ML051030263

From kanterella
Jump to navigation Jump to search

Enclosure C&D, FPL Conference Call Summary on SL2-15 Refueling Outage (Tac No. MC5538)
ML051030263
Person / Time
Site: Saint Lucie NextEra Energy icon.png
Issue date: 01/14/2005
From:
Florida Power & Light Co
To:
NRC/NRR/DLPM
Moroney B, NRR/DLPM, 415-3974
Shared Package
ML051030078 List:
References
TAC MC5538
Download: ML051030263 (2)


Text

ST. LUCIE UNIT 2 - EOC14 STEAM GENERATOR ECT STATUS As of 01/14/05 @ 1230 Hrs Exams Exams Exams  %

SIG Exam Type Programmed Acquired Evaluated Complete A Bobbin Exams 7970 6322 5592 70.16%

A RPC H/L Expansion Transitions 7720 3858 751 9.73%

A RPC C/IL Expansion Transitions 236 0 0 0.00%

A RPC Row 1 & 2 U-Bends 41 0 0 0.00%

A RPC HILCIL and U-Bend Dings 484 41 24 4.96%

A RPC Wear U-Bend Region & TSP's 229 3 0 0.00%

A RPC Non-Expanded Tubes 21 1 0 0.00%

B Bobbin Exams 7756 6142 5546 71.51%

B RPC H/L Expansion Transitions 7539 4203 1702 22.58%

B RPC C/IL Expansion Transitions 234 0 0 0.00%

B RPC Row 1 & 2 U-Bends 39 0 0 0.00%

B RPC H/IL,C/L and U-Bend Dings 395 23 0 0.00%

B RPC Wear U-Bend Region &TSP's 158 6 0 0.00%

B RPC Non-Expanded Tubes 1 0 0 0.00%

NOTE: Exams evaluated are counted when through the final analysis process.

ADDITIONAL INFORMATION In Situ SIG A SIG B Total Potential In Situ Locations (Under Review) 0 0 0 Locations Requiring In Situ Testing 0 0 0 Retests & PID Examinations SIG A SIG B Total Bobbin Coil Retests Outstanding (No. of Tubes) 70 43 113 RPC Retests Outstanding (No of Tubes) 9 4 13 PID Outstanding - Positive Id of Repairable Tube 70 1 71

+Point Diagnostic Exams for Bobbin Indications (Potential Pluggablesi Exams Exams Exams O Programmed Acquired Evaluated Complete A RPC Bobbin I-Code/OXP/MBMJWear 412 137 21 5.10%

A RPC Loose Part and Bounding 0 0 0 0.00%

A RPC Newly Report DNG / New DNT 40 1 1 2.50%

B RPC Bobbin I-CodeIOXP/MBM/IWear 703 136 0 0.00%

B RPC Loose Part and Bounding 0 0 0 0.00%

B RPC Newly Report DNG / New DNT 74 2 0 0.00%

CONFIRMED PLUGGABLE TUBES FOR EOCI4 Damage Mechanism SIGA SIG B Total ID Circumferential 0 0 0 ID Axial 0 0 0 OD Circumferential 0 1 1 OD Axial - H/L Expansion Transition 0 0 0 OD Axial - Support Plates 0 0 0 OD Axial - Freespan 0 0 0 OD Volumetric 0 0 0 Mechanical Wear 1 0 1 Preventative Tube Plug 0 0 . 0 Total New Tubes to Plug 1 1 2 Prior Plugged Tubes 671 872 1543 Total Committed Plugged Tubes 672 873 1545 ANALYSIS NOTES A H/L 1 Ran SI Switched to H/L TSH @ Midnight, A H/L 2 Running HL TSH, A C/IL Running Bobbin B H/L 1 Ran SI Switched to H/L TSH @ Midnight, B H/L 2 Running HL TSH, B C/IL Running Bobbin Problems encountered during the past 12 hrs.:

See attached FANP ECT Task Coordinator Shift Turnover Report Attachment C

- l- l o ul51 X. - C-Jk c1b STEAM GEIJERATOR ECT STATUS As or 0l'1i47l; @ 0300 Hrs E.m xni xm Exams Ex-ams1 Exnms I SIG Exam Type Programmed hcquiired Evaluated Complete A Bobbin Exams 7970 7969 7qrq 00 QC101 A RPC HIL Expansion Transitions 7720 7720 7720 100.00%

A RPC CIL Expansion Transitions 23E 135 0 0.00%

A RPC Row 1 8 2 U-Bends 41 40 39 95.12%

A RPC HlL,CiL and U-Bend Dings 484 117 24.17%

A RPC Wear U-Bend Region & TSP's 229 37 0.44%

1 A RPC Non-Expanded Tubes 21 20 20 95.24%

B Bobbin Exams 7756 7756 7755 99.99%

B RPC H/L Expansion Transitions 7539 7536 7539 99.99%

B RPC CIL Expansion Transitions 234 234 232 99.15%

a RPC Row 1 & 2 U-Bends 39 13 13 33.33%

B RPC HIL,CIL and U-Bend Dings 2'5 152 106 26.84%

B RPC Wear U-Bend Region & TSP's 158 ts 3 1.90%

B RPC Plon-Expanded Tubes 1 1 1 100.00%

NOTE: Exams evaluated are counted wvhen throuoh th fin-A analIuck nrreecc In Situ SIG A SIC B Total Potential In Situ Locations (Under Review) 15 6 21 Locations Requiring In Situ Testing 0 0 0 Rctests R PID Examinalinns Sir. A SIG B Total Bobbin Coil Retests Outstanding (No. of T'ubes) 0 1 1 RPC Retests Outstanding (No of Tubes) 44 46 90 PID Outstanding - Positlve Id of Repairable Tube I 1 2

+Point Diagnostic Evims for Bobbin Indications (Potential Pluggiblhs, Exams Exams Exams  %

Programrrmed Acquired Evaluated Complete A RPC Bobbin l-Code/OXPIIMBMUWear 1516 1352 875 57.72%

A RPC Loose Part and Bounding 0 0 0 0.00%

A RPCNewlyyReportDNGlNewDNT 66 16 11 16.67%

B RPC Bobbin l-CodelOXPIMBMI~ear 1744 1324 902 51.72%

B RPC Loose Part and Bounding 0 0 0 0.00%

B RPC Nowly Report ONG I Nw DOUT 108 37 26 24.07%

COIIFIRMErn PLUGGA11LE TtinES FOR EOC14 namage Mochanism SIG A SIG 1 Total ID Circumferential 0 1 1 ID Axial 1 1 2 OD Circumferential 6 9 15 OD Axial - HIL Expansion Transition 14 3 17 OD Axial - Support Plates 483 394 877 OD Axial - Freespan 0 0 0 OD Volumetric 0 0 0 Mechanical Wear 1 0 t Preventative Tube Plug 0 0 0 Total llewTubes to Plug 504 4n7 911 Prior Plugged Tubes 671 872 1543 Total Committed Pi.qgw)d Tuns_ 1175 1279 2454

.- ANALYSIS NOTES A HIL 1 and HIL 2 running H/L Special Interest, A CIL running Special Interest B HIL1 and HIL 2 runnin2 HIL Special Interest, B CIL running Dcnts/Dings Special Interest Problems encountnrnd during the past 12 hrs.:

See attachedFANP SG Outage Manager ShiRf Tumover Report

,. A t!

A L nltt D