ML20148B888

From kanterella
Jump to navigation Jump to search
Notifies That Kl Peddicord Replaced W/Jw Poston as Dept Head of Nuclear Engineering
ML20148B888
Person / Time
Site: Texas A&M University
Issue date: 02/24/1988
From: Breiner E
TEXAS A&M UNIV., COLLEGE STATION, TX
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
NUDOCS 8803220179
Download: ML20148B888 (1)


Text

__ __ ___ . _ _ _ __ _ _ . - _ _ - _ _ _ - - _ _ _ _ _ _ _ _ _ _ _ _ . _ _ _ - _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ __ _

  • TEX AS A&M UNIVERSITY COLLEGE OF ENGINEERING Coll [GE STATION TEXAS 77&41-31.13 OEpantsoEsr or NuctEse eNo:uEERina --

(4091845 4 t61 i h (l '

24 February 1988  ; g i - i; M2 b i988 Regional Adm.ini.strator

- U.S. Nuclear Regulatory Commission . l-j 61 Ryan Plaza Drive, Suite 1000 Arlington, TX 76011

Reference:

License R 23, Docket 50 59

Dear Sir:

This letter is to notify you that Dr. Kenneth L. Peddicord is no longer the Department Head of

- Nuclear Engineering. Dr. John W. Poston is currently serving as the Interin Department Head of Nuclear Engineering. Dr. Poston has been briefed by Dr. Gerald Schlapper, the Designated Alternate Department Head, on the responsibilities involved in his current position.

If you have any questions concernirig this change in administrative control of the AGN 201M,

- please call me or Dr. Gerald Schiapper at (409)845-4161. ,

  • - Sincerely, y

Evelyn Breiner Reactor Supervisor cc. Harold Char.ey, NRC J. W. Poston, Texas A&M G. A. Schiapper, Texas A&M i

I l

l-0 059 CW D

[2h79 O PDR COLLEGE OF ENGINEERINO : TEACHING < RESEARCH EX TENSIO 4

- i- . y y w---m-y., e..r-,-.w, -..grc- -.-,_-g. ,4. - . - , ...a .g,m-g- '

-,-% -y,,on.y,..,9 ,==,e% g. . _-v,----r, ,-%,m3e- a,,,,_ --.,-,.,%-,,,,sr,.,w- m.-* e ----w~.