ML22013A277

From kanterella
Revision as of 02:17, 16 January 2022 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

2.4 Structural Scoping and Screening Breakout Questions
ML22013A277
Person / Time
Site: Saint Lucie  NextEra Energy icon.png
Issue date: 11/21/2021
From:
Office of Nuclear Reactor Regulation
To:
Rodriguez-Luccioni H
References
EPID L-2021-SLR-0002
Download: ML22013A277 (1)


Text

PSL SLRA: Breakout Questions SLRA Section 2.4 - Structural Scoping and Screening Note: Breakout Questions are provided to the applicant and will be incorporated into the publicly-available audit report.

Technical Reviewer Bryce Lehman 12/17/21 Technical Branch Chief Joseph Colaccino 12/20/21 Breakout Session Date/Time To be filled in by PM Applicant Staff NRC staff To be filled out by PM during breakout Question SLRA SLRA Background / Issue Discussion Question / Request Outcome of Discussion Number Section Page (As applicable/needed) 1 2.4.9 2.4-20 SLRA Section 2.4.9 notes that water Explain if the intake screens enters the intake structure and passes are within in the scope of SLR.

through stationary and traveling screens. If they are not within scope provide a technical SLRA Table 2.4-9 shows the structural justification. If they are in-scoping results for the intake structure but scope, identify the AMR that does not list intake screens as a addresses these components.

component receiving an AMR. It also does not list filter as an intended function for any of the components in the table.