ML20210H935

From kanterella
Revision as of 02:32, 4 December 2021 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Lists Change in Telephone Number for H Bernard,Facility Project Manager,Due to NRR Reorganization.D Tondi New Nonpower Reactors & Safeguards Licensing Section Leader. Correspondence Should Be Sent to Listed Address
ML20210H935
Person / Time
Site: Texas A&M University
Issue date: 03/27/1986
From: Berkow H
Office of Nuclear Reactor Regulation
To:
TEXAS A&M UNIV., COLLEGE STATION, TX
References
NUDOCS 8604030262
Download: ML20210H935 (3)


Text

o.

  • POR Docket No. 50-59 President Texas A&M University Coke Building Second Floor -

College Station, Texas 77843-1246

Dear. Sir:

SUBJECT:

RE0RGANIZATION OF THE JFFICE OF NUCLEAR REACTOR REGULATION As~a result of the recent reorganization of the Office of Nuclear Reactor Regulation, the telephone number of our Project Manager for your facilities, Harold Bernard, has been changed. Mr. Bernard can now be reachea at (301) 492-8529.

Our new Sectien Leader for the Non-Power Reactors and Safeguards Licensing Section is Dominic Tondi. He can be reached at (301) 492-8251. If neither Mr. Bernard or Itr. Tondi can be reached, I can be contacted at (301) 492-8795.

All correspondence should still be addressed as follows:

U.S. Nuclear Regulatory Commission Washington, D.C. '20555 Attn: Document Control Desk Sincerely, 9sAsinal Sisuaq#1A Herbert N. Berkow, Director Standardization and Special Projects Directorate Division of PWR Licensing-B cc: See next page

, DISTRIBUTION:

1 Central File SSPD' Reading' PNoonan HBernard DTondi HBerkow k,B:SSPD DPWRI~B:SSPD DPWRL-B:SSPD D pSSPD

Mn:ac' HBer DTondiST He ow

/ 0 p /86 03h 86 03g/86 03/J-/86 9604030262 860327 PDR ADOCK 05000059 P PDR L.

f ,

UNITED STATES g g NUCLEAR REGULATORY COMMISSION E WASHINGTON, D. C. 20555 5

\,*****,/ NAR 271986 Docket No. 50-59 President Texas A&M University Coke Building Second Floor College Station, Texas 77843-1246

Dear Sir:

SUBJECT:

RE0RGANIZATION OF THE OFFICE OF NUCLEAR REACTOR REGULATION As a result of the recent reorganization of the Office of Nuclear Reactor Regulation, the telephone number of our Project Manager for your ' facility, Harold Bernard, has been changed. Mr. Bernard can now be reached at (301) 492-8529.

Our new Section Leader for the Non-Power Reactors and Safeguards Licensing Section is Dominic Tondi. He can be reached at (301) 492-8251. If neither Mr. Bernard or Mr. Tondi can be reached, ! can be contacted at (301) 492-8795.

All correspondence should still be addressed as follows:

U.S. Nuclear Regulatory Commission Washington, D.C. 20555 Attn: Document Control Desk Sincerely, erbert N. Berkow, Director

' Standardization and Special Projects Directorate l Division of PWR Licensing-B cc: See next page l

l I

Texas A&M University Docket Nos. 50-59 cc: Mayor of the City of College Station College Station, Texas 77843-3575 Governor's Budget and Planning Office Post Offfice Box 13561 Austin, Texas 78711 Bureau of Radiation Control State of Texas 1100 West 49th Street Austin, Texas 78756 Department Head Nuclear Engineering 129 Zachry Engineering Center Texas A&M University College Station, Texas 77843-3133

.