|
---|
Category:- No Document Type Applies
MONTHYEARML23067A0522023-03-0808 March 2023 SLRA - Scoping and Screening, Sections 2.3.3.2 and 2.3.3.4 ML22013A2932021-12-21021 December 2021 Trp 45 St. Lucie SLRA - Breakout Questions Masonry Walls ML21356A0112021-12-17017 December 2021 Trp 148.3 and 148.4 St Lucie SLRA Breakout Questions ML21351A2482021-12-17017 December 2021 Trp 26 St. Lucie SLRA - Fire Protection Breakout Questions ML22013A2772021-11-21021 November 2021 2.4 Structural Scoping and Screening Breakout Questions ML19203A0182019-07-22022 July 2019 Public Notice of Exigent License Amendment Request ML18127A9102018-05-0707 May 2018 Figure 10.4.9B-3, Fault Tree of Lfow - Manual ML18127A9112018-05-0707 May 2018 Figure 10.4.9B-4, Fault Tree of Loop - Manual ML17073A1252017-03-14014 March 2017 NRC 659 Public Meeting Feedback for Saint Lucie Unit 1 Regulatory Conference 03/21/2017 ML20294A1332017-02-17017 February 2017 Video of January 9, 2014 Flooding at St. Lucie ML20294A0722016-12-29029 December 2016 Video of January 9, 2014 Flooding at St. Lucie ML20294A1512016-12-22022 December 2016 Video of January 9, 2014 Flooding at St. Lucie ML14081A0132014-03-22022 March 2014 LTR-14-0153-1-Ticket - Ace Hoffman, the Animated Software Co. Email St. Lucie Plant - Steam Generator Tube Leak ML14063A1482014-02-27027 February 2014 LTR-14-0118-Ticket - Representative Kathy Castor Ltr. Deterioration of Steam Generator Tubes at St. Lucie Nuclear Power Plant - Troubling Press Report ML13364A2832013-12-30030 December 2013 Announcement of 2014 Generic Fundamentals Examination Administration Dates-Letter Dated Dec 30, 2013 ML12056A0522012-03-12012 March 2012 Enclosure 6 - List of Power Reactor Licensees and Holders of Construction Permits in Active or Deferred Status ML12004A1092012-01-0202 January 2012 December 2011 Marine Turtle Captures ML11258A2652011-09-0404 September 2011 August 2011 Marine Turtle Captures L-2010-259, St. Lucie, Unit 1 - License Amendment Request for Extended Power Uprate, Attachment 5; Appendix B, Additional Codes and Methods2010-12-15015 December 2010 St. Lucie, Unit 1 - License Amendment Request for Extended Power Uprate, Attachment 5; Appendix B, Additional Codes and Methods ML1035604312010-12-15015 December 2010 St. Lucie, Unit 1 - License Amendment Request for Extended Power Uprate, Attachment 5; Appendix B, Additional Codes and Methods ML1019301952010-06-0909 June 2010 Onsite Ground/Surface Water Monitoring Questionnaire for St. Lucie ML1013201982010-05-11011 May 2010 Public Meeting - Attendees ML1019304602010-03-25025 March 2010 List of Historical Leaks and Spills at Us Commercial Nuclear Power Plants ML0933507512010-01-14014 January 2010 Temporary Instruction 2515/180, Managing Fatigue ML0806704192008-03-0707 March 2008 CDBI Findings ML0732400242007-10-25025 October 2007 Examples of Max Thermal Power License Conditions ML0709600032007-05-0303 May 2007 License Pages - Change to Renewed FOLs in Conjunction W/Order EA-06-037 and Revisions to Physical Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan ML0634705992006-12-14014 December 2006 Plant Service List ML0620602852006-08-0303 August 2006 Letter Summary of SG Inspection Conference Call ML0622205152006-07-28028 July 2006 Cover Sheet - Warning - Investigative Material - St. Lucie Termination & Violation ML0622205702006-07-28028 July 2006 Selected Pages from St. Lucie Unit 1 Updated Final Safety Analysis Report (Ufsar): Page 6.3-5 & Figure 6.2-28 Re Refueling Water Tank ML0622205302006-07-28028 July 2006 Cover Sheet - Warning - Investigative Material - St. Lucie Accurate Response ML0622205192005-04-28028 April 2005 Index of Concerns - RII-2005-A-0056 ML0622206112005-04-19019 April 2005 Allegation Review Board Briefing Sheet and Allegation Report L-2005-012, Enclosure 2, St. Lucie Unit 2, Responses to NRC Requests for Additional Information on WCAP-16208-P, Revision 0, NDE Inspection Length for CE Steam Generator Tubesheet Region Explosive Expansions.2005-02-10010 February 2005 Enclosure 2, St. Lucie Unit 2, Responses to NRC Requests for Additional Information on WCAP-16208-P, Revision 0, NDE Inspection Length for CE Steam Generator Tubesheet Region Explosive Expansions. ML0503203862005-01-31031 January 2005 OI Report 2-2004-030, Synopsis - St. Lucie ML0510302632005-01-14014 January 2005 Enclosure C&D, FPL Conference Call Summary on SL2-15 Refueling Outage (Tac No. MC5538) ML0404104922004-02-20020 February 2004 Order EA-03-009 Service List ML0505404642004-02-0909 February 2004 Dynamic Web Page Printout Dated 02/09/2004 Regarding Applied Violations for Nuclear Power Plants ML0328009612003-10-0202 October 2003 NPF-16 Appendix D ML0328009092003-10-0202 October 2003 NPF-16 Appendix C ML0403506912003-08-27027 August 2003 DRS Open Items Status ML0403502122003-08-13013 August 2003 DRS Open Items Status ML0403506872003-08-0505 August 2003 DRS Open Item Status ML0317404292003-06-30030 June 2003 FPL Handout ML0306603132003-03-0606 March 2003 Attachment 1, NFPA Formal Interpretation Request Form ML0306603152003-03-0606 March 2003 Attachment 2, NFPA Formal Interpretation Request Form ML0306603192003-03-0606 March 2003 Attachment 3, NFPA Formal Interpretation Request Form ML0306603432003-03-0606 March 2003 Attachment 5, NFPA ML0401201082002-03-18018 March 2002 Phase 1 Screening Worksheet for IE, Ms and B Cornerstone 2023-03-08
[Table view] |
Text
APPENDIX D ANTITRUST CORDTIioNs LICENSE NO. NPF-16 I. With regard to Clay County Electric Coperative, Inc. Florida Keys Electric Cooperative, Inc., Glades Electric Cooperative, Inc., Lee County Electric Cooperative, Inc., Okefenokee Rural Electric Membership Cooperative, Inc.,
Peace River Electric Cooperative, Inc., and Suwannee Valley Electric Cooperative, Inc. 1/ and the municipalities of New Smyrna Beach and Homestead:
(a) Florida Power & Light Company (Company) will offer each the opportunity to purchase, at the Company's costs, a reasonable ownership share (heareafter, Participant's Share") of the St. Lucie Plant Unit No. 2 (the facility).
The Company's costs" will include all costs associated with develop-ment, construction and operation of the facility, determined in accordance with the Federal Power Commission's Uniform System of Accounts.
'Purchase' means payment, within a reasonable time, of participant's share of the Company's costs incurred through date of acceptance of the offer, and, thereafter,, regular payments of the participant's share of all costs incurred during development, construction and operation of the facility.
(b) Participant will notify the Company of its acceptance to participate in St. Lucie Plant Unit No. 2 within a reasonable time after receipt of the offer.
(c) The Company may retain complete control and act for the other participants with respect to the design, engineering, construction, operation and maintenance of St. Lucie Plant Unit No. 2, and may make all -decisions relevant thereto, insofar as they deal with the relationship between the Company and the other participants, including, but not limited to, decisions regarding adherence to the Commission's health, safety and environmental regulations, changes in construction schedule, modification or cancellation of the project, and operation at such time and at such capacity levels as it deems proper, all without
-the consent of any .participant.
II. The Company shall facilitate the delivery of each participant's share of the output of the facility to that participant, on terms which are reasonable and will fully compensate it for the use of its facilities, I/Two or more of the referred-to cooperatives may determine to aggregate their entitlements from the St. Lucie Plant Unit No. 2 through a single representative.
In such event, the Company shall allocate the delivery of said entitlements as designated by the representative to one or more exisiting or muntually agreeable Florida Power & Light Company delivery points on the combined system provided that such delivery is technically feasible.
di to the extent that subject arrangements reasonably can be accommodated from a functional and technical standpoint.
III. The Company shall not refuse to operate in parallel to the extent that it is technically feasible to do so with the participants and shall provide emergency and maintenance power to participants as required when such power is or can be made available without jepardizing power supply to the Company's customers or its other power supply commitments. A separate rate schedule(s) shall be established for such emergency and maintenance power exchanges.
IV. At a time when the Company plans for the next nuclear generating unit to be constructed after St. Lucie Plant Unit No. 2 has reached the stage of serious planning, but before firm decisions have been made as to the size and desired completion date of the proposed nuclear unit, the Company will notify all non-affiliated utility systems with peak loads smaller than the Company's which serve either at wholesale or at retail adjacent to areas served by the Company that the Company plans to construct such nuclear facility.
V. It is recognized that the foregoing conditions are to be implemented in a manner consistent with the provisions of the Federal Power Act and all rates, charges or practices in connection therewith are to be subject to the approval of regulatory agencies having jurisdiction over them.