Discharge Monitoring2014-02-28028 February 2014 2013 Annual Report on Discharge Monitoring Project stage: Other ML16048A2122014-12-31031 December 2014 Hazardous Waste Volume Trends 1994-2014 Project stage: Other ML16048A2192015-04-21021 April 2015 NPDES Receiving Water Monitoring Program: 2014 Annual Report Project stage: Other ML16048A2132015-06-22022 June 2015 Permit Renewal No. 49-1 Project stage: Other ML16048A2042015-06-30030 June 2015 Notice of Intent, General Permit to Discharge Storm Water Project stage: Other ML16048A2052015-06-30030 June 2015 Storm Water Pollution Prevention Plan Project stage: Other ML15243A5542015-09-0101 September 2015 August 5, 2015, Diablo Canyon Public Scoping Meeting - Afternoon Session Project stage: Request ML16050A2942015-09-30030 September 2015 Figure 1, Previously Distributed Lands, San Luis Obispo County, CA, September 2015 Project stage: Other ML15295A3732015-11-0505 November 2015 Requests for Additional Information Related to the Diablo Canyon LRA Environmental Review Project stage: RAI ML16048A2182015-11-10010 November 2015 Compress Air Energy Storage (Caes) Project stage: Other ML16050A1802015-12-0404 December 2015 Response to NRC Letter Dated November 5, 2015, Request for Additional Information Related to the Environmental Review of the License Renewal Application. Project stage: Request ML16048A2082015-12-15015 December 2015 Wastewater Treatment Unit Schematic Project stage: Other ML16048A2072015-12-15015 December 2015 Once Through Cooling Project stage: Other ML16048A2062015-12-15015 December 2015 Attachment C, Figure, Waste Stream Schematic and Map, Site Storm Water Drainage System Project stage: Other ML16048A2152015-12-15015 December 2015 Fleet Vehicle-Asset List Project stage: Other ML16050A2962015-12-15015 December 2015 Maps Project stage: Other ML15348A1702015-12-17017 December 2015 Summary of Telephone Conference Call Held Between NRC and Pacific Gas and Electric Co., Concerning the RAI Responses Pertaining to the Diablo Canyon Power Plant LRA Environmental Review Project stage: RAI ML16011A2042016-01-14014 January 2016 Summary of Conference Call on January 7, 2016, Between the U.S. NRC and Pacific Gas and Electric Co. Concerning the Responses to RAI for the Review of the Diablo Canyon Power Plant, Units 1 and 2, License Renewal Application (CAC Nos. MF401 Project stage: RAI ML16067A1162016-03-21021 March 2016 Issuance of Environmental Scoping Summary Report Associated with the Review of the Diablo Canyon Power Plant License Renewal Application Project stage: Approval 2015-11-10 |
ML16048A208 | |
Person / Time | |
---|---|
Site: | Diablo Canyon |
Issue date: | 12/15/2015 |
From: | Pacific Gas & Electric Co |
To: | Office of Nuclear Reactor Regulation |
Shared Package | |
ML16048A230 | List:
|
References | |
DCL-15-142, CAC MF4019, CAC MF4020 | |
Download: ML16048A208 (2) | |
Similar Documents at Diablo Canyon | |
---|---|
Category:Graphics incl Charts and Tables
MONTHYEARML23241A1532023-05-25025 May 2023
[Table view]7 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-2, Drawing 102002, 6A, Rev. 113, Condensate System ML23241A6112023-05-25025 May 2023 7 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.8-59, Drawing 439509, Sheet 1, Rev. 4, Mechanical Requirements for 125 Ton Crane Auxiliary Building Fuel Handling Area ML23241A5682023-05-25025 May 2023 7 to Updated Final Safety Analysis Report, Chapter 7, Figure 7.2-1, Drawing 495849, Revision 7, Sheet 1, I & C Functional Logic Diagram Rod Controls & Rod Blocks ML23241A5182023-05-25025 May 2023 7 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-19, Drawing 108019, Sheet 6B, Rev. 18, Liquid Radwaste Media Filters and Radwaste Ion Exchangers ML23241A3362023-05-25025 May 2023 7 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-21, Drawing 108021, Sheet 5A, Rev. 44, Combustion Air and Exhaust System 2-2 ML23241A2542023-05-25025 May 2023 7 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-13, Drawing 108013, Sheet 2, Rev. 37, Spent Fuel Pit Cooling System ML23241A2032023-05-25025 May 2023 7 to Updated Final Safety Analysis Report, Chapter 7, Figure 7.2-1, Drawing 495885, Revision 5, Sheet 1, I & C Functional Logic Diagram Auxiliary Feedwater Pumps Startup DCL-22-039, Irradiated Fuel Management Plan, Revision 12022-10-12012 October 2022 Irradiated Fuel Management Plan, Revision 1 ML22108A1652022-05-0303 May 2022 Enclosure 2 - Timeline of Event ML21305A4022021-10-11011 October 2021 6 to Updated Final Safety Analysis Report, Figure 3.2-23, Sheet 22 of 53, Drawing 108023, Revision 75, Sheet 13, Ventilation & Air Conditioning Systems ML19259A1112019-09-16016 September 2019 Exemption Spreadsheet ML16314C2912016-11-0909 November 2016 Graphics, Charts and Tables for Pacific Gas & Electric Co. SER 7 Item (6) Subitem (5)(d) ML16083A5512016-03-30030 March 2016 Interim Staff Response to Reevaluated Flood Hazards Submitted in Response to 10 CFR 50.54(f) Information Request - Flood-Causing Mechanism Reevaluation ML16056A1392016-03-11011 March 2016 Correction to the U.S. Nuclear Regulatory Commission Analysis of Licensees' Decommissioning Funding Status Reports ML16004A3552015-12-17017 December 2015 Response to NRC Request for Additional Information Regarding License Amendment Request 15-03, Regulatory Guide 1.183 Conformance Tables, Revision 1 ML16048A2082015-12-15015 December 2015 Wastewater Treatment Unit Schematic ML16048A2152015-12-15015 December 2015 Fleet Vehicle-Asset List DCL-15-131, Pressurizer Spray Line Pipe Weld Flaw Evaluation, Calculation Package, Part 22015-11-0303 November 2015 Pressurizer Spray Line Pipe Weld Flaw Evaluation, Calculation Package, Part 2 ML15233A0062015-09-10010 September 2015 Summary of Meeting with Pacific Gas and Electric Company to Discuss Digital Replacement of Process Protection System at Diablo Canyon Power Plant, Units 1 and 2 ML16133A0792015-07-0101 July 2015 NRC to Nfms Second Scoping Letter July 1 2015 ML15160A261 ML16048A2122014-12-31031 December 2014 Hazardous Waste Volume Trends 1994-2014 ML14307B7072014-12-10010 December 2014 Supplemental Information Related to Development of Seismic Risk Evaluations for Information Request Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Seismic Hazard Reevaluations for Recommendation 2.1 of the Near-T ML14330A6392014-11-26026 November 2014 One-Hundred-Twenty-Day Response to NRC Request for Additional Information - National Fire Protection Association Standard 805, Part 2 of 2 DCL-14-110, One-Hundred-Twenty-Day Response to NRC Request for Additional Information - National Fire Protection Association Standard 805, Part 1 of 22014-11-26026 November 2014 One-Hundred-Twenty-Day Response to NRC Request for Additional Information - National Fire Protection Association Standard 805, Part 1 of 2 DCL-14-081, Diablo Canyon Units 1 and 2, Central Coastal California Seismic Imaging Project (Cccsip) Chapter 2, GEO.DCPP.TR.12.01 R1 Figures 09-02-142014-09-10010 September 2014 Diablo Canyon Units 1 and 2, Central Coastal California Seismic Imaging Project (Cccsip) Chapter 2, GEO.DCPP.TR.12.01 R1 Figures 09-02-14 DCL-14-081, Diablo Canyon Units 1 and 2, Central Coastal California Seismic Imaging Project (Cccsip) Chapter 5, GEO.DCPP.TR.14.04 R0 App A-G Figures 08-06-142014-09-10010 September 2014 Diablo Canyon Units 1 and 2, Central Coastal California Seismic Imaging Project (Cccsip) Chapter 5, GEO.DCPP.TR.14.04 R0 App A-G Figures 08-06-14 ML14260A0432014-09-10010 September 2014 Central Coastal California Seismic Imaging Project (Cccsip) Chapter 5, GEO.DCPP.TR.14.04 R0 App A-G Figures 08-06-14 ML14260A0332014-09-10010 September 2014 Central Coastal California Seismic Imaging Project (Cccsip) Chapter 2, GEO.DCPP.TR.12.01 R1 Figures 09-02-14 ML13148A4202013-06-0606 June 2013 2/20/13 Summary of Public Meeting with Pacific Gas and Electric Company to Discuss Digital Replacement of Process Protection System at Diablo Canyon Power Plant, Units 1 and 2 ML12341A1232012-12-19019 December 2012 Summary of Meeting Via Teleconference with Pacific Gas and Electric Company to Discuss Digital Replacement of Process Protection System at Diablo Canyon Power Plant, Units 1 and 2 ML12200A1272012-08-0202 August 2012 Summary of Meeting with Pacific Gas and Electric Company to Discuss Digital Replacement of Process Protection System at Diablo Canyon Power Plant, Units 1 and 2 ML1214500142012-05-23023 May 2012 NFPA 805 LAR Status Matrix - May 2012 DCL-12-041, 2011 Annual Radiological Environmental Operating Report. Part 4 of 52012-04-16016 April 2012 2011 Annual Radiological Environmental Operating Report. Part 4 of 5 ML12125A3872012-04-16016 April 2012 2011 Annual Radiological Environmental Operating Report. Part 4 of 5 ML1117206342011-06-20020 June 2011 Draft Seismic Information Evaluation Flowchart ML1109101462011-03-31031 March 2011 Licensee Slides from 3/31/11 Meeting with Pacific Gas and Electric Company Deterministic Comparison ML1109101572011-03-31031 March 2011 Licensee Slides from 3/31/11 Meeting with Pacific Gas and Electric Company Change in Probabilistic Hazard DCL-11-023, Response to Summary of Telephone Conference Call Held on 02/28/2011, Between U.S. Nuclear Regulatory Commission & PG&E Co. Concerning Responses to Requests for Additional Info. for Renewal Application2011-03-25025 March 2011 Response to Summary of Telephone Conference Call Held on 02/28/2011, Between U.S. Nuclear Regulatory Commission & PG&E Co. Concerning Responses to Requests for Additional Info. for Renewal Application ML1019004182010-06-28028 June 2010 Quick View Chart ML1007104232010-03-12012 March 2010 Diesel Relay Setpoint Changes ML0835402612008-12-17017 December 2008 Shoreline Fault Characterization Schedule ML0906902942008-11-21021 November 2008 Meeting Slide, Spectra 6.5 Slide from Pacific Gas and Electric Regarding License Amendment Request Re AFW System and CST, Diablo Canyon Power Plant, Unit Nos. 1 and 2 ML11166A2072008-10-10010 October 2008 Water Supplier Table DCL-10-083, Water Supplier Table2008-10-10010 October 2008 Water Supplier Table DCL-08-021, Revision to the Unit 1 Reactor Vessel Material Surveillance Program Withdrawal Schedule2008-03-12012 March 2008 Revision to the Unit 1 Reactor Vessel Material Surveillance Program Withdrawal Schedule ML0728203072007-10-11011 October 2007 Electronic Distribtion Initiative Letter, Licensee List, Electronic Distribution Input Information, Division Plant Mailing Lists DCL-06-080, PG&E Response to NRC Request for Additional Information Regarding, Special Report 06-01 - Results of Steam Generator (SG) Tube Inspections for Diablo Canyon, Unit 1 Thirteenth Refueling Outage2006-06-23023 June 2006 PG&E Response to NRC Request for Additional Information Regarding, Special Report 06-01 - Results of Steam Generator (SG) Tube Inspections for Diablo Canyon, Unit 1 Thirteenth Refueling Outage 2023-05-25 |
Text
Diablo Canyon Power Plant (DCPP) Wastewater Treatment Unit Schematic Decanter Arm Effluent Weir SSludge Holding Tank Blowers Effluent Line Sludge Holding Tank Dewatering Pump Diffusers (4)Cabinet f Flow MeterfI Con~o Pang f MT Blower Air Une MT BlowersAir Une*6 I-USewage Influent line w