MONTHYEARML0501104532005-01-12012 January 2005 Upcoming Steam Generator Tube Inservice Inspection Project stage: Other ML0510302632005-01-14014 January 2005 Enclosure C&D, FPL Conference Call Summary on SL2-15 Refueling Outage (Tac No. MC5538) Project stage: Other ML0510301782005-01-17017 January 2005 Enclosure E, FPL Conference Call Summary on SL2-15 Refueling Outage (Tac No. MC5538) Project stage: Other ML0507301972005-04-0808 April 2005 Ltr., FPL Conference Call Summary on SL2-15 Refueling Outage (Tac No. MC5538) Project stage: Other 2005-01-14
[Table View] |
|
---|
Category:- No Document Type Applies
MONTHYEARML23067A0522023-03-0808 March 2023 SLRA - Scoping and Screening, Sections 2.3.3.2 and 2.3.3.4 ML22013A2932021-12-21021 December 2021 Trp 45 St. Lucie SLRA - Breakout Questions Masonry Walls ML21356A0112021-12-17017 December 2021 Trp 148.3 and 148.4 St Lucie SLRA Breakout Questions ML21351A2482021-12-17017 December 2021 Trp 26 St. Lucie SLRA - Fire Protection Breakout Questions ML22013A2772021-11-21021 November 2021 2.4 Structural Scoping and Screening Breakout Questions ML19203A0182019-07-22022 July 2019 Public Notice of Exigent License Amendment Request ML18127A9112018-05-0707 May 2018 Figure 10.4.9B-4, Fault Tree of Loop - Manual ML18127A9102018-05-0707 May 2018 Figure 10.4.9B-3, Fault Tree of Lfow - Manual ML17073A1252017-03-14014 March 2017 NRC 659 Public Meeting Feedback for Saint Lucie Unit 1 Regulatory Conference 03/21/2017 ML20294A1332017-02-17017 February 2017 Video of January 9, 2014 Flooding at St. Lucie ML20294A0722016-12-29029 December 2016 Video of January 9, 2014 Flooding at St. Lucie ML20294A1512016-12-22022 December 2016 Video of January 9, 2014 Flooding at St. Lucie ML14081A0132014-03-22022 March 2014 LTR-14-0153-1-Ticket - Ace Hoffman, the Animated Software Co. Email St. Lucie Plant - Steam Generator Tube Leak ML14063A1482014-02-27027 February 2014 LTR-14-0118-Ticket - Representative Kathy Castor Ltr. Deterioration of Steam Generator Tubes at St. Lucie Nuclear Power Plant - Troubling Press Report ML13364A2832013-12-30030 December 2013 Announcement of 2014 Generic Fundamentals Examination Administration Dates-Letter Dated Dec 30, 2013 ML12056A0522012-03-12012 March 2012 Enclosure 6 - List of Power Reactor Licensees and Holders of Construction Permits in Active or Deferred Status ML12004A1092012-01-0202 January 2012 December 2011 Marine Turtle Captures ML11258A2652011-09-0404 September 2011 August 2011 Marine Turtle Captures L-2010-259, St. Lucie, Unit 1 - License Amendment Request for Extended Power Uprate, Attachment 5; Appendix B, Additional Codes and Methods2010-12-15015 December 2010 St. Lucie, Unit 1 - License Amendment Request for Extended Power Uprate, Attachment 5; Appendix B, Additional Codes and Methods ML1035604312010-12-15015 December 2010 St. Lucie, Unit 1 - License Amendment Request for Extended Power Uprate, Attachment 5; Appendix B, Additional Codes and Methods ML1019301952010-06-0909 June 2010 Onsite Ground/Surface Water Monitoring Questionnaire for St. Lucie L-2010-123, Substantial NPDES Permit Revision St. Lucie Plant Response to FDEP RFI 12010-06-0808 June 2010 Substantial NPDES Permit Revision St. Lucie Plant Response to FDEP RFI #1 ML1013201982010-05-11011 May 2010 Public Meeting - Attendees ML1019304602010-03-25025 March 2010 List of Historical Leaks and Spills at Us Commercial Nuclear Power Plants ML0933507512010-01-14014 January 2010 Temporary Instruction 2515/180, Managing Fatigue ML0806704192008-03-0707 March 2008 CDBI Findings ML0732400242007-10-25025 October 2007 Examples of Max Thermal Power License Conditions ML0709600032007-05-0303 May 2007 License Pages - Change to Renewed FOLs in Conjunction W/Order EA-06-037 and Revisions to Physical Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan ML0634705992006-12-14014 December 2006 Plant Service List ML0620602852006-08-0303 August 2006 Letter Summary of SG Inspection Conference Call ML0622205302006-07-28028 July 2006 Cover Sheet - Warning - Investigative Material - St. Lucie Accurate Response ML0622205152006-07-28028 July 2006 Cover Sheet - Warning - Investigative Material - St. Lucie Termination & Violation ML0622205702006-07-28028 July 2006 Selected Pages from St. Lucie Unit 1 Updated Final Safety Analysis Report (Ufsar): Page 6.3-5 & Figure 6.2-28 Re Refueling Water Tank ML0622205192005-04-28028 April 2005 Index of Concerns - RII-2005-A-0056 ML0622206112005-04-19019 April 2005 Allegation Review Board Briefing Sheet and Allegation Report L-2005-012, Enclosure 2, St. Lucie Unit 2, Responses to NRC Requests for Additional Information on WCAP-16208-P, Revision 0, NDE Inspection Length for CE Steam Generator Tubesheet Region Explosive Expansions.2005-02-10010 February 2005 Enclosure 2, St. Lucie Unit 2, Responses to NRC Requests for Additional Information on WCAP-16208-P, Revision 0, NDE Inspection Length for CE Steam Generator Tubesheet Region Explosive Expansions. ML0503203862005-01-31031 January 2005 OI Report 2-2004-030, Synopsis - St. Lucie ML0510302632005-01-14014 January 2005 Enclosure C&D, FPL Conference Call Summary on SL2-15 Refueling Outage (Tac No. MC5538) ML0404104922004-02-20020 February 2004 Order EA-03-009 Service List ML0505404642004-02-0909 February 2004 Dynamic Web Page Printout Dated 02/09/2004 Regarding Applied Violations for Nuclear Power Plants ML0328009092003-10-0202 October 2003 NPF-16 Appendix C ML0328009612003-10-0202 October 2003 NPF-16 Appendix D ML0403506912003-08-27027 August 2003 DRS Open Items Status ML0403502122003-08-13013 August 2003 DRS Open Items Status ML0403506872003-08-0505 August 2003 DRS Open Item Status ML0317404292003-06-30030 June 2003 FPL Handout ML0306603132003-03-0606 March 2003 Attachment 1, NFPA Formal Interpretation Request Form ML0306603152003-03-0606 March 2003 Attachment 2, NFPA Formal Interpretation Request Form ML0306603192003-03-0606 March 2003 Attachment 3, NFPA Formal Interpretation Request Form ML0306603432003-03-0606 March 2003 Attachment 5, NFPA 2023-03-08
[Table view] |
Text
ST. LUCIE UNIT 2 - EOC14 STEAM GENERATOR ECT STATUS As of 01/14/05 @ 1230 Hrs Exams Exams Exams %
SIG Exam Type Programmed Acquired Evaluated Complete A Bobbin Exams 7970 6322 5592 70.16%
A RPC H/L Expansion Transitions 7720 3858 751 9.73%
A RPC C/IL Expansion Transitions 236 0 0 0.00%
A RPC Row 1 & 2 U-Bends 41 0 0 0.00%
A RPC HILCIL and U-Bend Dings 484 41 24 4.96%
A RPC Wear U-Bend Region & TSP's 229 3 0 0.00%
A RPC Non-Expanded Tubes 21 1 0 0.00%
B Bobbin Exams 7756 6142 5546 71.51%
B RPC H/L Expansion Transitions 7539 4203 1702 22.58%
B RPC C/IL Expansion Transitions 234 0 0 0.00%
B RPC Row 1 & 2 U-Bends 39 0 0 0.00%
B RPC H/IL,C/L and U-Bend Dings 395 23 0 0.00%
B RPC Wear U-Bend Region &TSP's 158 6 0 0.00%
B RPC Non-Expanded Tubes 1 0 0 0.00%
NOTE: Exams evaluated are counted when through the final analysis process.
ADDITIONAL INFORMATION In Situ SIG A SIG B Total Potential In Situ Locations (Under Review) 0 0 0 Locations Requiring In Situ Testing 0 0 0 Retests & PID Examinations SIG A SIG B Total Bobbin Coil Retests Outstanding (No. of Tubes) 70 43 113 RPC Retests Outstanding (No of Tubes) 9 4 13 PID Outstanding - Positive Id of Repairable Tube 70 1 71
+Point Diagnostic Exams for Bobbin Indications (Potential Pluggablesi Exams Exams Exams O Programmed Acquired Evaluated Complete A RPC Bobbin I-Code/OXP/MBMJWear 412 137 21 5.10%
A RPC Loose Part and Bounding 0 0 0 0.00%
A RPC Newly Report DNG / New DNT 40 1 1 2.50%
B RPC Bobbin I-CodeIOXP/MBM/IWear 703 136 0 0.00%
B RPC Loose Part and Bounding 0 0 0 0.00%
B RPC Newly Report DNG / New DNT 74 2 0 0.00%
CONFIRMED PLUGGABLE TUBES FOR EOCI4 Damage Mechanism SIGA SIG B Total ID Circumferential 0 0 0 ID Axial 0 0 0 OD Circumferential 0 1 1 OD Axial - H/L Expansion Transition 0 0 0 OD Axial - Support Plates 0 0 0 OD Axial - Freespan 0 0 0 OD Volumetric 0 0 0 Mechanical Wear 1 0 1 Preventative Tube Plug 0 0 . 0 Total New Tubes to Plug 1 1 2 Prior Plugged Tubes 671 872 1543 Total Committed Plugged Tubes 672 873 1545 ANALYSIS NOTES A H/L 1 Ran SI Switched to H/L TSH @ Midnight, A H/L 2 Running HL TSH, A C/IL Running Bobbin B H/L 1 Ran SI Switched to H/L TSH @ Midnight, B H/L 2 Running HL TSH, B C/IL Running Bobbin Problems encountered during the past 12 hrs.:
See attached FANP ECT Task Coordinator Shift Turnover Report Attachment C
- l- l o ul51 X. - C-Jk c1b STEAM GEIJERATOR ECT STATUS As or 0l'1i47l; @ 0300 Hrs E.m xni xm Exams Ex-ams1 Exnms I SIG Exam Type Programmed hcquiired Evaluated Complete A Bobbin Exams 7970 7969 7qrq 00 QC101 A RPC HIL Expansion Transitions 7720 7720 7720 100.00%
A RPC CIL Expansion Transitions 23E 135 0 0.00%
A RPC Row 1 8 2 U-Bends 41 40 39 95.12%
A RPC HlL,CiL and U-Bend Dings 484 117 24.17%
A RPC Wear U-Bend Region & TSP's 229 37 0.44%
1 A RPC Non-Expanded Tubes 21 20 20 95.24%
B Bobbin Exams 7756 7756 7755 99.99%
B RPC H/L Expansion Transitions 7539 7536 7539 99.99%
B RPC CIL Expansion Transitions 234 234 232 99.15%
a RPC Row 1 & 2 U-Bends 39 13 13 33.33%
B RPC HIL,CIL and U-Bend Dings 2'5 152 106 26.84%
B RPC Wear U-Bend Region & TSP's 158 ts 3 1.90%
B RPC Plon-Expanded Tubes 1 1 1 100.00%
NOTE: Exams evaluated are counted wvhen throuoh th fin-A analIuck nrreecc In Situ SIG A SIC B Total Potential In Situ Locations (Under Review) 15 6 21 Locations Requiring In Situ Testing 0 0 0 Rctests R PID Examinalinns Sir. A SIG B Total Bobbin Coil Retests Outstanding (No. of T'ubes) 0 1 1 RPC Retests Outstanding (No of Tubes) 44 46 90 PID Outstanding - Positlve Id of Repairable Tube I 1 2
+Point Diagnostic Evims for Bobbin Indications (Potential Pluggiblhs, Exams Exams Exams %
Programrrmed Acquired Evaluated Complete A RPC Bobbin l-Code/OXPIIMBMUWear 1516 1352 875 57.72%
A RPC Loose Part and Bounding 0 0 0 0.00%
A RPCNewlyyReportDNGlNewDNT 66 16 11 16.67%
B RPC Bobbin l-CodelOXPIMBMI~ear 1744 1324 902 51.72%
B RPC Loose Part and Bounding 0 0 0 0.00%
B RPC Nowly Report ONG I Nw DOUT 108 37 26 24.07%
COIIFIRMErn PLUGGA11LE TtinES FOR EOC14 namage Mochanism SIG A SIG 1 Total ID Circumferential 0 1 1 ID Axial 1 1 2 OD Circumferential 6 9 15 OD Axial - HIL Expansion Transition 14 3 17 OD Axial - Support Plates 483 394 877 OD Axial - Freespan 0 0 0 OD Volumetric 0 0 0 Mechanical Wear 1 0 t Preventative Tube Plug 0 0 0 Total llewTubes to Plug 504 4n7 911 Prior Plugged Tubes 671 872 1543 Total Committed Pi.qgw)d Tuns_ 1175 1279 2454
.- ANALYSIS NOTES A HIL 1 and HIL 2 running H/L Special Interest, A CIL running Special Interest B HIL1 and HIL 2 runnin2 HIL Special Interest, B CIL running Dcnts/Dings Special Interest Problems encountnrnd during the past 12 hrs.:
See attachedFANP SG Outage Manager ShiRf Tumover Report
,. A t!
A L nltt D