1CAN069203, Forwards Arkansas Nuclear One,Unit 1 Reactor Containment Bldg Integrated Leakage Rate Test Rept, for Apr 1992

From kanterella
Revision as of 00:43, 24 September 2022 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Arkansas Nuclear One,Unit 1 Reactor Containment Bldg Integrated Leakage Rate Test Rept, for Apr 1992
ML20101H813
Person / Time
Site: Arkansas Nuclear Entergy icon.png
Issue date: 06/25/1992
From: James Fisicaro
ENTERGY OPERATIONS, INC.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20101H815 List:
References
1CAN069203, 1CAN69203, NUDOCS 9206300208
Download: ML20101H813 (2)


Text

_,

g{ Entstgy Opstations,Inc.

Rve 3 ibn 13n.

Onera p ons n- a =

a sat. moo June 25.-1992 ICAN069203 U. S. Nuclear Regulatory Commission Document Control Desk l Hall Station P'i-137 Washington. DC 20$$5

Subject:

Arkansas Nuclear One - Unit 1 Docket No. 50-313 License No. DPR-51

-Reactor Centainment Building Integrated Leak Rate Test Peport Gentlemen During the recently completed tenth refueling outage (1R10) of Arkansas Nuclear One. Unit 1 (ANO-1). Latergy Operations conducted an integrated leakage rate test of the ANO-1 reactor building.: Currently, the next scheduled reactor building integrated. leak rate test is scheduled for the twelfth refueling outage (IP12).

In accordance with Surveillance Requirement 4.4.1.1.7 of the:ANO-1 Technical Specifications and 10CFR50 Appendix J.Section V.B. attached ic

(- one copy of the Reactor containment Building Integrated Leak kate Test report.

Should you have any questions regarding this submittal, please contact me.

Very truly yours.

James J. Fisicato Director. . Licensing JJF/RWC/sj f t Attachment 22900'70; _

h/1

[*^"o88Mf8g3- 1: y 7

a l U. S. NRC June 25, 1992 Page 2 f

cci Mr. Robert Martin

! U. S. Nuclear Regulatory Commission Region IV 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011-8064 NRC Seriior Resident Inspector Arkansas Nuclear One - ANO-1 & 2 Number 1 Nuclear Plant Road Russellville, AR 72801 l

Mr. Thomas W. Alexion NRR Proj ect Manager, Region IV/ANO-1 ,

U. S. Nuclear Regulatory Commission-NRR Mail Stop 13-H-3 One White Flint North 11555 Rockville Pike i Rockville, Maryland 20852 Ms. Sheri Peterson +

NRR Project Manager, Region IV//No-2  !

U, S. Nuclear Regulatory Commission  !

NRR Mail Stop'13-H-3 One White Flint North >

11555 Rockville Pike Rockville, Maryland 20852 i

1 4

II. -

l

. . . _ . . ,,.u...,_u_......,-_._ .,,.-,,a....;._,._.,

. _ _ . . , . , _ , , . . -.. _._....,_._a-....;_.,_.-,._.,_,,_--

- ::==:= y 4 .

ARKANSAS NUCLEAR ONE, UNIT 1 i

REACTOR CONTAINMENT I BUILDING INTEGRATED i

LEAKAGE RATE TEST REPORT l

APRIL 1992 1 1 ATTACHMENT TO LETTER DATED JUNE 23,1992, ICAN069203

+ 8

= wn.s

- . . -. - --. . - - . . .