Category:Graphics incl Charts and Tables
MONTHYEARML23241A1532023-05-25025 May 2023 7 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-2, Drawing 102002, 6A, Rev. 113, Condensate System ML23241A2032023-05-25025 May 2023 7 to Updated Final Safety Analysis Report, Chapter 7, Figure 7.2-1, Drawing 495885, Revision 5, Sheet 1, I & C Functional Logic Diagram Auxiliary Feedwater Pumps Startup ML23241A2542023-05-25025 May 2023 7 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-13, Drawing 108013, Sheet 2, Rev. 37, Spent Fuel Pit Cooling System ML23241A3362023-05-25025 May 2023 7 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-21, Drawing 108021, Sheet 5A, Rev. 44, Combustion Air and Exhaust System 2-2 ML23241A5182023-05-25025 May 2023 7 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-19, Drawing 108019, Sheet 6B, Rev. 18, Liquid Radwaste Media Filters and Radwaste Ion Exchangers ML23241A5682023-05-25025 May 2023 7 to Updated Final Safety Analysis Report, Chapter 7, Figure 7.2-1, Drawing 495849, Revision 7, Sheet 1, I & C Functional Logic Diagram Rod Controls & Rod Blocks ML23241A6112023-05-25025 May 2023 7 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.8-59, Drawing 439509, Sheet 1, Rev. 4, Mechanical Requirements for 125 Ton Crane Auxiliary Building Fuel Handling Area DCL-22-039, Irradiated Fuel Management Plan, Revision 12022-10-12012 October 2022 Irradiated Fuel Management Plan, Revision 1 ML22108A1652022-05-0303 May 2022 Enclosure 2 - Timeline of Event ML21305A4022021-10-11011 October 2021 6 to Updated Final Safety Analysis Report, Figure 3.2-23, Sheet 22 of 53, Drawing 108023, Revision 75, Sheet 13, Ventilation & Air Conditioning Systems ML19259A1112019-09-16016 September 2019 Exemption Spreadsheet ML16314C2912016-11-0909 November 2016 Graphics, Charts and Tables for Pacific Gas & Electric Co. SER 7 Item (6) Subitem (5)(d) ML16083A5512016-03-30030 March 2016 Interim Staff Response to Reevaluated Flood Hazards Submitted in Response to 10 CFR 50.54(f) Information Request - Flood-Causing Mechanism Reevaluation ML16056A1392016-03-11011 March 2016 Correction to the U.S. Nuclear Regulatory Commission Analysis of Licensees' Decommissioning Funding Status Reports ML16004A3552015-12-17017 December 2015 Response to NRC Request for Additional Information Regarding License Amendment Request 15-03, Regulatory Guide 1.183 Conformance Tables, Revision 1 ML16048A2082015-12-15015 December 2015 Wastewater Treatment Unit Schematic ML16048A2152015-12-15015 December 2015 Fleet Vehicle-Asset List DCL-15-131, Pressurizer Spray Line Pipe Weld Flaw Evaluation, Calculation Package, Part 22015-11-0303 November 2015 Pressurizer Spray Line Pipe Weld Flaw Evaluation, Calculation Package, Part 2 ML15233A0062015-09-10010 September 2015 Summary of Meeting with Pacific Gas and Electric Company to Discuss Digital Replacement of Process Protection System at Diablo Canyon Power Plant, Units 1 and 2 ML16133A0792015-07-0101 July 2015 NRC to Nfms Second Scoping Letter July 1 2015 ML15160A261 ML16048A2122014-12-31031 December 2014 Hazardous Waste Volume Trends 1994-2014 ML14307B7072014-12-10010 December 2014 Supplemental Information Related to Development of Seismic Risk Evaluations for Information Request Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Seismic Hazard Reevaluations for Recommendation 2.1 of the Near-T ML14330A6392014-11-26026 November 2014 One-Hundred-Twenty-Day Response to NRC Request for Additional Information - National Fire Protection Association Standard 805, Part 2 of 2 DCL-14-110, One-Hundred-Twenty-Day Response to NRC Request for Additional Information - National Fire Protection Association Standard 805, Part 1 of 22014-11-26026 November 2014 One-Hundred-Twenty-Day Response to NRC Request for Additional Information - National Fire Protection Association Standard 805, Part 1 of 2 DCL-14-081, Diablo Canyon Units 1 and 2, Central Coastal California Seismic Imaging Project (Cccsip) Chapter 2, GEO.DCPP.TR.12.01 R1 Figures 09-02-142014-09-10010 September 2014 Diablo Canyon Units 1 and 2, Central Coastal California Seismic Imaging Project (Cccsip) Chapter 2, GEO.DCPP.TR.12.01 R1 Figures 09-02-14 DCL-14-081, Diablo Canyon Units 1 and 2, Central Coastal California Seismic Imaging Project (Cccsip) Chapter 5, GEO.DCPP.TR.14.04 R0 App A-G Figures 08-06-142014-09-10010 September 2014 Diablo Canyon Units 1 and 2, Central Coastal California Seismic Imaging Project (Cccsip) Chapter 5, GEO.DCPP.TR.14.04 R0 App A-G Figures 08-06-14 ML14260A0332014-09-10010 September 2014 Central Coastal California Seismic Imaging Project (Cccsip) Chapter 2, GEO.DCPP.TR.12.01 R1 Figures 09-02-14 ML14260A0432014-09-10010 September 2014 Central Coastal California Seismic Imaging Project (Cccsip) Chapter 5, GEO.DCPP.TR.14.04 R0 App A-G Figures 08-06-14 ML13148A4202013-06-0606 June 2013 2/20/13 Summary of Public Meeting with Pacific Gas and Electric Company to Discuss Digital Replacement of Process Protection System at Diablo Canyon Power Plant, Units 1 and 2 ML12341A1232012-12-19019 December 2012 Summary of Meeting Via Teleconference with Pacific Gas and Electric Company to Discuss Digital Replacement of Process Protection System at Diablo Canyon Power Plant, Units 1 and 2 ML12200A1272012-08-0202 August 2012 Summary of Meeting with Pacific Gas and Electric Company to Discuss Digital Replacement of Process Protection System at Diablo Canyon Power Plant, Units 1 and 2 ML1214500142012-05-23023 May 2012 NFPA 805 LAR Status Matrix - May 2012 DCL-12-041, 2011 Annual Radiological Environmental Operating Report. Part 4 of 52012-04-16016 April 2012 2011 Annual Radiological Environmental Operating Report. Part 4 of 5 ML12125A3872012-04-16016 April 2012 2011 Annual Radiological Environmental Operating Report. Part 4 of 5 ML1117206342011-06-20020 June 2011 Draft Seismic Information Evaluation Flowchart ML1109101572011-03-31031 March 2011 Licensee Slides from 3/31/11 Meeting with Pacific Gas and Electric Company Change in Probabilistic Hazard ML1109101462011-03-31031 March 2011 Licensee Slides from 3/31/11 Meeting with Pacific Gas and Electric Company Deterministic Comparison DCL-11-023, Response to Summary of Telephone Conference Call Held on 02/28/2011, Between U.S. Nuclear Regulatory Commission & PG&E Co. Concerning Responses to Requests for Additional Info. for Renewal Application2011-03-25025 March 2011 Response to Summary of Telephone Conference Call Held on 02/28/2011, Between U.S. Nuclear Regulatory Commission & PG&E Co. Concerning Responses to Requests for Additional Info. for Renewal Application ML1019004182010-06-28028 June 2010 Quick View Chart ML1007104232010-03-12012 March 2010 Diesel Relay Setpoint Changes ML0835402612008-12-17017 December 2008 Shoreline Fault Characterization Schedule ML0906902942008-11-21021 November 2008 Meeting Slide, Spectra 6.5 Slide from Pacific Gas and Electric Regarding License Amendment Request Re AFW System and CST, Diablo Canyon Power Plant, Unit Nos. 1 and 2 ML11166A2072008-10-10010 October 2008 Water Supplier Table DCL-10-083, Water Supplier Table2008-10-10010 October 2008 Water Supplier Table DCL-08-021, Revision to the Unit 1 Reactor Vessel Material Surveillance Program Withdrawal Schedule2008-03-12012 March 2008 Revision to the Unit 1 Reactor Vessel Material Surveillance Program Withdrawal Schedule ML0728203072007-10-11011 October 2007 Electronic Distribtion Initiative Letter, Licensee List, Electronic Distribution Input Information, Division Plant Mailing Lists DCL-06-080, PG&E Response to NRC Request for Additional Information Regarding, Special Report 06-01 - Results of Steam Generator (SG) Tube Inspections for Diablo Canyon, Unit 1 Thirteenth Refueling Outage2006-06-23023 June 2006 PG&E Response to NRC Request for Additional Information Regarding, Special Report 06-01 - Results of Steam Generator (SG) Tube Inspections for Diablo Canyon, Unit 1 Thirteenth Refueling Outage 2023-05-25
[Table view] Category:Updated Final Safety Analysis Report (UFSAR)
MONTHYEARL-23-011, Independent Spent Fuel Storage Installation Biennial Submittal of Updated Final Safety Analysis Report2023-12-14014 December 2023 Independent Spent Fuel Storage Installation Biennial Submittal of Updated Final Safety Analysis Report ML23241A7582023-05-25025 May 2023 7 to Updated Final Safety Analysis Report, Chapter 1, Figure 1.2-3, Drawing 500001, Rev. 1, Piping and Mechanical Area Locaiton Plan ML23241A7772023-05-25025 May 2023 7 to Updated Final Safety Analysis Report, Chapter 7, Figure 8.3-10, Drawing 437626, Rev. 34, Sheet 1, Electrical Schematic Diagram 4160V Bus G Automatic Transfer ML23241A7792023-05-25025 May 2023 7 to Updated Final Safety Analysis Report, Chapter 2, Figure 2.4-8, Drawing 469001, Rev. 3, Restored Cross Sections & Embedment Plan Breakwaters - Restoration & Improvements ML23241A7762023-05-25025 May 2023 Submittal of Revision 27 to Updated Final Safety Analysis Report ML23241A7282023-05-25025 May 2023 7 to Updated Final Safety Analysis Report, Chapter 9, Figure 9.5-9, Drawing 438165, Revision 14, Civil Emergency Diesel Generator Fuel Oil System, Sheet 1 ML23241A7462023-05-25025 May 2023 7 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-1, Drawing 102023, Rev. 57, Sheet 2 ML23241A7622023-05-25025 May 2023 7 to Updated Final Safety Analysis Report, Chapter 8, Figure 8.3-12, Drawing 496280, Rev. 4, Sheet 1, Electrical Schematic Diagram 4160KV Diesel Generator Control No. 23 ML23241A7552023-05-25025 May 2023 7 to Updated Final Safety Analysis Report, Chapter 8, Figure 8.3-17, Drawing 441240, Revision 48, Electrical Single Line Meter and Relay Diagram 125V D.C. System, Sheet 1 ML23241A7702023-05-25025 May 2023 7 to Updated Final Safety Analysis Report, Chapter 8, Figure 8.3-12, Drawing 437667, Rev. 47, Sheet 1, Electrical Schematic Diagram 4KV Diesel Generator Control No. 13 ML23241A7632023-05-25025 May 2023 7 to Updated Final Safety Analysis Report, Chapter 8, Figure 8.3-6, Drawing 437916, Revision 48, Electrical Single Line Meter and Relay Diagram 480 Volt System Bus Section 1F, Sheet 1 ML23241A7602023-05-25025 May 2023 7 to Updated Final Safety Analysis Report, Chapter 8, Figure 8.3-12, Drawing 441358, Rev. 43, Sheet 1, Electrical Schematic Diagram 4KV Diesel Generator Control No. 21 & 22 ML23241A7572023-05-25025 May 2023 7 to Updated Final Safety Analysis Report, Chapter 8, Figure 8.3-8, Drawing 441239, Sheet 1, Rev. 48, Electrical Single Line Meter & Relay Diagram 480 Volt System Bus Section 2H ML23241A7472023-05-25025 May 2023 7 to Updated Final Safety Analysis Report, Chapter 8, Figure 8.3-19, Drawing 437545, Revision 10, Sheet 1, Electrical Single Line Diagram Pressurized Heaters ML23241A7612023-05-25025 May 2023 7 to Updated Final Safety Analysis Report, Chapter 8, Figure 8.3-7, Drawing 441238, Rev. 54, Sheet 1, Electrical Single Line Meter & Relay Diagram 480 V System Bus Section 2G ML23241A7642023-05-25025 May 2023 7 to Updated Final Safety Analysis Report, Chapter 8, Figure 8.3-12, Drawing 496277, Rev. 7, Sheet 1, Electrical Schematic Diagram 4160KV Diesel Generator Control No. 23 ML23241A7662023-05-25025 May 2023 7 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-2, Drawing 102002, Revision 111, Sheet 4, Condensate System ML23241A7712023-05-25025 May 2023 7 to Updated Final Safety Analysis Report, Chapter 8, Figure 8.3-13, Drawing 496276, Revision 7, Electrical Schematic Diagram 4160V Diesel Generator No. 23 and Associated Circuit Breaker, Sheet 1 ML23241A7412023-05-25025 May 2023 7 to Updated Final Safety Analysis Report, Chapter 8, Figure 8.3-11, Drawing 441354, Rev. 33, Sheet 1, Electrical Schematic Diagram 4160 V Bus Section H Automatic Transfer ML23241A7392023-05-25025 May 2023 7 to Updated Final Safety Analysis Report, Chapter 9, Figure 9.4-2, Drawing 59316, Revision 23, Mechanical Ventilation Flow Diagram Auxiliary Building Engineered Safety Equipment Area, Sheet 1 ML23241A7442023-05-25025 May 2023 7 to Updated Final Safety Analysis Report, Chapter 8, Figure 8.3-16, Drawing 441286, Revision 11, Sheet 1, Electrical Logic Diagram 4160 Volt Bus Section F Automatic Transfer ML23241A7782023-05-25025 May 2023 7 to Updated Final Safety Analysis Report, Chapter 9, Figure 9.4-2, Drawing 501365, Revision 18, Mechanial Ventilation Flow Diagram Auxiliary Building Engineered Safety Equipment Area, Sheet 1 ML23241A7502023-05-25025 May 2023 7 to Updated Final Safety Analysis Report, Chapter 8, Figure 8.3-20, Drawing 437614, Revision 37, Electrical Schematic Diagram Bus Potential & Synchronizing 4160V System, Sheet 1 ML23241A7302023-05-25025 May 2023 7 to Updated Final Safety Analysis Report, Chapter 2, Figure 2.4-7, Drawing 468999-1, Layout, Details, Notes ML23241A7492023-05-25025 May 2023 7 to Updated Final Safety Analysis Report, Chapter 8, Figure 8.3-7, Drawing 437542, Sheet 1, Rev. 57, Electrical Single Line Meter & Relay Diagram 480 Volt System Bus Section 1G ML23241A7332023-05-25025 May 2023 7 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-1, Drawing 108001-3, Sheet 3 of 3 ML23241A7382023-05-25025 May 2023 7 to Updated Final Safety Analysis Report, Chapter 8, Figure 8.3-16, Drawing 458864, Rev. 18, Sheet 1, Electrical Logic Diagram 4160 Volt Bus Section G Automatic Transfer ML23241A7312023-05-25025 May 2023 7 to Updated Final Safety Analysis Report, Chapter 8, Figure 8.3-14, Drawing 437674, Revision 32, Sheet 1, Electrical Schematic Diagram 4KV Diesel Generators Auxiliary Motors ML23241A7592023-05-25025 May 2023 7 to Updated Final Safety Analysis Report, Chapter 8, Figure 8.3-4, Drawing 441230, Revision 34, Electrical Single Line Meter & Relay Diagram 4160V System Bus Section G & H: DG 21 & 22, Sheet 1 ML23241A7402023-05-25025 May 2023 7 to Updated Final Safety Analysis Report, Chapter 8, Figure 8.3-8, Drawing 437543, Revision 52, Electrical Single Line Meter & Relay Diagram 480 V System Bus Section H, Sheet 1 ML23241A7562023-05-25025 May 2023 7 to Updated Final Safety Analysis Report, Chapter 8, Figure 8.3-13, Drawing 437676, Rev. 29, Sheet 1, Electrical Schematic Diagram 4KV Diesel Generators and Associated Circuit Breakers ML23241A7802023-05-25025 May 2023 7 to Updated Final Safety Analysis Report, Chapter 8, Figure 8.3-9, Drawing 441352, Revision 26, Electrical Schematic Diagram 4160V Bus Section F Automatic Transfer, Sheet 1 ML23241A7342023-05-25025 May 2023 7 to Updated Final Safety Analysis Report, Chapter 8, Figure 8.3-12, Drawing 441357, Rev. 44, Sheet 1, Electrical Schematic Diagram 4KV Diesel Generator Control No. 21 & 22 DCL-23-044, 7 to Updated Final Safety Analysis Report, Chapter 9, Figure 9.4-10, Drawing 512904, Revision 15, Mechanical Air Monitoring Technical Support Center and Post-Accident Sampling System Air Flow Diagrams2023-05-25025 May 2023 7 to Updated Final Safety Analysis Report, Chapter 9, Figure 9.4-10, Drawing 512904, Revision 15, Mechanical Air Monitoring Technical Support Center and Post-Accident Sampling System Air Flow Diagrams ML23241A7672023-05-25025 May 2023 7 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-1, Drawing 108023, Rev 36, Sheet 2 ML23241A7532023-05-25025 May 2023 7 to Updated Final Safety Analysis Report, Chapter 9, Figure 9.4-11, Drawing 516111, Sheet 1, Rev. 5, Mechanical Plans, Sections & Details Area L & GE Elev. 140'-0 ML23241A7522023-05-25025 May 2023 7 to Updated Final Safety Analysis Report, Chapter 9, Figure 9.4-8, Drawing 516103, Revision 16, Mechanical Ventilation Flow Diagrams, Sheet 1 ML23241A7732023-05-25025 May 2023 7 to Updated Final Safety Analysis Report, Chapter 8, Figure 8.3-5, Drawing 437530, Revision 41, Electrical Single Line Meter & Relay Diagram 12KV Start-Up System, Sheet 1 ML23241A7292023-05-25025 May 2023 7 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-1, Drawing 102001, Rev. 19, Sheet 3, Piping Schematic Legend ML23241A7752023-05-25025 May 2023 7 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-2, Drawing 102002, Sheet 5, Rev. 112, Condensate System ML23241A7482023-05-25025 May 2023 7 to Updated Final Safety Analysis Report, Chapter 9, Figure 9.4-3, Drawing 59317, Sheet 1, Mechanical Flow Diagram Containment Fuel Handling & Fan Rooms ML23241A7372023-05-25025 May 2023 7 to Updated Final Safety Analysis Report, Chapter 8, Figure 8.3-13, Drawing 437665, Rev. 37, Sheet 1, Electrical Schematic Diagram 4KV Diesel Generator and Associated Circuit Breakers ML23241A7352023-05-25025 May 2023 7 to Updated Final Safety Analysis Report, Chapter 8, Figure 8.3-16, Drawing 441337, Revision 13, Sheet 1, Electrical Logic Diagram 4160KV Bus Section H Automatic Transfer ML23241A7682023-05-25025 May 2023 7 to Updated Final Safety Analysis Report, Chapter 8, Figure 8.3-18, Drawing 445295, Revision 13, Electrical Single Line Meter and Relay Diagram 125 Volt and 250 Volt D.C. System, Sheet 1 ML23241A7692023-05-25025 May 2023 7 to Updated Final Safety Analysis Report, Chapter 8, Figure 8.3-12, Drawing 496281, Rev. 8, Sheet 1, Electrical Schematic Diagram 4160KV Diesel Generator Control No. 23 ML23241A7652023-05-25025 May 2023 7 to Updated Final Safety Analysis Report, Chapter 8, Figure 8.3-13, Drawing 437666, Revision 8, Revision 21, Sheet 1, Electrical Schematic Diagram 4KV Diesel Generators and Associated Circuit Breakers ML23241A7742023-05-25025 May 2023 7 to Updated Final Safety Analysis Report, Chapter 8, Figure 8.3-11, Drawing 437627, Revision 38, Electrical Schematic Diagram 4160V Bus Section H Automatic Transfer, Sheet 1 ML23241A7722023-05-25025 May 2023 7 to Updated Final Safety Analysis Report, Chapter 8, Figure 8.3-16, Drawing 441297, Revision 14, Electrical Logic Diagram 4160 Volt Bus Section G Automatic Transfer, Sheet 1 ML23241A7452023-05-25025 May 2023 7 to Updated Final Safety Analysis Report, Chapter 8, Figure 8.3-20, Drawing 441340, Rev. 31, Sheet 1, Electrical Schematic Diagram Potential & Synchronizing Diagram 4160V Bus Sections F, G, & H ML23241A7812023-05-25025 May 2023 7 to Updated Final Safety Analysis Report, Chapter 8, Figure 8.3-10, Drawing 441353, Sheet 1, Rev. 30, Electrical Schematic Diagram 1460V Bus Section G Automatic Transfer 2023-05-25
[Table view] |