ML17006A012
From kanterella
Revision as of 12:30, 25 February 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
ML17006A012 | |
Person / Time | |
---|---|
Site: | Calvert Cliffs |
Issue date: | 12/22/2016 |
Revision: | 0 |
From: | Rich Smith ITT Enidine |
To: | Document Control Desk, Office of Nuclear Reactor Regulation |
References | |
52458 | |
Download: ML17006A012 (5) | |
Similar Documents at Calvert Cliffs | |
---|---|
Category:Deficiency Report (per 10CFR50.55e and Part 21)
MONTHYEARML24255A8642024-09-0606 September 2024
[Table view]Rscc Wire & Cable LLC Dba Marmon Industrial Energy & Infrastructure - Part 21 Retraction of Final Notification ML23117A0432023-04-20020 April 2023 Framatome, Inc., Part 21 Notification of Existence of a Defect ML23100A1072023-04-10010 April 2023 Framatome Part 21 Report Re Erroneous Change of State for Circuit Breaker ML23038A0192023-02-0606 February 2023 Curtiss-Wright Part 21 Notification for Qualtech Np Supplied Eaton TMR5 Timing Relays ML19253A0532019-08-29029 August 2019 Azz Nuclear - Report of Potential 1O CFR Part 21, Eaton Size 1 and 2 A200 Series Starters/Contactors ML19120A1062019-04-17017 April 2019 Interim Report of Potential 10 CFR Part 21, Eaton Size 1 and 2 A200 Series Starters/Contactors ML18302A2282018-10-19019 October 2018 Itt Enidine - USNRC 10CFR Part 21 Notification ML18243A5112018-08-28028 August 2018 Curtiss-Wright Nuclear Division - Senasys Selector Switch P/N 910CMC-5240X, Part 21 Notification ML17075A2782017-02-28028 February 2017 Part 21 - Potential Transducer Component Defect ML17006A0122016-12-22022 December 2016 Part 21 - Potential Transducer Component Defect ML16294A2642016-10-18018 October 2016 Part 21 Report - Defective Current to Pressure Transducers ML16278A4712016-09-22022 September 2016 Notification of 10 CFR Part 21 Condition, Masterpact Breaker Fail to Close ML16281A2702016-09-22022 September 2016 Part 21 - Initial Notification of Masterpact Breaker Fail to Close ML16139A8332016-05-13013 May 2016 Part 21 - Initial Notification of Masterpact Breaker Fail to Close ML16139A8322016-05-13013 May 2016 Part 21 - Initial Notification of Masterpact Breaker Fail to Close ML15049A4582015-02-0606 February 2015 Thermo Gamma-Metrics, LLC - Part 21 Report Regarding Shutdown Margin Monitor Environmental Qualification Noncompliance ML14265A0492014-09-12012 September 2014 Amendment to Part 21 Report from Abb, Inc Re Deviation of K-Line Circuit Secondary Close Latch (Event #50371) ML14237A1212014-08-15015 August 2014 Notification of Potential Part 21 Re Notice of Deviation Regarding K-Line Circuit Breaker Secondary Close Latch ML14113A3982014-04-17017 April 2014 Part 21 - Bearing Defect ML14079A3532014-03-17017 March 2014 Notification of Part 21 Re Bearing Defect ML13165A3422013-06-12012 June 2013 60-Day Interim Report Involving an Evaluation of a Design Change to Magne-Blast Circuit Breakers ML12352A1232012-12-13013 December 2012 60-Day Interim Report Involving an Evaluation of a Design Change to Magne-Blast Circuit Breakers ML12348A1362012-12-13013 December 2012 Part 21 60-Day Interim Report Notification: Adequacy of Design Change in Am Magne-Blast Circuit Breakers ML12283A2462012-09-28028 September 2012 Part 21 - Fairbanks Morse Opposed Piston EDG Oil Pump Leak ML12094A3712012-04-0202 April 2012 Part 21 Report - Rosemount Pressure Transmitters with Nonzero Based Calibrations ML12066A1182012-03-0202 March 2012 Part 21 Report - Rosemount Pressure Transmitters with Nonzero Based Calibrations ML12097A3162012-03-0202 March 2012 Part 21 Report - Rosemont Pressure Tranmitters Out of Tolerance Condition ML12058A1412012-02-23023 February 2012 Part 21 Report - Rosemount Nuclear Instruments, Inc., Pressure Transmitter with Nonzero Based Calibrations ML11251A1982011-09-0606 September 2011 Notification Under 10 CFR Part 21 on Certain Rosemount Model 1153 Series B, 1164 and 1154 Series H Pressure Transmitters, May Not Perform Their Intended Safety Function ML0932200662009-11-16016 November 2009 Part 21 Notification - Potential Failure in Emergency Diesel Generator Bearings ML0907611882009-03-11011 March 2009 Part 21 Notification - Defective Hk and K-Line Circuit Breaker Tension Springs ML0831900172008-11-12012 November 2008 Notification of Potential Part 21 on All Dimensionally Verified Commercial Grade Items Processed Per Fisher Manufacture Procedure Fmp 2K28 ML0823901062008-08-25025 August 2008 Notification of Potential Part 21 on Failure of F and G Switches ML0734402112007-12-0707 December 2007 Deficiency Report Part 21 Potential Insufficient Thread Engagement for Certain Pressure Transmitters ML0727504702007-09-21021 September 2007 MPR Associates, Inc. - Report of Defect in Accordance with 10 CFR 21 ML0713703092007-03-0707 March 2007 Velan, Inc., Piston Check Cv Information ML0627702242006-09-27027 September 2006 Part 21 Report from Tyco Valves & Controls LP, Improper Valve Springs in Pressure Relief Valves ML0626204942006-09-15015 September 2006 Part 21 Report by Tyco Valves and Controls, LP Re Improper Valve Springs in Pressure Relief Valves. Corrective Actions Taken by Tyco Listed ML0336503122003-12-26026 December 2003 Part 21 Report Regarding Failures of Abb Circuit Breakers Shipped to the Calvert Cliffs Plant ML0308404132003-03-14014 March 2003 Transmittal of 10 CFR Part 21 Report Regarding Failures of Abb Circuit Breakers 2024-09-06 |