MONTHYEARML23241A1532023-05-25025 May 2023 7 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-2, Drawing 102002, 6A, Rev. 113, Condensate System ML23241A6112023-05-25025 May 2023 7 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.8-59, Drawing 439509, Sheet 1, Rev. 4, Mechanical Requirements for 125 Ton Crane Auxiliary Building Fuel Handling Area ML23241A5682023-05-25025 May 2023 7 to Updated Final Safety Analysis Report, Chapter 7, Figure 7.2-1, Drawing 495849, Revision 7, Sheet 1, I & C Functional Logic Diagram Rod Controls & Rod Blocks ML23241A5182023-05-25025 May 2023 7 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-19, Drawing 108019, Sheet 6B, Rev. 18, Liquid Radwaste Media Filters and Radwaste Ion Exchangers ML23241A3362023-05-25025 May 2023 7 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-21, Drawing 108021, Sheet 5A, Rev. 44, Combustion Air and Exhaust System 2-2 ML23241A2542023-05-25025 May 2023 7 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-13, Drawing 108013, Sheet 2, Rev. 37, Spent Fuel Pit Cooling System ML23241A2032023-05-25025 May 2023 7 to Updated Final Safety Analysis Report, Chapter 7, Figure 7.2-1, Drawing 495885, Revision 5, Sheet 1, I & C Functional Logic Diagram Auxiliary Feedwater Pumps Startup DCL-22-039, Irradiated Fuel Management Plan, Revision 12022-10-12012 October 2022 Irradiated Fuel Management Plan, Revision 1 ML22108A1652022-05-0303 May 2022 Enclosure 2 - Timeline of Event ML21305A4022021-10-11011 October 2021 6 to Updated Final Safety Analysis Report, Figure 3.2-23, Sheet 22 of 53, Drawing 108023, Revision 75, Sheet 13, Ventilation & Air Conditioning Systems ML19259A1112019-09-16016 September 2019 Exemption Spreadsheet ML16314C2912016-11-0909 November 2016 Graphics, Charts and Tables for Pacific Gas & Electric Co. SER 7 Item (6) Subitem (5)(d) ML16083A5512016-03-30030 March 2016 Interim Staff Response to Reevaluated Flood Hazards Submitted in Response to 10 CFR 50.54(f) Information Request - Flood-Causing Mechanism Reevaluation ML16056A1392016-03-11011 March 2016 Correction to the U.S. Nuclear Regulatory Commission Analysis of Licensees' Decommissioning Funding Status Reports ML16004A3552015-12-17017 December 2015 Response to NRC Request for Additional Information Regarding License Amendment Request 15-03, Regulatory Guide 1.183 Conformance Tables, Revision 1 ML16048A2082015-12-15015 December 2015 Wastewater Treatment Unit Schematic ML16048A2152015-12-15015 December 2015 Fleet Vehicle-Asset List DCL-15-131, Pressurizer Spray Line Pipe Weld Flaw Evaluation, Calculation Package, Part 22015-11-0303 November 2015 Pressurizer Spray Line Pipe Weld Flaw Evaluation, Calculation Package, Part 2 ML15233A0062015-09-10010 September 2015 Summary of Meeting with Pacific Gas and Electric Company to Discuss Digital Replacement of Process Protection System at Diablo Canyon Power Plant, Units 1 and 2 ML16133A0792015-07-0101 July 2015 NRC to Nfms Second Scoping Letter July 1 2015 ML15160A261 ML16048A2122014-12-31031 December 2014 Hazardous Waste Volume Trends 1994-2014 ML14307B7072014-12-10010 December 2014 Supplemental Information Related to Development of Seismic Risk Evaluations for Information Request Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Seismic Hazard Reevaluations for Recommendation 2.1 of the Near-T ML14330A6392014-11-26026 November 2014 One-Hundred-Twenty-Day Response to NRC Request for Additional Information - National Fire Protection Association Standard 805, Part 2 of 2 DCL-14-110, One-Hundred-Twenty-Day Response to NRC Request for Additional Information - National Fire Protection Association Standard 805, Part 1 of 22014-11-26026 November 2014 One-Hundred-Twenty-Day Response to NRC Request for Additional Information - National Fire Protection Association Standard 805, Part 1 of 2 DCL-14-081, Diablo Canyon Units 1 and 2, Central Coastal California Seismic Imaging Project (Cccsip) Chapter 2, GEO.DCPP.TR.12.01 R1 Figures 09-02-142014-09-10010 September 2014 Diablo Canyon Units 1 and 2, Central Coastal California Seismic Imaging Project (Cccsip) Chapter 2, GEO.DCPP.TR.12.01 R1 Figures 09-02-14 DCL-14-081, Diablo Canyon Units 1 and 2, Central Coastal California Seismic Imaging Project (Cccsip) Chapter 5, GEO.DCPP.TR.14.04 R0 App A-G Figures 08-06-142014-09-10010 September 2014 Diablo Canyon Units 1 and 2, Central Coastal California Seismic Imaging Project (Cccsip) Chapter 5, GEO.DCPP.TR.14.04 R0 App A-G Figures 08-06-14 ML14260A0432014-09-10010 September 2014 Central Coastal California Seismic Imaging Project (Cccsip) Chapter 5, GEO.DCPP.TR.14.04 R0 App A-G Figures 08-06-14 ML14260A0332014-09-10010 September 2014 Central Coastal California Seismic Imaging Project (Cccsip) Chapter 2, GEO.DCPP.TR.12.01 R1 Figures 09-02-14 ML13148A4202013-06-0606 June 2013 2/20/13 Summary of Public Meeting with Pacific Gas and Electric Company to Discuss Digital Replacement of Process Protection System at Diablo Canyon Power Plant, Units 1 and 2 ML12341A1232012-12-19019 December 2012 Summary of Meeting Via Teleconference with Pacific Gas and Electric Company to Discuss Digital Replacement of Process Protection System at Diablo Canyon Power Plant, Units 1 and 2 ML12200A1272012-08-0202 August 2012 Summary of Meeting with Pacific Gas and Electric Company to Discuss Digital Replacement of Process Protection System at Diablo Canyon Power Plant, Units 1 and 2 ML1214500142012-05-23023 May 2012 NFPA 805 LAR Status Matrix - May 2012 DCL-12-041, 2011 Annual Radiological Environmental Operating Report. Part 4 of 52012-04-16016 April 2012 2011 Annual Radiological Environmental Operating Report. Part 4 of 5 ML12125A3872012-04-16016 April 2012 2011 Annual Radiological Environmental Operating Report. Part 4 of 5 ML1117206342011-06-20020 June 2011 Draft Seismic Information Evaluation Flowchart ML1109101462011-03-31031 March 2011 Licensee Slides from 3/31/11 Meeting with Pacific Gas and Electric Company Deterministic Comparison ML1109101572011-03-31031 March 2011 Licensee Slides from 3/31/11 Meeting with Pacific Gas and Electric Company Change in Probabilistic Hazard DCL-11-023, Response to Summary of Telephone Conference Call Held on 02/28/2011, Between U.S. Nuclear Regulatory Commission & PG&E Co. Concerning Responses to Requests for Additional Info. for Renewal Application2011-03-25025 March 2011 Response to Summary of Telephone Conference Call Held on 02/28/2011, Between U.S. Nuclear Regulatory Commission & PG&E Co. Concerning Responses to Requests for Additional Info. for Renewal Application ML1019004182010-06-28028 June 2010 Quick View Chart ML1007104232010-03-12012 March 2010 Diesel Relay Setpoint Changes ML0835402612008-12-17017 December 2008 Shoreline Fault Characterization Schedule ML0906902942008-11-21021 November 2008 Meeting Slide, Spectra 6.5 Slide from Pacific Gas and Electric Regarding License Amendment Request Re AFW System and CST, Diablo Canyon Power Plant, Unit Nos. 1 and 2 ML11166A2072008-10-10010 October 2008 Water Supplier Table DCL-10-083, Water Supplier Table2008-10-10010 October 2008 Water Supplier Table DCL-08-021, Revision to the Unit 1 Reactor Vessel Material Surveillance Program Withdrawal Schedule2008-03-12012 March 2008 Revision to the Unit 1 Reactor Vessel Material Surveillance Program Withdrawal Schedule ML0728203072007-10-11011 October 2007 Electronic Distribtion Initiative Letter, Licensee List, Electronic Distribution Input Information, Division Plant Mailing Lists DCL-06-080, PG&E Response to NRC Request for Additional Information Regarding, Special Report 06-01 - Results of Steam Generator (SG) Tube Inspections for Diablo Canyon, Unit 1 Thirteenth Refueling Outage2006-06-23023 June 2006 PG&E Response to NRC Request for Additional Information Regarding, Special Report 06-01 - Results of Steam Generator (SG) Tube Inspections for Diablo Canyon, Unit 1 Thirteenth Refueling Outage 2023-05-25
[Table view] |
Text
Timeline of Events Date Event 20APR2009 Operating experience on external corrosion under insulation posted to Institute of Nuclear Power Operations (INPO) database (proprietary information).
19APR2010 Operating experience on external corrosion under insulation posted to INPO database (proprietary information).
14NOV2013 NRC issues LR-ISG-2012-02, Aging Management of Internal Surfaces, Fire Water Systems, Atmospheric Storage Tanks, and Corrosion under Insulation. It is not applicable to Diablo Canyon Nuclear Power Plant (DCNPP) because DCNPP is not in its extended license period.
1JAN2020 Coronavirus Disease 2019 (COVID-19) public health emergency (PHE) declared.
10JAN2020 Resident inspectors tour affected Unit 2 pipe space for 12 minutes 15FEB2020 Resident inspectors tour affected Unit 2 pipe space for 8 minutes 9MAR2020 Resident inspectors tour affected Unit 2 pipe space for 9 minutes 16MAR2020 NRC staff ordered to full telework due to the COVID-19 PHE.
19MAR2020 The California Governor issues a stay-at-home order; resident inspectors are exempt under Federal critical infrastructure classification.
19MAR2020 Initial resident office site coverage guidance is issued. Residents are directed to visit the site once every 3 days in accordance with the guidance in Inspection Manual Chapter 2515, Light-Water Reactor Inspection ProgramOperations Phase.
31MAR2020 The NRC Office of Nuclear Reactor Regulation hosts an inspector townhall, and the Office Director makes clear that inspectors priority should be their personal safety with respect to COVID-19.
6APR2020 Updated guidance on resident site coverage is provided through a memorandum (ADAMS Accession No. ML20097E538, publicly available at:
Guidance For Resident Inspectors l NRC.gov) that reiterates the 3-day requirement and provides some additional guidance.
13APR2020 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> charged to Inspection Procedure (IP) 71111.04, Equipment Alignment.
13APR2020 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />, 21 minutes logged in the vicinity of Unit 1 or 2 auxiliary feedwater (AFW) equipment.
14APR2020 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> charged to IP 71111.04.
20APR2020 3 hours3.472222e-5 days <br />8.333333e-4 hours <br />4.960317e-6 weeks <br />1.1415e-6 months <br /> charged to IP 71111.04.
20APR2020 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />, 44 minutes logged in the vicinity of Unit 1 or 2 AFW equipment.
27APR2020 0.5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br /> charged to IP 71111.04.
27APR2020 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />, 2 minutes logged in the vicinity of Unit 1 or 2 AFW equipment.
8JUN2020 Resident inspectors tour Unit 2 affected pipe space for 8 minutes.
8JUL2020 Resident inspectors tour Unit 2 affected pipe space for 6 minutes.
17JUL2020 Unit 2 shut down due to hydrogen leak in main turbine generator; AFW placed in service and pipe pressurized.
22JUL2020 DCNPP Integrated Inspection Report 2020002 issued, documenting complete system walkdown.
23JUL2020 Leak discovered on elbow downstream of LCV-111, SG 2-2 AFW Control Valve; Unit 2 cools down from Mode 3 to Mode 4 to meet Limiting Condition for Operation 3.7.5.D.2.
30JUL2020 DCNPPs extent of condition inspection discovers seven AFW pipe locations requiring repair to the standards of the American Society of Mechanical Engineers.
Enclosure 2
Timeline of Events Date Event 31JUL2020 Unit 2 declares AFW operable.
3AUG2020 Unit 2 returned to full power.
29OCT2020 DCNPP Integrated Inspection Report 2020003 issued, documenting green finding.
25MAR2022 OIG CASE No.20-025 special inquiry issued.
Note 1: The gray portion is the period within the scope of the system alignment inspection.
Note 2: Inspectors toured the plant on multiple occasions during the period in question, this timeline only highlights those times and areas pertinent to the OIG inquiry.