MONTHYEARIR 05000397/20240052024-08-22022 August 2024 Updated Inspection Plan for Columbia Generating Station (Report 05000397/2024005) IR 05000397/20244032024-03-28028 March 2024 Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection 05000397/2024403 IR 05000397/20230062024-02-28028 February 2024 Annual Assessment Letter for Columbia Generating Station (Report 05000397/2023006) ML24032A2182023-09-0101 September 2023 Information Request, Security IR 2024401 IR 05000397/20230052023-08-22022 August 2023 Updated Inspection Plan for Columbia Generating Station (Report 05000397/2023005) - Mid Year Letter IR 05000397/20220062023-03-0101 March 2023 Annual Assessment Letter for Columbia Generating Station (Report 05000397/2022006) ML23019A2482023-01-19019 January 2023 Inservice Inspection Request for Information ML22242A1082022-08-30030 August 2022 Information Request, Information Request, Security IR 2022404 ML22230C7392022-08-23023 August 2022 2022 Mid-Cycle Planning Letter IR 05000397/20210062022-03-0202 March 2022 Annual Assessment Letter for Columbia Generating Station (Report 05000397/2021006) ML21277A3572021-10-12012 October 2021 CGS Brq RFI Letter, Columbia Generating Station - Notification of Inspection (NRC Inspection Report 05000397/2021004) and Request for Information ML21230A3892021-09-0101 September 2021 Mid-Cycle Inspection Plan Transmittal Letter 2021 ML21111A0282021-04-21021 April 2021 _ Notification of an NRC Fire Protection Baseline Inspection (NRC Inspection Report 05000397/2021011) and Request for Information ML21104A3032021-04-0808 April 2021 Inspection Report 05000397/2021010, Information Request Biennial Problem Identification and Resolution Inspection ML21082A3042021-03-23023 March 2021 Request for Information: Columbia Generating Station, Dated March 11, 2021, Inspection Report 05000397/2021-002, Occupational Radiation Safety Inspection-1,2,3,PI IR 05000397/20200062021-03-0303 March 2021 Annual Assessment Letter for Columbia Generating Station (Report 05000397/2020006) ML20353A1822020-12-18018 December 2020 Notification of NRC Triennial Heat Exchanger/Heat Sink Performance Inspection (05000397/2021001) and Request for Information IR 05000397/20200052020-09-0101 September 2020 Updated Inspection Plan for Columbia Generating Station (Report 05000397/2020005) IR 05000397/20190062020-03-0303 March 2020 CGS2019006 Annual Assessment Letter for Columbia Generating Station (Report 05000397/2019006) ML20049H2622020-02-18018 February 2020 Notification of Cyber Security Inspection (NRC Inspection Report 05000397/2020401) and Request for Information ML19266A5922019-09-23023 September 2019 Notification of Inspection (NRC Inspection Report 05000397/2019004) and Request for Information IR 05000397/20190052019-08-30030 August 2019 Updated Inspection Plan for Columbia Generating Station, Report 05000397/2019005 ML19100A4242019-04-10010 April 2019 Columba - Notification of NRC Design Bases Assurance Inspection Report (Teams) (05000397/2019011) and Initial Request for Information IR 05000397/20180062019-03-0404 March 2019 Annual Assessment Letter for Columbia Generating Station (Report 05000397/2018006 ML18313A0942018-11-0808 November 2018 Notification of NRC Triennial Heat Sink Performance Inspection Report 05000397/2018004) and Request for Information IR 05000397/20180052018-08-31031 August 2018 Updated Inspection Plan for Columbia Generating Station (Report 05000397/2018005) IR 05000397/20170062018-03-0101 March 2018 Annual Assessment Letter for Columbia Generating Station (Report 05000397/2017006) IR 05000397/20170052017-08-28028 August 2017 Updated Inspection Plan for Columbia Generating Station (Report 05000397/2017005) IR 05000397/20160062017-03-0101 March 2017 Annual Assessment Letter for Columbia Generating Station (Report 05000397/2016006) ML16256A2682016-09-12012 September 2016 Errata for Mid-Cycle Assessment Letter for Columbia Generating Station (Report 05000483/2016005) ML16251A1342016-09-0707 September 2016 Notification of Inspection (NRC Integrated Inspection Report 05000397/2016004) and Request for Information ML16239A2412016-08-31031 August 2016 Mid-Cycle Assessment Letter for Columbia Generating Station (Report 05000483/2016005) IR 05000397/20164012016-08-31031 August 2016 Non-Public Security Inspection Plan for Columbia Generating Station (NRC Physical Security Inspection Report Number 05000397/2016401) IR 05000397/20150062016-03-0202 March 2016 Annual Assessment Letter for Columbia Generating Station (Report 05000397/2015006) ML16061A5542016-03-0101 March 2016 Notification of NRC Design Bases Inspection (05000397/2016007) and Initial Request for Information ML16061A5662016-03-0101 March 2016 Notification of Design Bases Inspection (Programs)(Inspection Report 05000397/2016008) and Initial Request for Information IR 05000397/20154012015-09-0101 September 2015 Non-Public Security Inspection Plan for Columbia Generating Station (NRC Physical Security Inspection Report Number 05000397/2015401) IR 05000397/20150052015-09-0101 September 2015 Mid-Cycle Assessment Letter for Columbia Generating Station (Report 05000397/2015005) IR 05000397/20144022014-09-0202 September 2014 Non-Public Security Inspection Plan for Columbia Generating Station (NRC Physical Security Inspection Report Number 05000397/2014402) IR 05000397/20140062014-09-0202 September 2014 Mid-Cycle Assessment Letter for Columbia Generating Station (Report 05000397/2014006) ML14219A7512014-08-0707 August 2014 Notification of Evaluations of Changes, Tests, and Experiments, and Permanent Plant Modifications Inspection (05000397-14-005) and Request for Information IR 05000397/20130012014-03-0404 March 2014 Annual Assessment Letter for Columbia Generating Station (Report 05000397/2013001) IR 05000397/20130062013-09-0303 September 2013 Mid-Cycle Assessment Letter Columbia Generating Station (Report 05000397-13-006) IR 05000397/20128012013-03-0404 March 2013 Annual Assessment Letter for Columbia Generating Station (Report 05000397/2012801) IR 05000397/20120062012-09-0404 September 2012 Mid-Cycle Assessment Letter for Columbia Generating Station (Report 05000397/2012006) IR 05000397/20120012012-03-0505 March 2012 Annual Assessment Letter for Columbia Generating Station (Report 05000397/2012001) ML1124306472011-09-0101 September 2011 Mid-Cycle Performance Review and Inspection Plan - Columbia Generating Station ML1112907052011-05-0606 May 2011 Notification of Inspection (IR 05000397-11-004) and Request for Information ML1024403712010-09-0101 September 2010 Mid-Cycle Performance Review and Inspection Plan - Columbia Generating Station IR 05000397/20100012010-03-0303 March 2010 Annual Assessment Letter - Columbia Generating Station (Report 05000397-10-001) 2024-08-22
[Table view] Category:Request for Additional Information (RAI)
MONTHYEARML24296B1852024-10-16016 October 2024 NRR E-mail Capture - Final - Request for Additional Information - Columbia - Relief Request for Fourth Ten-Year Interval Inservice Testing - EPID: L-2024-LLR-0039 ML24215A3672024-08-0101 August 2024 NRR E-mail Capture - Final Request for Additional Information - Columbia Generating Station - License Amendment Request to Revise Emergency Plan - EPID L-2024-LLA-0011 ML24169A0402024-06-14014 June 2024 NRR E-mail Capture - Final Request for Additional Information - Columbia Generating Station (Columbia) - Relief Requests for the Fifth Ten-Year Interval Inservice Testing - EPIDs (L-2024-LLR-007 Through 0013) ML24058A0692024-03-14014 March 2024 Supplemental Information Needed for Acceptance of Requested Licensing Action Amendment Request for Emergency Plan ML24011A1522024-01-10010 January 2024 March 2024 Emergency Preparedness Exercise Inspection-Request for Information ML23110A2642023-04-20020 April 2023 Request for Information License Renewal Phase 2 Inspection ML22343A1802022-12-0808 December 2022 February 2023 Emergency Preparedness Program Inspection - Request for Information ML22301A1432022-10-28028 October 2022 NRR E-mail Capture - Final - Request for Additional Information - Columbia Generating Station - License Amendment Request to Adopt TSTF-505 - EPID L-2022-LLA-0023 ML22242A1082022-08-30030 August 2022 Information Request, Information Request, Security IR 2022404 ML22235A1052022-08-22022 August 2022 August 2022 Emergency Preparedness Exercise Inspection Request for Information IR 05000397/20224012022-06-0606 June 2022 Information Request for the Cyber-Security Baseline Inspection, Notification to Perform Inspection 05000397/2022401 ML22144A0342022-05-18018 May 2022 NRR E-mail Capture - Draft - Request for Additional Information - Columbia Generating Station - LAR to Change TS 3.4.11 - Reactor Coolant System Pressure and Temperature Limits - EPID L-2021-LLA-0191 ML22041A4572022-02-10010 February 2022 Notification of NRC Design Bases Assurance Inspection (Team) (05000397/2022010) and Request for Information ML21277A3572021-10-12012 October 2021 CGS Brq RFI Letter, Columbia Generating Station - Notification of Inspection (NRC Inspection Report 05000397/2021004) and Request for Information ML21216A0502021-08-0303 August 2021 NRR E-mail Capture - Final - Request for Additional Information - Columbia - License Amendment Request to Adopt TSTF-439, Eliminate Second Completion Times Limiting Time from Discovery of Failure to Meet an LCO EPID L-2021-LLA-0259 ML21209A9792021-07-28028 July 2021 NRR E-mail Capture - Final - Request for Additional Information - Columbia Generating Station - License Amendment Request to Remove License Condition 2.C.(34) and Revise License Condition 2.C.(35) - EPID L-2021-LLA-0074 ML21120A1182021-04-30030 April 2021 NRR E-mail Capture - Final - Request for Additional Information - Columbia Generating Station - On-Site Cooling System Sediment Disposal Approval Request - EPID L-2020-LLL-0031 ML21068A2842021-03-0404 March 2021 2021002 Inservice Inspection (ISI) Request for Information (RFI) ML20336A1852020-11-30030 November 2020 NRR E-mail Capture - Final - RAI - Columbia - One -Time Exemption from 10 CFR 73, App B, Sect VI, Subsection C.3.(l)(1) Regarding Annual Force-On-Force Exercises Due to COVID-19 Pandemic - EPID L-2020-LLE-0172 ML20325A0402020-11-19019 November 2020 NRR E-mail Capture - Draft - RAI - Columbia - One -Time Exemption from 10 CFR 73, Appendix B, Section VI, Subsection C.3.(I)(1) Regarding Annual Force -On-Force Exercises Due to COVID-19 Pandemic - EPID L-2020-LLE-0172 ML20267A5162020-09-23023 September 2020 NRR E-mail Capture - Columbia Generating Station - Final - Request for Additional Information - Fourth Ten-Year Interval Inservice Inspection (ISI) Program Relief Request 4ISI-09 - EPID L-2020-LLR-0068 ML20245E2822020-08-31031 August 2020 NRR E-mail Capture - Columbia Additional Request for Additional Information: Exigent License Amendment Request to Extend Technical Specification 3.8.7, Distribution Systems - Operating, Completion Time ML20239A9702020-08-26026 August 2020 NRR E-mail Capture - Columbia Additional Request for Additional Information: Exigent License Amendment Request to Extend Technical Specification 3.8.7, Distribution Systems - Operating, Completion Time ML20149K4362020-05-26026 May 2020 NRR E-mail Capture - Formal RAIs for Columbia (COVID-19) QA Plan Change Surveillance, Request Response by Tuesday June 2, 2020 ML20112F4572020-04-21021 April 2020 NRR E-mail Capture - Official Release of NRC RAIs for Columbia Covid Exigent Due Friday April 24, 2020 ML20034E6082020-02-0303 February 2020 NRR E-mail Capture - RAI Formal Release Columbia TSTF 563 LAR, 30 Day Response Period Due March 3, 2020 ML20028E1512020-01-27027 January 2020 Notification of Evaluations of Changes, Tests, and Experiments Inspection (Inspection Report 05000397/2020002) and Request for Information ML19267A1842019-09-24024 September 2019 Request for Information for Upcoming Open Phase Condition Inspection at Columbia Generating Station ML19232A2282019-08-20020 August 2019 NRR E-mail Capture - Formal Release of RAIs Ref: Columbia Exigent Amendment - One Electrical RAI, ML19183A4752019-07-0202 July 2019 NRR E-mail Capture - Formal Release of RAIs Ref: Columbia HVAC LAR L-2019-LLA-0034 ML18088A0152018-03-29029 March 2018 Notification of NRC Inspection of the Implementation of Mitigation Strategies and Spent Fuel Pool Instrumentation Orders and Emergency Preparedness Communication/ Staffing/Multi-Unit Dose Assessment Plans (05000397/2018010) and Request for ML17341B0272017-12-0707 December 2017 NRR E-mail Capture - RAI Associated with Columbia Amendment Request Revise Tech Spec 5.5.12 for Permanent Extension of Type a and Type C Containment Testing Frequencies for MF9469, EPID: L-2017-LLA-0197, ILRT, LLRT LAR - New RAI Response Da ML17292A0572017-10-18018 October 2017 NRR E-mail Capture - New RWCU RAI Due Date Now November 24, 2017 ML17249A6882017-09-0606 September 2017 NRR E-mail Capture - RAIs for Columbia Relief Request RAI (MF8925), 3ISI-19 ML17205A3152017-07-20020 July 2017 Notification of Evaluations of Changes, Tests, and Experiments Inspection (05000397/2017004) and Request for Information ML17193A2192017-07-12012 July 2017 NRR E-mail Capture - Columbia RWCU LAR MF8318, Formal Release of RAIs ML17144A1702017-05-24024 May 2017 NRR E-mail Capture - NRC RAIs for Columbia Relief Request MF8922, 3ISI-16 ML17047A7492017-02-16016 February 2017 Response to Request for Additional Information, Columbia Mur LAR Evib Rais ML17006A0902017-01-0404 January 2017 NRR E-mail Capture - Non Proprietary Request for Additional Information Regarding Columbia Mur Power Uprate ML17006A0922017-01-0404 January 2017 NRR E-mail Capture - Eicb RAIs for Columbia Mur ML16356A1382016-12-21021 December 2016 NRR E-mail Capture - Columbia Mur LAR Evib RAIs Non - Proprietary Version - Revise Operating License and Technical Specifications for Measurement Uncertainty Recapture Power Uprate ML16342C4322016-12-0707 December 2016 NRR E-mail Capture - Columbia Measurement Uncertainty Recapture Power Uprate LAR Rais: Human Performance: MF8060, Formal Release for Response on Monday January 9, 2017 ML16327A1842016-11-22022 November 2016 NRR E-mail Capture - Non Proprietary Request for Additional Information Regarding Columbia Mur Power Uprate ML16323A1192016-11-16016 November 2016 NRR E-mail Capture - Eicb RAIs for Columbia Mur ML16218A3902016-08-0808 August 2016 Supplemental Information Needed for Acceptance of Requested Licensing Action, Request for Measurement Uncertainty Recapture (Mur) Power Uprate (from 3486 Mwt to 3544 Mwt) ML16194A3702016-07-11011 July 2016 Notification of NRC Triennial Heat Sink Performance Inspection 05000397/2016003 and Request for Information ML16069A3592016-03-0909 March 2016 NRR E-mail Capture - Second Round Rais: Columbia MF6042 LAR TSTF-425 ML16061A5542016-03-0101 March 2016 Notification of NRC Design Bases Inspection (05000397/2016007) and Initial Request for Information ML16061A5662016-03-0101 March 2016 Notification of Design Bases Inspection (Programs)(Inspection Report 05000397/2016008) and Initial Request for Information ML15254A2572015-09-16016 September 2015 Request for Additional Information Associated with Near-Term Task Force Recommendation 2.1 Seismic Reevaluations 2024-08-01
[Table view] |
Text
Document Request List - CGS 71130.05, October 3-7, 2022 Please provide the attached information to the inspection team for in-office inspection and review to arrive at our regional office no later than September 20, 2022. Items may be provided on CERTREC/IMS, in hard copy, or a combination of both. NOTE: DO NOT forward any information on flash drives as current NRC procedures prohibit using this type of media unless issued by the NRC. Please properly package and mark SGI materials. If you have NON-SGI procedures or material that you can send via email, feel free to do so after you password protect them, david.holman@nrc.gov. Thank you in advance for your assistance.
Send to: Attention, Dave Holman / Wellington Tejada U.S. Nuclear Regulatory Commission 1600 E. Lamar Blvd.
Arlington TX 76011-4511 In an effort to keep the requested information organized please submit the information to us using the same lettering system below. For example, all contacts and phone numbers for each the first inspection procedure should be in a file/folder titled 1- A, Applicable organization charts in file/folder 1- B, etc.
General: All Security Event Log entries since August 26, 2022. Security Program Procedure indices for all procedures, instructions, desk-top guides, standing orders, etc.
The site Corrective Action Program procedure. The Safety Security Interface procedure.
Please state what revision of your physical security plan you are currently using.
Ensure staff follows all special packaging and marking requirements that may be necessary if mailing items.
Document Request List
- 1. Licensee Protective Strategy and Performance Evaluation Program (71130.05), Issue Dated 01/01/2019)
A. Condition Reports written since October 7, 2019, to September 12, 2022, that relate in any way to your Protective Strategy and/or Performance Evaluation Program, as related to the effectiveness of the onsite physical protection program and protective strategy, including drills and exercises. Please provide any additional Protective Strategy and Performance Evaluation Program CRs that may be written after September 12, 2022 while we are on site.
B. Any Protective Strategy related procedure or lower tier document. Also any procedure that covers contingency equipment available to the security force.
C. Security Program Reviews, audits, or self-assessments which in any way address the Protective Strategy and Performance Evaluation Program since October 10, 2019.
1
D. Provide documents/procedures that describe how the licensee will demonstrate and assess the effectiveness of the onsite physical protection program and protective strategy, to include: any implementing procedure or lower tier tool related to your PEP, any procedures or lower tier tool related to design and implementation of tactical drills and FOF exercise program.
E. Provide any procedure or lower tier document that governs your training and use of exercise controllers and the mock adversary force.
Please be prepared to provide the following items upon our arrival onsite.
F. Quarterly drill records w/participants, to include scenarios and critiques, since January 1, 2020. Also include tabletop drill records.
G. Annual exercise records, to include scenarios and critiques, since Jan 1, 2020.
H. A complete list of personnel that will be used as controllers during the exercise that you will be conducting during the week of October 3, 2022.
I. Exercise controller and mock adversary force training and records.
J. Any exercise scenarios that will or may be used during the exercise that you will be conducting during the week of October 3, 2020.
K. MILES weapons issue procedures and MILES no play areas.
Please be prepared to provide the following items during the on-site inspection.
L. Engineering standoff calculations related to DBT requirements related to human fragility for AR/ASOs.
M. Manufacturer or vendor manuals or data sheets supporting various barriers, BREs, etc.
N. Basis document for security force and adversary timelines, and a list of all timelines.
O. Current Target Set list.
P. Unattended Openings map and analysis.
Q. Documented copy of liaison established with LLEA R. Protective Strategy Brief, to include maps/overview of site footprint, with structures and OCA/PA boundaries and delays, and interior delays.
S. All current compensatory measures.
LAST ITEM FOR 71130.05 2