ML051030263

From kanterella
Jump to navigation Jump to search

Enclosure C&D, FPL Conference Call Summary on SL2-15 Refueling Outage (Tac No. MC5538)
ML051030263
Person / Time
Site: Saint Lucie NextEra Energy icon.png
Issue date: 01/14/2005
From:
Florida Power & Light Co
To:
NRC/NRR/DLPM
Moroney B, NRR/DLPM, 415-3974
Shared Package
ML051030078 List:
References
TAC MC5538
Download: ML051030263 (2)


Text

ST. LUCIE UNIT 2 - EOC14 STEAM GENERATOR ECT STATUS As of 01/14/05 1230 Hrs SIG A

A A

A A

A A

Exam Type Bobbin Exams RPC H/L Expansion Transitions RPC C/IL Expansion Transitions RPC Row 1 & 2 U-Bends RPC HILCIL and U-Bend Dings RPC Wear U-Bend Region & TSP's RPC Non-Expanded Tubes Exams Programmed 7970 7720 236 41 484 229 21 Exams Acquired 6322 3858 0

0 41 3

1 Exams Evaluated Complete 5592 70.16%

751 9.73%

0 0.00%

0 0.00%

24 4.96%

0 0.00%

0 0.00%

B B

B B

B B

B Bobbin Exams RPC H/L Expansion Transitions RPC C/IL Expansion Transitions RPC Row 1 & 2 U-Bends RPC H/IL,C/L and U-Bend Dings RPC Wear U-Bend Region & TSP's RPC Non-Expanded Tubes 7756 7539 234 39 395 158 1

6142 4203 0

0 23 6

0 5546 1702 0

0 0

0 0

71.51%

22.58%

0.00%

0.00%

0.00%

0.00%

0.00%

NOTE: Exams evaluated are counted when through the final analysis process.

ADDITIONAL INFORMATION In Situ SIG A SIG B Total Potential In Situ Locations (Under Review) 0 0

0 Locations Requiring In Situ Testing 0

0 0

Retests & PID Examinations SIG A SIG B Total Bobbin Coil Retests Outstanding (No. of Tubes) 70 43 113 RPC Retests Outstanding (No of Tubes) 9 4

13 PID Outstanding - Positive Id of Repairable Tube 70 1

71

+Point Diagnostic Exams for Bobbin Indications (Potential Pluggablesi Exams Exams Exams O

Programmed Acquired Evaluated Complete A

RPC Bobbin I-Code/OXP/MBMJWear 412 137 21 5.10%

A RPC Loose Part and Bounding 0

0 0

0.00%

A RPC Newly Report DNG / New DNT 40 1

1 2.50%

B RPC Bobbin I-CodeIOXP/MBM/IWear 703 136 0

0.00%

B RPC Loose Part and Bounding 0

0 0

0.00%

B RPC Newly Report DNG / New DNT 74 2

0 0.00%

CONFIRMED PLUGGABLE TUBES FOR EOCI4 Damage Mechanism SIGA SIG B Total ID Circumferential 0

0 0

ID Axial 0

0 0

OD Circumferential 0

1 1

OD Axial - H/L Expansion Transition 0

0 0

OD Axial - Support Plates 0

0 0

OD Axial - Freespan 0

0 0

OD Volumetric 0

0 0

Mechanical Wear 1

0 1

Preventative Tube Plug 0

0 0

Total New Tubes to Plug 1

1 2

Prior Plugged Tubes 671 872 1543 Total Committed Plugged Tubes 672 873 1545 ANALYSIS NOTES A H/L 1 Ran SI Switched to H/L TSH @ Midnight, A H/L 2 Running HL TSH, A C/IL Running Bobbin B H/L 1 Ran SI Switched to H/L TSH @ Midnight, B H/L 2 Running HL TSH, B C/IL Running Bobbin Problems encountered during the past 12 hrs.:

See attached FANP ECT Task Coordinator Shift Turnover Report Attachment C

l -

l o ul51 X. -

C-Jk c1b STEAM GEIJERATOR ECT STATUS As or 0l'1i47l; 0300 Hrs E.m xni xm I

SIG A

A A

A A

A A

B B

B a

B B

B Exam Type Bobbin Exams RPC HIL Expansion Transitions RPC CIL Expansion Transitions RPC Row 1 8 2 U-Bends RPC HlL,CiL and U-Bend Dings RPC Wear U-Bend Region & TSP's RPC Non-Expanded Tubes Exams Programmed 7970 7720 23E 41 484 229 21 Ex-ams1 hcquiired 7969 7720 135 40 37 20 7756 7536 234 13 152 ts 1

Exnms Evaluated 7qrq Complete 00 QC101 7720 0

39 117 1

20 100.00%

0.00%

95.12%

24.17%

0.44%

95.24%

Bobbin Exams RPC H/L Expansion Transitions RPC CIL Expansion Transitions RPC Row 1 & 2 U-Bends RPC HIL,CIL and U-Bend Dings RPC Wear U-Bend Region & TSP's RPC Plon-Expanded Tubes 7756 7539 234 39 2'5 158 1

7755 7539 232 13 106 3

1 99.99%

99.99%

99.15%

33.33%

26.84%

1.90%

100.00%

NOTE: Exams evaluated are counted wvhen throuoh th fin-A analIuck nrreecc In Situ SIG A SIC B Total Potential In Situ Locations (Under Review) 15 6

21 Locations Requiring In Situ Testing 0

0 0

Rctests R PID Examinalinns Sir. A SIG B Total Bobbin Coil Retests Outstanding (No. of T'ubes) 0 1

1 RPC Retests Outstanding (No of Tubes) 44 46 90 PID Outstanding - Positlve Id of Repairable Tube I

1 2

+Point Diagnostic Evims for Bobbin Indications (Potential Pluggiblhs, Exams Exams Exams Programrrmed Acquired Evaluated Complete A

RPC Bobbin l-Code/OXPIIMBMUWear 1516 1352 875 57.72%

A RPC Loose Part and Bounding 0

0 0

0.00%

A RPCNewlyyReportDNGlNewDNT 66 16 11 16.67%

B RPC Bobbin l-CodelOXPIMBMI~ear 1744 1324 902 51.72%

B RPC Loose Part and Bounding 0

0 0

0.00%

B RPC Nowly Report ONG I Nw DOUT 108 37 26 24.07%

COIIFIRMErn PLUGGA11LE TtinES FOR EOC14 namage Mochanism SIG A SIG 1 Total ID Circumferential 0

1 1

ID Axial 1

1 2

OD Circumferential 6

9 15 OD Axial - HIL Expansion Transition 14 3

17 OD Axial - Support Plates 483 394 877 OD Axial - Freespan 0

0 0

OD Volumetric 0

0 0

Mechanical Wear 1

0 t

Preventative Tube Plug 0

0 0

Total llewTubes to Plug 504 4n7 911 Prior Plugged Tubes 671 872 1543 Total Committed Pi.qgw)d Tuns_

1175 1279 2454 ANALYSIS NOTES A HIL 1 and HIL 2 running H/L Special Interest, A CIL running Special Interest B HIL 1 and HIL 2 runnin2 HIL Special Interest, B CIL running Dcnts/Dings Special Interest Problems encountnrnd during the past 12 hrs.:

See attached FANP SG Outage Manager ShiRf Tumover Report A t !

A L n tlt D

._.