MONTHYEARML20205N9871999-04-14014 April 1999 Forwards NRC Approved Operator Licensing Exam (Facility Outline & Initial Exam Submittal & as-given Operating Exam) for Tests Administered on 990308-11 ML20203G0081999-02-12012 February 1999 Forwards NRC Approved Operator Licensing Exam (Facility Outline & Initial Exam Submittal & as-given Operating Exam) for Tests Administered on 981102-06 ML20211M5671997-10-0303 October 1997 Forwards Regulatory Documents Comprising Regulatory History of Notice of Proposed Rulemaking Entitled Financial Assurance Requirements for Decommissioning Nuclear Power Reactors, Which Amended 10CFR50,published in Fr on 970910 ML20149D7851997-07-14014 July 1997 Notification of Significant Licensee Meeting W/Util on 970731 in Arlington,Tx to Discuss Case Studies (Response Time & Reactor Feedwater Pump Trip Test) & Common Themes ML20137C9201997-03-20020 March 1997 Forwards Documentation of Meeting Conducted in Region 4 Office on 970225 to Discuss NRC Enforcement Policy as Applied to Nonescalated Enforcement ML20134P5931997-02-21021 February 1997 Forwards Order Imposing Civil Monetary Penalty for Transmittal to Ofc of Fr for Publication.W/O Encl ML20132F5421996-12-19019 December 1996 Forwards NRC Approved Operator Licensing Exam (Facility Outline & Initial Exam Submittal & as-given Operating Exam) for Tests Administered on 961007-11 ML20134E9191996-10-29029 October 1996 Forwards Rationale for Inital Plants Selected for Design Insps & for Plants Considered for Second Quarter FY97 Design Insps ML20203B9891995-11-20020 November 1995 Discusses OI Rept 4-95-032 Re Alleged False Statements by Fire Watches to NRC Inspectors.Oe Will Consider Matter Closed from Enforcement Perspective Unless Different View Received within 3 Wks of Date of This Memo ML20211M6231994-11-30030 November 1994 Provides Info to Commission on Status of Rulemaking Activities Re Power Reactor Decommissioning Cost Issues,Per 930714 SRM ML20236L5631994-08-10010 August 1994 Responds to Former Region V 930422 Request for NRR Evaluation of WPPSS Practices Associated W/Testing RHR Sys While Aligned in SPC Mode ML20056E5141993-08-12012 August 1993 Submits SALP Schedule for FY94 Per Mgt Directive 8.6 ML20056E4571993-08-0505 August 1993 Forwards Technical Review Rept Re, Tardy Licensee Actions Initiated Because of Delayed Replacement of Batteries in Uninterruptible Power Supplies at Plant ML20247G1561989-05-15015 May 1989 Forwards Director'S Decision 89-03 in Response to 2.206 Petition Re BWR Stability.Petition Filed by Hiatt on Behalf of Ocre Expressing Concerns Re 890309 Power Oscillattion Event & Requested Action W/Respect to All BWRs ML20245B6421989-04-15015 April 1989 Forwards Engineering Evaluation Rept on BWR Overfill Events Resulting in Steam Line Flooding.Though Little Actual Damage Experienced,Potential for Equipment Damage Believed to Exist & Any Damage Occurring Should Be Fixed Prior to Restart ML20245B6531989-04-15015 April 1989 Forwards Evaluation Rept on BWR Overfill Events Resulting in Flooding of Steam Lines.Events Determined to Involve Deficiencies in Control Sys ML20245B6191989-04-15015 April 1989 Forwards Evaluation Rept Re BWR Overfill Events Resulting in Steam Line Flooding.All Events Included Reactor Depressurization Followed by Uncontrolled Condensate or Condensate Booster Pumps Injection or Both ML20245B7501989-04-15015 April 1989 Forwards Engineering Evaluation Rept on BWR Overfill Events Resulting in Flooding of Steam Lines.Potential for Equipment Damage Believed to Exist & Any Damage Occurring Should Be Fixed Prior to Restart ML20147E3621988-02-28028 February 1988 Summary of 880223 Operating Reactors Events Meeting 88-008. List of Attendees,Tabulation of long-term Followup Assignments to Be Completed & Summary of Reactor Scrams Encl ML20195G7981987-07-31031 July 1987 Partially Deleted Memo Forwarding SALP Rept & Recommendations Re NRC Actions for Plant.W/O Encl IR 05000397/19870061987-07-0101 July 1987 Forwards Draft SALP Rept 50-397/87-06 for Feb-May 1987 for Review.Comments Requested at SALP Board Meeting Schedule for 870707 in Region V.Update of Tables 1-4 Included in Draft. W/O Rept ML20236B1451987-06-18018 June 1987 Forwards Response to DF Kirsch 870507 Memo Requesting Performance Analysis Info for Input to Facility SALP Rept. Review Results Provided in Encl.Encl Withheld ML20214M1381987-05-26026 May 1987 Provides Enforcement Guidance to Regions for Issues Re Control Room Habitability/Control Room Emergency Ventilation Sys Deficiencies.Summary of Plants Reviewed & Documents Describing Findings Encl ML20195G7931987-05-12012 May 1987 Forwards Insp & LER Data Tables for Use in Preparing Performance Analyses for Salp,Per DF Kirsch 870507 Memo. Tables Subj to Review & Comment Until SALP Process Complete. W/O Encls ML20214A0311987-05-12012 May 1987 Notifies of 870514 Briefing on Licensing & Operational Status of Plants Assigned to Project Directorate V,Including Diablo Canyon,Palo Verde,Rancho Seco,San Onfore,Trojan & WPPSS 2 ML20212M8601987-03-0909 March 1987 Forwards SER Re Concerns Identified in Plant Fire Protection Program,As Described in FSAR Through Amend 33.Concerns Resolved Except for Listed Items,Including Adequacy of Safe Shutdown Procedures.Review Excluded Amend 37 Items ML20154A2831986-12-13013 December 1986 Forwards Assessments by Enforcement Staff of Regional Performance in Enforcement Area from Jul-Nov 1985 ML20215G1361986-10-14014 October 1986 Summary of 861006 Operating Reactor Events Meeting 86-35 Re Events Since Last Meeting on 860929.Assignees Should Review Identified Responsibilities & Completion Dates & Advise If Dates Cannot Be Met.Attendance List & Viewgraphs Encl ML20215F2751986-10-0606 October 1986 Forwards Action Timetable Re Coordinated Approach to Resolution of Fire Protection Issues at Facility ML20209A8611986-09-0202 September 1986 Forwards Matls Needed to Complete Assignment During Emergency Preparedness Exercise on 860916-19.W/o Encl IR 05000397/19860121986-08-25025 August 1986 Notification of 860828 Meeting W/Util in Walnut Creek,Ca to Discuss Apparent Violations Involving Equipment Qualification (50-397/86-12),Region V Team Insp 50-397/86-11 & Control of Combustible Matls ML20204G4051986-08-0404 August 1986 Notification of 860909 Meeting W/Utils in Bethesda,Md to Discuss Nrc/Util Living Schedules,Util Performance,Legal Considerations,Tech Spec Improvements & Severe Accident Policy/Degraded Core Programs.Proposed Agenda Encl ML20207J2451986-07-16016 July 1986 Forwards Request for Addl Info Re Util Application to Amend Tech Spec 4.6.4.1 Concerning Drywell Vacuum Breakers,For Transmittal to Licensee.Receipt of Info After 860731 Will Require Rev to 860831 Anticipated Review Completion Date ML20058K6041986-07-0303 July 1986 Informs of Telcon on Status of EA-86-110 Re Health Physics/ Emergency Planning & EA-86-070 Re Fire Protection ML20203B0881986-07-0202 July 1986 Forwards SALP Rept for Feb 1985 - Jan 1986,for Review.Salp Board Rated Licensee Performance Category 1 in Area of Outages & Category 2 in All Other Areas Except Fire Protection.W/O Encls ML20236Y1311986-04-25025 April 1986 Forwards List of Primary Containment Isolation Valves & Valve P&ID Locations as Referenced in Util 860117 & 0218 Request for Amend to License NPF-21 ML20198D7151986-04-24024 April 1986 Forwards Insp Rept 50-397/86-05,notice of Violation & Enforcement History,For Consideration & Action.Civil Penalty Unwarranted Since Fire Watches Immediately Posted & Safety Significance of Fire Loadings Limited ML17278A7091986-04-16016 April 1986 Advises That Deletion of Technical Memo 1227 Overlooked During Issuance of Amend 31 to Fsar.Memo Deleted as Result of Incorporation of Scn 83-135 Into Amend ML20195G7731986-03-14014 March 1986 Forwards Draft SALP Rept for Feb 1985 - Jan 1986,for Review & Comment at 860319 Meeting at Region V.Updated Tables 1 & 4 Also Encl.W/O Encl ML20154K1511986-03-0303 March 1986 Notifies That SALP Board 860312 Meeting Rescheduled for 860319 at Region V.Deviation from Instruction 0701 to Permit a Toth Attendance at B&W Training Course on 860303-15 in Best Interest of SALP Process ML20199D1311986-02-19019 February 1986 Informs That Proposed Recirculation Pump Vibration Testing Plan Acceptable,Based on Licensee Testing Procedure & Supporting Stress Analysis ML20203B1101986-02-13013 February 1986 Forwards Assessment of Lers,Including Results for Input Into SALP Rept for Feb 1985 - Jan 1986.LERs of Above Average Quality ML20195G7801986-02-0909 February 1986 Forwards Data Tables for Use in Preparing Performance Analysis for Salp.Insp Results & LERs Occurring During Last Month of SALP May Not Be Included in Tables.Tables Subject to Review & Comment Until SALP Process Completed.W/O Encl ML20215N3041986-01-30030 January 1986 Provides Summary of Review of Past Experience as Related to Handling of Nonradiological Issues.State of Wa Notified by NRC of Industrial Safety Concerns at Facility.Dm Kunihiro 851213 Memo to State of Wa Encl ML20151Q9751986-01-29029 January 1986 Requests Identification of Div Contact for Regional Insp Team Leaders to Arrange NRR Alternative Shutdown & Fire Protection Reviewer Technical Assistance on region-based post-fire Safe Shutdown Insps.Schedule of Insps Submitted ML20149M8611986-01-24024 January 1986 Discusses 851202-06 Observation of Seven INPO Members & Two Industry Peer Evaluators During Conduct of Site Visit to Evaluate Three Training Programs at Plant.Significant Milestones Toward Accreditation of Training Programs Listed ML20198H2291986-01-22022 January 1986 Requests Date & Subj of Application for OL Issued on 840413.Info Needed to Complete Review of 850318 Transmittal of License Fee Data & Assessment of Fees & Contractual Costs Through 841222 ML20198G8771986-01-16016 January 1986 Forwards Brief Description & Evaluation of Util 850911 Proposed Tech Spec Change to Revise Composition of Corporate Nuclear Safety Review Board.Proposed Change Acceptable ML20198G8291986-01-0606 January 1986 Forwards Draft Response to 850718 Memo Re Inspector Feedback /Request for Technical Assistance on NUREG-0737,Item II.F.1.Response Based on Review of Util Position on Iodine plate-out ML20141E9281985-12-26026 December 1985 Recommends Survey of Plants Re Licensee Review of Preservice Insp Rept & Submittal of Relief Requests.Relief Requests from Preservice Insp Should Be Submitted Before Issuance of OL & Plant Startup to Permit NRC Review 1999-04-14
[Table view] Category:MEMORANDUMS-CORRESPONDENCE
MONTHYEARML20205N9871999-04-14014 April 1999 Forwards NRC Approved Operator Licensing Exam (Facility Outline & Initial Exam Submittal & as-given Operating Exam) for Tests Administered on 990308-11 ML20203G0081999-02-12012 February 1999 Forwards NRC Approved Operator Licensing Exam (Facility Outline & Initial Exam Submittal & as-given Operating Exam) for Tests Administered on 981102-06 ML20211M5671997-10-0303 October 1997 Forwards Regulatory Documents Comprising Regulatory History of Notice of Proposed Rulemaking Entitled Financial Assurance Requirements for Decommissioning Nuclear Power Reactors, Which Amended 10CFR50,published in Fr on 970910 ML20149D7851997-07-14014 July 1997 Notification of Significant Licensee Meeting W/Util on 970731 in Arlington,Tx to Discuss Case Studies (Response Time & Reactor Feedwater Pump Trip Test) & Common Themes ML20137C9201997-03-20020 March 1997 Forwards Documentation of Meeting Conducted in Region 4 Office on 970225 to Discuss NRC Enforcement Policy as Applied to Nonescalated Enforcement ML20134P5931997-02-21021 February 1997 Forwards Order Imposing Civil Monetary Penalty for Transmittal to Ofc of Fr for Publication.W/O Encl ML20132F5421996-12-19019 December 1996 Forwards NRC Approved Operator Licensing Exam (Facility Outline & Initial Exam Submittal & as-given Operating Exam) for Tests Administered on 961007-11 ML20134E9191996-10-29029 October 1996 Forwards Rationale for Inital Plants Selected for Design Insps & for Plants Considered for Second Quarter FY97 Design Insps ML20203B9891995-11-20020 November 1995 Discusses OI Rept 4-95-032 Re Alleged False Statements by Fire Watches to NRC Inspectors.Oe Will Consider Matter Closed from Enforcement Perspective Unless Different View Received within 3 Wks of Date of This Memo ML20211M6231994-11-30030 November 1994 Provides Info to Commission on Status of Rulemaking Activities Re Power Reactor Decommissioning Cost Issues,Per 930714 SRM ML20236L5631994-08-10010 August 1994 Responds to Former Region V 930422 Request for NRR Evaluation of WPPSS Practices Associated W/Testing RHR Sys While Aligned in SPC Mode ML20056E5141993-08-12012 August 1993 Submits SALP Schedule for FY94 Per Mgt Directive 8.6 ML20056E4571993-08-0505 August 1993 Forwards Technical Review Rept Re, Tardy Licensee Actions Initiated Because of Delayed Replacement of Batteries in Uninterruptible Power Supplies at Plant ML20247G1561989-05-15015 May 1989 Forwards Director'S Decision 89-03 in Response to 2.206 Petition Re BWR Stability.Petition Filed by Hiatt on Behalf of Ocre Expressing Concerns Re 890309 Power Oscillattion Event & Requested Action W/Respect to All BWRs ML20245B6421989-04-15015 April 1989 Forwards Engineering Evaluation Rept on BWR Overfill Events Resulting in Steam Line Flooding.Though Little Actual Damage Experienced,Potential for Equipment Damage Believed to Exist & Any Damage Occurring Should Be Fixed Prior to Restart ML20245B6531989-04-15015 April 1989 Forwards Evaluation Rept on BWR Overfill Events Resulting in Flooding of Steam Lines.Events Determined to Involve Deficiencies in Control Sys ML20245B6191989-04-15015 April 1989 Forwards Evaluation Rept Re BWR Overfill Events Resulting in Steam Line Flooding.All Events Included Reactor Depressurization Followed by Uncontrolled Condensate or Condensate Booster Pumps Injection or Both ML20245B7501989-04-15015 April 1989 Forwards Engineering Evaluation Rept on BWR Overfill Events Resulting in Flooding of Steam Lines.Potential for Equipment Damage Believed to Exist & Any Damage Occurring Should Be Fixed Prior to Restart ML20147E3621988-02-28028 February 1988 Summary of 880223 Operating Reactors Events Meeting 88-008. List of Attendees,Tabulation of long-term Followup Assignments to Be Completed & Summary of Reactor Scrams Encl ML20195G7981987-07-31031 July 1987 Partially Deleted Memo Forwarding SALP Rept & Recommendations Re NRC Actions for Plant.W/O Encl IR 05000397/19870061987-07-0101 July 1987 Forwards Draft SALP Rept 50-397/87-06 for Feb-May 1987 for Review.Comments Requested at SALP Board Meeting Schedule for 870707 in Region V.Update of Tables 1-4 Included in Draft. W/O Rept ML20236B1451987-06-18018 June 1987 Forwards Response to DF Kirsch 870507 Memo Requesting Performance Analysis Info for Input to Facility SALP Rept. Review Results Provided in Encl.Encl Withheld ML20214M1381987-05-26026 May 1987 Provides Enforcement Guidance to Regions for Issues Re Control Room Habitability/Control Room Emergency Ventilation Sys Deficiencies.Summary of Plants Reviewed & Documents Describing Findings Encl ML20195G7931987-05-12012 May 1987 Forwards Insp & LER Data Tables for Use in Preparing Performance Analyses for Salp,Per DF Kirsch 870507 Memo. Tables Subj to Review & Comment Until SALP Process Complete. W/O Encls ML20214A0311987-05-12012 May 1987 Notifies of 870514 Briefing on Licensing & Operational Status of Plants Assigned to Project Directorate V,Including Diablo Canyon,Palo Verde,Rancho Seco,San Onfore,Trojan & WPPSS 2 ML20212M8601987-03-0909 March 1987 Forwards SER Re Concerns Identified in Plant Fire Protection Program,As Described in FSAR Through Amend 33.Concerns Resolved Except for Listed Items,Including Adequacy of Safe Shutdown Procedures.Review Excluded Amend 37 Items ML20154A2831986-12-13013 December 1986 Forwards Assessments by Enforcement Staff of Regional Performance in Enforcement Area from Jul-Nov 1985 ML20215G1361986-10-14014 October 1986 Summary of 861006 Operating Reactor Events Meeting 86-35 Re Events Since Last Meeting on 860929.Assignees Should Review Identified Responsibilities & Completion Dates & Advise If Dates Cannot Be Met.Attendance List & Viewgraphs Encl ML20215F2751986-10-0606 October 1986 Forwards Action Timetable Re Coordinated Approach to Resolution of Fire Protection Issues at Facility ML20209A8611986-09-0202 September 1986 Forwards Matls Needed to Complete Assignment During Emergency Preparedness Exercise on 860916-19.W/o Encl IR 05000397/19860121986-08-25025 August 1986 Notification of 860828 Meeting W/Util in Walnut Creek,Ca to Discuss Apparent Violations Involving Equipment Qualification (50-397/86-12),Region V Team Insp 50-397/86-11 & Control of Combustible Matls ML20204G4051986-08-0404 August 1986 Notification of 860909 Meeting W/Utils in Bethesda,Md to Discuss Nrc/Util Living Schedules,Util Performance,Legal Considerations,Tech Spec Improvements & Severe Accident Policy/Degraded Core Programs.Proposed Agenda Encl ML20207J2451986-07-16016 July 1986 Forwards Request for Addl Info Re Util Application to Amend Tech Spec 4.6.4.1 Concerning Drywell Vacuum Breakers,For Transmittal to Licensee.Receipt of Info After 860731 Will Require Rev to 860831 Anticipated Review Completion Date ML20058K6041986-07-0303 July 1986 Informs of Telcon on Status of EA-86-110 Re Health Physics/ Emergency Planning & EA-86-070 Re Fire Protection ML20203B0881986-07-0202 July 1986 Forwards SALP Rept for Feb 1985 - Jan 1986,for Review.Salp Board Rated Licensee Performance Category 1 in Area of Outages & Category 2 in All Other Areas Except Fire Protection.W/O Encls ML20236Y1311986-04-25025 April 1986 Forwards List of Primary Containment Isolation Valves & Valve P&ID Locations as Referenced in Util 860117 & 0218 Request for Amend to License NPF-21 ML20198D7151986-04-24024 April 1986 Forwards Insp Rept 50-397/86-05,notice of Violation & Enforcement History,For Consideration & Action.Civil Penalty Unwarranted Since Fire Watches Immediately Posted & Safety Significance of Fire Loadings Limited ML17278A7091986-04-16016 April 1986 Advises That Deletion of Technical Memo 1227 Overlooked During Issuance of Amend 31 to Fsar.Memo Deleted as Result of Incorporation of Scn 83-135 Into Amend ML20195G7731986-03-14014 March 1986 Forwards Draft SALP Rept for Feb 1985 - Jan 1986,for Review & Comment at 860319 Meeting at Region V.Updated Tables 1 & 4 Also Encl.W/O Encl ML20154K1511986-03-0303 March 1986 Notifies That SALP Board 860312 Meeting Rescheduled for 860319 at Region V.Deviation from Instruction 0701 to Permit a Toth Attendance at B&W Training Course on 860303-15 in Best Interest of SALP Process ML20199D1311986-02-19019 February 1986 Informs That Proposed Recirculation Pump Vibration Testing Plan Acceptable,Based on Licensee Testing Procedure & Supporting Stress Analysis ML20203B1101986-02-13013 February 1986 Forwards Assessment of Lers,Including Results for Input Into SALP Rept for Feb 1985 - Jan 1986.LERs of Above Average Quality ML20195G7801986-02-0909 February 1986 Forwards Data Tables for Use in Preparing Performance Analysis for Salp.Insp Results & LERs Occurring During Last Month of SALP May Not Be Included in Tables.Tables Subject to Review & Comment Until SALP Process Completed.W/O Encl ML20215N3041986-01-30030 January 1986 Provides Summary of Review of Past Experience as Related to Handling of Nonradiological Issues.State of Wa Notified by NRC of Industrial Safety Concerns at Facility.Dm Kunihiro 851213 Memo to State of Wa Encl ML20151Q9751986-01-29029 January 1986 Requests Identification of Div Contact for Regional Insp Team Leaders to Arrange NRR Alternative Shutdown & Fire Protection Reviewer Technical Assistance on region-based post-fire Safe Shutdown Insps.Schedule of Insps Submitted ML20149M8611986-01-24024 January 1986 Discusses 851202-06 Observation of Seven INPO Members & Two Industry Peer Evaluators During Conduct of Site Visit to Evaluate Three Training Programs at Plant.Significant Milestones Toward Accreditation of Training Programs Listed ML20198H2291986-01-22022 January 1986 Requests Date & Subj of Application for OL Issued on 840413.Info Needed to Complete Review of 850318 Transmittal of License Fee Data & Assessment of Fees & Contractual Costs Through 841222 ML20198G8771986-01-16016 January 1986 Forwards Brief Description & Evaluation of Util 850911 Proposed Tech Spec Change to Revise Composition of Corporate Nuclear Safety Review Board.Proposed Change Acceptable ML20198G8291986-01-0606 January 1986 Forwards Draft Response to 850718 Memo Re Inspector Feedback /Request for Technical Assistance on NUREG-0737,Item II.F.1.Response Based on Review of Util Position on Iodine plate-out ML20141E9281985-12-26026 December 1985 Recommends Survey of Plants Re Licensee Review of Preservice Insp Rept & Submittal of Relief Requests.Relief Requests from Preservice Insp Should Be Submitted Before Issuance of OL & Plant Startup to Permit NRC Review 1999-04-14
[Table view] |
Text
.
Docket No. 50-397
- A 2 0 M Thomas F. Engelhardt Office of the General Counsel PROPOSED NOTICE OF HEARUM - HANFORD NUMBER Tim - DOCFJT NO. 50-397 Enclosed is a peoposed notice of hearing on the application of the Washington Public Power Supply Systen for a permit to construct the Hanford Number Two Nuclear Plant. I would appreciate having your concurrence or necessary corrections by the close of business on Wednesday, July 26, 1972.
Ot(sinal 315ed 8 by Roser S. noyes Roter S. Boyd, Assistent Director for Boilin,t Water Reactora Directorate of Licensing rnclosure As stated cc 'Jilliar $'asser, OCC Distribution T et F11e L4h7t.
L Reading CCR Reading R. S. Boyd H. Gearin S. Miner omcr > . .L t B3 , _
. .._ R.. . - .. -~ . 4 --
,,,,,,, HCcar15:et ,,, RAClark ,, RS.. , d_ . . . . .. . . .
ont> . 7//u
. . . = . .. /. 7 2 l
.. .. . .=. . . ;. 7. ./.
....4-/.- 7 2 7/ 2g =72 ..
-...~ -
===-
,,,. uc.u. t he, y die ALCM 0240 *ee .es-umen i eeara 9605220247 720720 PDR ADOCK 05000397 A PDR
UNITED STATES OF AMERICA ATOMIC ENERGY COMMISSION In the Matter of )
)
WASilINGTON PUBLIC F0WER SUPPLY ) Docket No. 50-397 SYSTEM )
)
(Hanford Number Two Nuc1 car Plant) )
NOTICE OF HEARING ON APPLICATION FOR CONSTRUCTION PERMIT Pursuant to the Atonic Energy Act of 1954, as amended (the Act),
and the regulations in Title 10, Code of Federal Regulations, Part 50, "Licenaing of Production and Utilization racilities," and Part 2, " Rules of Practice," notice is hereby given that a hearing will be held, at a time and place to be set in the future by an Atomic Safety and Licensing Board (Board), to considet the application filed under the Act by the Kashington Public Power Supply System (the applicant), for a construction permit for a boiling water nuclear reactor desigr.sted as Hanford Number Two Nuclear Plant (the f acility), which is designed for initial operation at approxinstely 3323 thermal megawatts with a net electrical output of approximately 1110 megawatts. The proposed facility la to be located on a site leased frcm the U. S. Atomic Energy Conmissinn (Commission) within the Ccmmission's Hanford Reservation in Benton County, Washington, about 12 miles north of the City of Richland, Washington. The hearing will be held in the vicinity of the site of the proposed facility.
The Board will be designated by the Atomic Energy Commission. Notice as to its racebership will be published in the FEDERAL REGISTER.
The date and place of a prehearing conference will be set by the Board. The date and place of the hearing will be set at or after the prehearing conference. In setting these dates due regard will be had for the convenience and necessity of the parties or their representatives, as well as of the Board members. Notices of the dates and i, laces of.the pre-hearing conference and the hearing will be published in the FEDERAL REGISTER.
Upon receipt of a favorable report by the Advisory Committee on Reactor Safeguards (ACRS) and upon completion by the Conmission's regulatory staff of a favorable safety evaluation of the application and an environ-mental review, the Director of Regulation will consider making affirmative findings on Items 1-3, a negative finding on Iten 4, and an affirmative finding on Item 5 specified below as a basis for the issuance of a con-struction permit to the applicant:
Issues Pursuant to the Atomic Energy Act of 1954, as anended
- 1. Whether in accordance with the provisions of 10 CFR 50.35(n):
(a) The applicant has described the proposed design of the facility including, but not limited to, the principal architectural and engineering criteria for the design, and has identified the major features or components incorporated therein for the pro-tection of the health and safety of the public; 1
9 e
(b) Such further technical or design information as may be required to complete the safety analysis and which can reasonably be left for later consideration, will be supplied in the final safety analysis report; (c) Safety features or components, if any, which require research and development have been described by the applicant and the applicant has identified, and there will be conducted a research and development program associated with such features or com-ponents; and (d) On the basis of the foregoing, there is reasonable assurance i that (1) such safety questions will be satisfactorily resolved at or before the latest date stated in the, application for completion of construction of the proposed facility, and (ii) taking into consideration the site criteria contained in 10 CFR Part 100, the proposed facility can be constructed and operated at the proposed location without undue risk to the health and safety of the public.
- 2. Whether the applicant is technically qualified to design and construct the proposed facility;
- 3. Whether the applicant is financially qualified to design and construct the proposed facility; and
- 4. Whether the issuance of a permit for construction of the facility will be inimical to the common defense and security or to the health and safety of the public.
Issue Pursuant to National Environmental Policy Act of 1969 (NEPA)
- 5. Whether, in accordance with the requirements of Appendix D of 10 CFR Part 50, the construction permit should be issued as proposed.
In the event that this proceeding is not a contested proceeding, as defined by 10 CFR 92.4(n) of the Commission's " Rules of Practice,"
- the Board will (1) without conducting a de novo review of the application, consider the issues of whether the application and the record of the pro-ceeding contain sufficient information, and the review of the Connission's regulatory staff has been adequate, to support the findings proposed to be made by the Director of Regulation on Items 1-4 above, and to support, insofar as the Commission's licensing requirements under the Act are concerned, the construction permit proposed to be issued by the Director of Regulation; and (2) determine whether the environmental review con-ducted by the Commission's regulatory staff pursuant to Appendix D of 10 CFR Part 50 has been adequate.
In the event that this proceeding becomes a contested proceeding, the Board will decide any matters in controversy among the parties and consider
and initially decide, as issues in this proceeding, Items 1-5 above as a basis for determining whether the construction permit should be issued to the applicant.
With respect to the Commission's responsibilities under NEPA, and regardless of whether the proceeding is contested or uncontested, the Board will, in accordance with section A.ll of Appendix D of 10 CFR Part 50, (1) determine whether the requirements of section 102(2)(C) and (D) of NEPA and Appendix D of 10 CFR Part 50 have been complied with in this pro-ceeding; (2) independently consider the final balance among conflicting factors contained in the record of the proceeding with a view to determining the appropriate action to be taken; and (3) determine whether the construc-tion permit should be granted, denied, or appropriately conditioned to protect environmental values.
As they become available, the application, the proposed construction permit, the applicant's sumnary of the application, the ACRS report, the Safety Evaluation by the Commission's regulatory staff, the applicant's Environmental Report, the Detailed Statement of Environmental Considerations, and the transcripts of the prehearing conference and of the hearing, will be placed in the Commission's Public Document Roon, 1717 H Street, N. W.,
Washington, D. C., where they will be available for inspection by members of the public. Copies of those documents will also be made available at the Richland Public Library, Swift and Northgate Streets, Richland,
l Washington 99352, for inspection by members of the public during business hours. Copies of the proposed construction permit, the ACRS report, the regulatory staff's Safety Evaluation and the Detailed Statement on Environ-mental Considerations may be obtained, when available, by request to the Deputy Director for Reactor Projects, Directorate of Licensing, United States Atomic Energy Conmission, Washington, D. C. 20545.
Any person who wishes to make an oral or written statenent in this proceeding setting forth his position on the issues specified, but who does not wish to file a petition for leave to intervene, may request permission to make a limited appearance pursuant to the provisions of 10 CFR 92.715 of the Commission's " Rules of Practice." Limited appear-ances will be permitted at the time of the hearing at the discretion of the Board, within such limits and on such conditions as may be fixed by the Board. Persons desiring to make a limited appearance are requested to inform the Secretary of the Commission, United States Atomic Energy Com-mission, Washington, D. C. 20545, not later than thirty (30) days from the date of publication of this notice in the FEDERAL REGISTER.
Any person whose interest raay be affected by the proceeding who does not wish to make a limited appearance and who wishes to participate as a party in the proceeding must file a petition for leave to intervene.
Petitions for leave to intervene, pursuant to the provision of 10 CFR 92.714 of the Commission's " Rules of Practice," must he received in the Office of the Secretary of the Commission, United States Atonic Energy Commission, Washington, D. C. 20545, Attention: Chief, Public Proceedings Branch, or the Commission's Public Document Room, 1717 H i
i Street, N. W., Washington, D. C. not later than thirty (30) days from 4
the date of publication of this notice in the FEDERAL REGISTER. The petition shall set forth the interest of the petitioner in the proceed-I j ing, how that interest may be affected by Commission action, and the contentions of the petitioner in reasonably specific detail. A petition which sets forth contentions relating only to matters outside the Commission's jurisdiction will be denied. A petition for leave to inter-vene which is not timely will be denied, unless, in accordance with 10 CFR i
92.714, the petitioner shows good cause for failure to file it on time.
a A person permitted to intervene becomes a party to the proceeding, and has all the rights of the applicant and the regulatory staff to participate fully in the conduct of the hearing. For example, he may examine and cross-examine witnesses. A person permitted to make a limited appearance does not become a party, but may state his position and raise questions which he would like to have answered to the extent that the questions are within the scope of the hearing as specified in i
a
J l
the issues set out above. A member of the public does not have the right to participate unless he has been granted the right to intervene as a party or a right of limited appearance.
An answer to this notice, pursuant to the provisions of 10 CFR 92.705 of the Commission's " Rules of Practice," must be filed by the applicant not later than twenty (20) days from the date of publication of this notice in the FEDERAL REGISTER. Papers required to be filed in this proceeding may be filed by mail or telegram addressed to the Secretary of the Com-mission, United States Atomic Energy Commission, Washington, D. C. 20545, Attention: Chief, Public Proceedings Branch, or may be filed by delivery to the Commission's Public Document Room, 1717 H Street, N. W., Washington, D. C.
Pending further order of the Board, parties are required to file, pursuant to the provisions of 10 CFR 82.708 of the Commission's " Rules of Practice," an original and twenty conformed copies of each such paper with the Commission.
With respect to this proceeding, the Commission has delgated to the Atomic Safety and Licensing Appeal Board the authority and the review function which would otherwise be exercised and performed by the Com-mission. The Commission has established the Appeal Board pursuant to i
e
e I
i.
10 CFR Section 2.785 of the Conunission's " Rules of Practice," and has made the delegation pursuant to subparagraph (a)(1) of that section.
The Appeal Board will be composed of the Chairman, the Vice Chairman and a third member to be designated by the Cossaission.
UNITED STATES ATOMIC ENERGY COMMISSION W. B. McCool Secretary of the Conunission Dated at this day of , 1972 O