|
---|
Category:INTERNAL OR EXTERNAL MEMORANDUM
MONTHYEARML20217L8781999-10-21021 October 1999 Notification of 991102 Meeting with Util in Rockville,Md to Discuss General Organizational Changes as Well as Priorization & Scheduling Issues Associated with Future Licensing Activities ML20217C6851999-10-0707 October 1999 Notification of 991104 Meeting with Entergy Operations,Inc in Arlington,Texas to Discuss License Renewal for Ano,Unit 1 ML20217A7971999-10-0606 October 1999 Forwards NRC Approved Operator Licensing Exam (Facility Outline & Initial Exam Submittal & as-given Operating Exam) for Tests Administered During Week of 990607 ML20212F5461999-09-23023 September 1999 Notification of 991004 Meeting with Utils in Rockville,Md to Update Status of Nuclear Mgt Company & Provide Details of Member Licensees Impending License Transfer Applications & Operating Agreement ML20211H4441999-08-27027 August 1999 Notification of Significant Meeting with Util on 990916 & 17 in Arlington,Tx to Improve Utility & NRC Understanding of Industry & Regulatory Perspectives on Current Issues ML20211C7301999-08-20020 August 1999 Notification of 990901 Meeting with Util in Rockville,Md to Discuss Licensee Planned Application for Conversion of Current TS to Improved Standard TS Prior to Submittal ML20209G2421999-07-14014 July 1999 Notification of 990722 Meeting with License in Rockville, MD to Discuss Changes in EOI Licensing Organization Including Division of Responsibilities within New EOI Corporate Licensing Group ML20207H6571999-07-12012 July 1999 Notification of 990722 Meeting with Util in Rockville,Md to Discuss Ongoing Improvement Initiatives,Status of Formation of Nuclear Mgt Company & Control Room Habitability & Potassium Iodide Issue ML20210A7751999-07-12012 July 1999 Canceled Notification of 990722 Meeting with Wepco in Rockville,Maryland to Discuss Stated Topics Re Point Beach NPP ML20196L1461999-07-0707 July 1999 Notification of 990720 Meeting with Wisconsin Electric Power Co in Rockville,Md to Discuss Control Room Habitability at Plant ML20212J1211999-06-20020 June 1999 Discusses Closeout of GL 92-01,Rev 1,Suppl 1, Reactor Vessel Structural Integrity, for Plant,Units 1 & 2 ML20210G9711999-06-16016 June 1999 Informs That on June 9,two Occurrences of Hydrogen Burns Took Place at Palisades During VSC-24 Loading Activities ML20210G9611999-06-14014 June 1999 Informs That Sfpo Not Sure of Having Lead for Palisades Events Being Handled by Region III Insp ML20210G9411999-06-11011 June 1999 Informs That on 990610 Palisades 1 Notfied NRC That on 990609,minor Hydrogen Burns Occurred During Welding of Structural Lid on Sf Storage Cask ML20210G9361999-06-10010 June 1999 Informs That Attachment Has Been Reviewed & Approved in DNMS Re Palisades Pn ML20210G9091999-06-10010 June 1999 Requests That Cio Make Copy of Pn to Be Sent to M Sinclair in Midland,Mi ML20210G8871999-06-10010 June 1999 Forwards Draft Pn Region Iii,Concerning Latest Hydrogen Burn at Palisades ML20207G5241999-06-0909 June 1999 Notification of 990628 Meeting with Util in Rockville,Md to Provide Opportunity to Discuss Methodology & Results of Evaluation to Facilitate NRC Technical Staff Review ML20205R8871999-04-20020 April 1999 Notification of 990504 Meeting with Util in Rockville,Md to Discuss Proposal to Submit Consolidated Security Plan for Util Sites ML20205L0961999-04-0909 April 1999 Notification of 990426 Meeting with Util to Discuss Licensee Plans to Submit Improved Standard TS for Plant,Units 1 & 2 ML20203H9411999-02-17017 February 1999 Notification of Meeting with Util on 990302 in Rockville,Md to Discuss Plant Plans for Steam Generator Tube Insp & Repairs During Future Unit 1 Outage Including Scheduling of Future TS Amend Requests for Potential SG Repairs ML20203H9511999-02-17017 February 1999 Notification of 990303 Meeting with Util in Rockville,Md to Discuss Technical & Scheduling Issues Associated with Active & Future Planned Licensing Actions ML20199K0811999-01-21021 January 1999 Submits Outline & Initial Exam Submittal for Operator Licensing Written Retake Exam,Administered on 981228 ML20202C4591999-01-21021 January 1999 Operator Licensing Written Retake Exam Repts 50-313/98-303 & 50-368/98-303 Administered on 981218,with as Given Written Exam ML20199B0421999-01-0707 January 1999 Notification of 990122 Meeting with Util in Rockville,Md to Discuss ANO Plans to Submit License Renewal Application for Unit 1 ML20198C8961998-12-16016 December 1998 Discusses Project Manager Guidance for risk-informed Confirmatory Orders on post-accident Hydrogen Monitoring ML20196F3931998-11-30030 November 1998 Forwards NRC Approved Operator Licensing Exam (Facility Outline & Initial Exam Submittal & as-given Operating Exam) for Tests Administered on 980914-18 at ANO-1 IR 05000313/19983021998-11-30030 November 1998 Forwards Exam Rept 50-313/98-302 with as Given Written Exam for Test Administered on 980914-18 ML20196F5281998-11-25025 November 1998 Notification of 981207 Meeting with Util in Rockville,Md to Discuss Licensees Efforts to Ensure Continued Compliance with 10CFR50.61,pressurized Thermal Shock Rule ML20195G1121998-11-17017 November 1998 Notification of 981201-02 Meeting with Entergy Operations in Taft,Louisianna to Conduct Joint Workshop for Licensing Personnel from Entergy & Nrc,Project Directorate IV-1 ML20206S6741998-10-29029 October 1998 Informs That During 980930-1002 ACRS 456th Meeting,Several Matters Discussed,Listed Repts & Ltrs Completed & Authorized Executive Director to Transmit Noted Memoranda ML20155A7071998-10-26026 October 1998 Notification of 981112 Meeting with Util in Arlington,Texas to Discuss Radiation Protection Program ML20154R3691998-10-19019 October 1998 Notification of 981029 Meeting with Listed Utils in Rockville,Md to Discuss Proposed Consortium of Utils ML20154N6851998-10-14014 October 1998 Informs That During 456th ACRS Meeting on 980930-1002, Committee Reviewed risk-informed Pilot Application for Monitoring Hydrogen Containment at Ano,Units 1 & 2 ML20154M1941998-10-14014 October 1998 Forwards Exam Rept with as Given Exam for Test Administered on 980831-0904 at Unit 2 ML20154G0241998-10-0505 October 1998 Notification of 981014 Meeting with Util to Discuss Licensee Submittal Re Plant Mod to Address Concerns About Response to Potential Loss of Power to Plant Protection Sys at ANO-2. License Amend Submitted on 980630 ML20153H6671998-09-0808 September 1998 Revised Notification of 981007 Meeting with Util to Discuss Level of Instructions & Details for Transferring QA Plan Details from Current Program Plans at Four Sites to Std Program Plan at All Sites.Originally Scheduled for 980929 ML20151U7971998-09-0808 September 1998 Notifies of 980929 Meeting with Util in Rockville,Md to Discuss Level of Instructions & Details for Transferring Quality Assurance Plan Details from Current Program Plans at Four Sites to Std Quality Assurance Program Plan ML20237E1581998-08-25025 August 1998 Notification of 980809 & 10 Meetings W/Energy Operations, Inc in Rockville,Md to Discuss Licensee Pilot Application for risk-informed ISI Program for Plant ML20237A2811998-08-12012 August 1998 Notification of 980827 Meeting W/Nrc & Util in Rockville,Md to Discuss Level of Instructions & Details for Transferring QA Plan Details from Current Program Plans at Four Sites ML20236R1371998-07-14014 July 1998 Notification of 980728 Meeting W/Entergy Operations,Inc in Rockville,Md to Discuss Licensee Plans for Replacing SG at ANO-2 During Refueling Outage in 2000 ML20249A2101998-06-11011 June 1998 Notification of 980702 Meeting W/Util in Rockville,Md to Discuss Level of Instructions & Details for Transferring Quality Assurance Plan Details from Current Program Plans at Four Sites to Std Quality Assurance Program Plan for Site ML20236N5891998-05-12012 May 1998 Provides Summary of VSC-24 Status.Informs That NRC Weld Team Completed Insp of UT Process That Will Be Used to Insp Both Currently Loaded Casks & Casks That Will Be Loaded in Future ML20216C0551998-05-0808 May 1998 Summarizes 980508 Telcon on 980508 Between T Malanowski & B Sasman of Wepc & L Gundrum & P Patnaik,Nrr Re Status of Evaluation & Resolution of Outliners for GL-87-02 & USI A-46.Forwards Summary of Status for A-46 Outliners ML20217Q7151998-05-0101 May 1998 Notification of 980604 Meeting W/Util in Rockville,Md to Discuss Util TS Change Request 204 Re Control Room Habitability for Plant,Units 1 & 2 ML20236N6121998-04-24024 April 1998 Informs That NMSS May Have Workable Solution Plan Re VSC-24 UT Insp.Will Keep People Informed of Schedule & Progress ML20236N5481998-04-24024 April 1998 Requests Set Up of Briefing to Discuss Results of Insp & Schedule for Next Milestones in Process Needed to Lift CALs IA-98-188, Informs That NMSS May Have Workable Solution Plan Re VSC-24 UT Insp.Will Keep People Informed of Schedule & Progress1998-04-24024 April 1998 Informs That NMSS May Have Workable Solution Plan Re VSC-24 UT Insp.Will Keep People Informed of Schedule & Progress ML20236N5271998-04-23023 April 1998 Advises That a Howe Informed That Time-of-Flight Improvement Over P-scan & That Insp Going Well.Team Still Needs to Come to Closure of Some Issues Re Sizing of Flaws ML20236N5211998-04-20020 April 1998 Informs That Weld Team Will Be at Palisades Conducting Insp of VSC-24 Owners Group UT Effort During Wk of 980420 1999-09-23
[Table view] Category:MEMORANDUMS-CORRESPONDENCE
MONTHYEARML20217L8781999-10-21021 October 1999 Notification of 991102 Meeting with Util in Rockville,Md to Discuss General Organizational Changes as Well as Priorization & Scheduling Issues Associated with Future Licensing Activities ML20217C6851999-10-0707 October 1999 Notification of 991104 Meeting with Entergy Operations,Inc in Arlington,Texas to Discuss License Renewal for Ano,Unit 1 ML20217A7971999-10-0606 October 1999 Forwards NRC Approved Operator Licensing Exam (Facility Outline & Initial Exam Submittal & as-given Operating Exam) for Tests Administered During Week of 990607 ML20212F5461999-09-23023 September 1999 Notification of 991004 Meeting with Utils in Rockville,Md to Update Status of Nuclear Mgt Company & Provide Details of Member Licensees Impending License Transfer Applications & Operating Agreement ML20211H4441999-08-27027 August 1999 Notification of Significant Meeting with Util on 990916 & 17 in Arlington,Tx to Improve Utility & NRC Understanding of Industry & Regulatory Perspectives on Current Issues ML20211C7301999-08-20020 August 1999 Notification of 990901 Meeting with Util in Rockville,Md to Discuss Licensee Planned Application for Conversion of Current TS to Improved Standard TS Prior to Submittal ML20209G2421999-07-14014 July 1999 Notification of 990722 Meeting with License in Rockville, MD to Discuss Changes in EOI Licensing Organization Including Division of Responsibilities within New EOI Corporate Licensing Group ML20210A7751999-07-12012 July 1999 Canceled Notification of 990722 Meeting with Wepco in Rockville,Maryland to Discuss Stated Topics Re Point Beach NPP ML20207H6571999-07-12012 July 1999 Notification of 990722 Meeting with Util in Rockville,Md to Discuss Ongoing Improvement Initiatives,Status of Formation of Nuclear Mgt Company & Control Room Habitability & Potassium Iodide Issue ML20196L1461999-07-0707 July 1999 Notification of 990720 Meeting with Wisconsin Electric Power Co in Rockville,Md to Discuss Control Room Habitability at Plant ML20212J1211999-06-20020 June 1999 Discusses Closeout of GL 92-01,Rev 1,Suppl 1, Reactor Vessel Structural Integrity, for Plant,Units 1 & 2 ML20210G9711999-06-16016 June 1999 Informs That on June 9,two Occurrences of Hydrogen Burns Took Place at Palisades During VSC-24 Loading Activities ML20210G9611999-06-14014 June 1999 Informs That Sfpo Not Sure of Having Lead for Palisades Events Being Handled by Region III Insp ML20210G9411999-06-11011 June 1999 Informs That on 990610 Palisades 1 Notfied NRC That on 990609,minor Hydrogen Burns Occurred During Welding of Structural Lid on Sf Storage Cask ML20210G8871999-06-10010 June 1999 Forwards Draft Pn Region Iii,Concerning Latest Hydrogen Burn at Palisades ML20210G9091999-06-10010 June 1999 Requests That Cio Make Copy of Pn to Be Sent to M Sinclair in Midland,Mi ML20210G9361999-06-10010 June 1999 Informs That Attachment Has Been Reviewed & Approved in DNMS Re Palisades Pn ML20207G5241999-06-0909 June 1999 Notification of 990628 Meeting with Util in Rockville,Md to Provide Opportunity to Discuss Methodology & Results of Evaluation to Facilitate NRC Technical Staff Review ML20205R8871999-04-20020 April 1999 Notification of 990504 Meeting with Util in Rockville,Md to Discuss Proposal to Submit Consolidated Security Plan for Util Sites ML20205L0961999-04-0909 April 1999 Notification of 990426 Meeting with Util to Discuss Licensee Plans to Submit Improved Standard TS for Plant,Units 1 & 2 ML20203H9411999-02-17017 February 1999 Notification of Meeting with Util on 990302 in Rockville,Md to Discuss Plant Plans for Steam Generator Tube Insp & Repairs During Future Unit 1 Outage Including Scheduling of Future TS Amend Requests for Potential SG Repairs ML20203H9511999-02-17017 February 1999 Notification of 990303 Meeting with Util in Rockville,Md to Discuss Technical & Scheduling Issues Associated with Active & Future Planned Licensing Actions ML20202C4591999-01-21021 January 1999 Operator Licensing Written Retake Exam Repts 50-313/98-303 & 50-368/98-303 Administered on 981218,with as Given Written Exam ML20199K0811999-01-21021 January 1999 Submits Outline & Initial Exam Submittal for Operator Licensing Written Retake Exam,Administered on 981228 ML20199B0421999-01-0707 January 1999 Notification of 990122 Meeting with Util in Rockville,Md to Discuss ANO Plans to Submit License Renewal Application for Unit 1 ML20198C8961998-12-16016 December 1998 Discusses Project Manager Guidance for risk-informed Confirmatory Orders on post-accident Hydrogen Monitoring IR 05000313/19983021998-11-30030 November 1998 Forwards Exam Rept 50-313/98-302 with as Given Written Exam for Test Administered on 980914-18 ML20196F3931998-11-30030 November 1998 Forwards NRC Approved Operator Licensing Exam (Facility Outline & Initial Exam Submittal & as-given Operating Exam) for Tests Administered on 980914-18 at ANO-1 ML20196F5281998-11-25025 November 1998 Notification of 981207 Meeting with Util in Rockville,Md to Discuss Licensees Efforts to Ensure Continued Compliance with 10CFR50.61,pressurized Thermal Shock Rule ML20195G1121998-11-17017 November 1998 Notification of 981201-02 Meeting with Entergy Operations in Taft,Louisianna to Conduct Joint Workshop for Licensing Personnel from Entergy & Nrc,Project Directorate IV-1 ML20206S6741998-10-29029 October 1998 Informs That During 980930-1002 ACRS 456th Meeting,Several Matters Discussed,Listed Repts & Ltrs Completed & Authorized Executive Director to Transmit Noted Memoranda ML20155A7071998-10-26026 October 1998 Notification of 981112 Meeting with Util in Arlington,Texas to Discuss Radiation Protection Program ML20154R3691998-10-19019 October 1998 Notification of 981029 Meeting with Listed Utils in Rockville,Md to Discuss Proposed Consortium of Utils ML20154N6851998-10-14014 October 1998 Informs That During 456th ACRS Meeting on 980930-1002, Committee Reviewed risk-informed Pilot Application for Monitoring Hydrogen Containment at Ano,Units 1 & 2 ML20154M1941998-10-14014 October 1998 Forwards Exam Rept with as Given Exam for Test Administered on 980831-0904 at Unit 2 ML20154G0241998-10-0505 October 1998 Notification of 981014 Meeting with Util to Discuss Licensee Submittal Re Plant Mod to Address Concerns About Response to Potential Loss of Power to Plant Protection Sys at ANO-2. License Amend Submitted on 980630 ML20151U7971998-09-0808 September 1998 Notifies of 980929 Meeting with Util in Rockville,Md to Discuss Level of Instructions & Details for Transferring Quality Assurance Plan Details from Current Program Plans at Four Sites to Std Quality Assurance Program Plan ML20153H6671998-09-0808 September 1998 Revised Notification of 981007 Meeting with Util to Discuss Level of Instructions & Details for Transferring QA Plan Details from Current Program Plans at Four Sites to Std Program Plan at All Sites.Originally Scheduled for 980929 ML20237E1581998-08-25025 August 1998 Notification of 980809 & 10 Meetings W/Energy Operations, Inc in Rockville,Md to Discuss Licensee Pilot Application for risk-informed ISI Program for Plant ML20237A2811998-08-12012 August 1998 Notification of 980827 Meeting W/Nrc & Util in Rockville,Md to Discuss Level of Instructions & Details for Transferring QA Plan Details from Current Program Plans at Four Sites ML20236R1371998-07-14014 July 1998 Notification of 980728 Meeting W/Entergy Operations,Inc in Rockville,Md to Discuss Licensee Plans for Replacing SG at ANO-2 During Refueling Outage in 2000 ML20249A2101998-06-11011 June 1998 Notification of 980702 Meeting W/Util in Rockville,Md to Discuss Level of Instructions & Details for Transferring Quality Assurance Plan Details from Current Program Plans at Four Sites to Std Quality Assurance Program Plan for Site ML20236N5891998-05-12012 May 1998 Provides Summary of VSC-24 Status.Informs That NRC Weld Team Completed Insp of UT Process That Will Be Used to Insp Both Currently Loaded Casks & Casks That Will Be Loaded in Future ML20216C0551998-05-0808 May 1998 Summarizes 980508 Telcon on 980508 Between T Malanowski & B Sasman of Wepc & L Gundrum & P Patnaik,Nrr Re Status of Evaluation & Resolution of Outliners for GL-87-02 & USI A-46.Forwards Summary of Status for A-46 Outliners ML20217Q7151998-05-0101 May 1998 Notification of 980604 Meeting W/Util in Rockville,Md to Discuss Util TS Change Request 204 Re Control Room Habitability for Plant,Units 1 & 2 IA-98-188, Informs That NMSS May Have Workable Solution Plan Re VSC-24 UT Insp.Will Keep People Informed of Schedule & Progress1998-04-24024 April 1998 Informs That NMSS May Have Workable Solution Plan Re VSC-24 UT Insp.Will Keep People Informed of Schedule & Progress ML20236N6121998-04-24024 April 1998 Informs That NMSS May Have Workable Solution Plan Re VSC-24 UT Insp.Will Keep People Informed of Schedule & Progress ML20236N5481998-04-24024 April 1998 Requests Set Up of Briefing to Discuss Results of Insp & Schedule for Next Milestones in Process Needed to Lift CALs ML20236N5271998-04-23023 April 1998 Advises That a Howe Informed That Time-of-Flight Improvement Over P-scan & That Insp Going Well.Team Still Needs to Come to Closure of Some Issues Re Sizing of Flaws ML20236N5211998-04-20020 April 1998 Informs That Weld Team Will Be at Palisades Conducting Insp of VSC-24 Owners Group UT Effort During Wk of 980420 1999-09-23
[Table view] |
Text
- . - - - - - _ _ _ . _ _ _ - - _ _ _ _ _ _ _ _ _ _ _ _ _ _
l T' o From: Allen Howej A/en tJ l To:
ARD1.ARP1.JVE, ARD1.ARP1.DBS, CHD1.CHP2.BLJ, CHD1.... /M f i Date: 3/26/98 8:34am
Subject:
VSC-24 Weld lasues Status I am providing you the attached status on the VSC-24 weld issues for your information. As always, future events and dates are subject to change. This does, however, provide a general outline of SFPO's intemal plan to complete the CAL items. As this is an intemal planning guide, I request that you maintain it as one. Please contact me or Tim Kobetz if you have any questions. Thanks Allen i CC: emh1, tjk1, ekb1 l
1 l
l l
l 1
\h
~2' 9807100144 900630 PDR FOIA '
DUM POR 1ve,S,98 - 188 ~
'T VSC 24 FABRICATION AND WELDING ISSUES TAC # L21140 Last Update: March 25,1998 Project Manager: Tim Kobotz Wold Team: A. Howe (Team Leader), K. Battige, G.Homeeth, M.Vassilaros, H. Lee, R.Parkhill, C.Interrante, E.Hackett T= Target: C= Complete: TBD=To be determened MILESTONES DATE TEAM lasue supplemental CALs to utilities 9/5/97C Kobotz Receive Consumers Enerov's CAL response (Palisades) 9/19/97C Receive Sierra Nuclear Corporation's (SNC) RAI response 9/19/97C Receive WEPCo's CAL response (Point Beach) 9/22/97C Receive Entergy's CAL response (ANO) 3/12/98C NRC review CAL responses and trubate RAls to resolve questens 9/19/97- Weld Team 11/6/97 VSC-24 Owners Group verbalty commets to perform UT 11/13/97C NRC issues letter to SNC desertbing commitments made to VSC 24 12/09/97C Kobotz Owners Group at a meetino December 4,1997 SNC sutwruts revised calculation for allowable flew deferubon in structural 12/17/97C lid weld SNC sutwruts schedule to qualify UT process 12/73/97C NRC completes review of revised allowable flaw size definition and 2/12/98C Wold Team notifies SNC that it is acceptable NRC observaten of implementaten of flaws into MSB mock-up 1/2W98C Battes & Parkhill l NRC inspection of P-Scan UT quehfcation process at ANO 3/20/98C Howe, Battige, Contractors NRC inspection of " Time of Flight
- UT C =% process at Paheados 4/24/98T Howe, Bathge, Contractors NRC completes independent fracture toughness techng and venication Spring /98T Weld Team RES of allowable flew definihon SNC sutmts revised calculaten for allowable flew delmibon in structural Spnng/98T lid weld usine fracture toughness testing resuNs,. Also SNC submits flew size acceptance ciiteria.
NRC completes techrucal review of an outstar.dmg RAI and CAL issues Late Wold Team issue Closeout Evaluation Report Sprino/98T Perform inspechons at ANO 6/98T Howe, Battige, Homeeth, Paa'an IV issue ANO inspechon Report; Ult CAL 6/98T Howe, Battge, Homseth, PW IV Perform inopochons at Pomt Beach 7/98T Kobotz, Bathge Region til MILESTONES DATE TEAM lasue Point Beach inspection Report; Lift CAL 7/98T Kobotz, Balbge PW lli Perform inspechons at Palasades Fall /98T Kobotz, Battige Reg 6on lli issue Paheados inspechon Report; Lift CAL Fall /98T Kobotz, Bathge Raf=t 111 inspect Point Beach cask loadena (1st load since H2 ionihon) TBD TBD inspection ANO cask loadma TBD TBD inspection Palisades cask loadme TBD TBD inspect Point Beach UT of previously loaded casks TBD TBD inspechon Pensades UT of previously loaded casks TBD TBD inspection ANO UT of previously loaded casks TBD TBD Bnef Desenchon Since 1992, NRC has contmuod to identify QA problems with SNC. In Spring 1997, NRC identified significant failures by SNC to perform effective corrective actions. One of the failures involved inadequate follow up to weld cracking problems encountered at ANO and Palisades during the loading of casks. In response, in
, l
- May 1997 CALs were issued to SNC and the user utilities (Pahsados, Point Beach and ANO) to resolve the welding problems before loading additional casks (the CALs were supplemented in September). During the investigation into 'j the welding problems, SNC became aware that March Metalfab (MMI), a subcontractor, had not documented all welding performed on the casks during fabrication. The E ::C- ik , also revealed that hydrogen induced cracking appeared to be the most likely contributor to the weld problems at ANO. At Palisades, the weld crack was caused by an existing condebon in the shell material which opened up during the shield-lid welding process. The crack l propagated along grain boundarios of a pre existing weld of unknown origin. Cracking identified at Point Beach was l attributed to poorjoint fit-up.
Currently, three primary problems exist; (1) welding procedures must be developed to inhibit hydrogen induced cracking. (2) due to the uncertainty of SNC's QA program and the identification of undocumented wolds,liconeses
! must certify the integrity of casks to be loaded in the future, and (3) NRC must confirm the integrity of previously l
loaded casks or require the casks be unloaded.
i Current Status. Transducer failures delayed w,-;E ':-, of P Scan demonstration at ANO. " Time of Flight" planned for Paheados during the week of MINV98 Fracture toughness testing of weld specimens by the licensees is ongoing Potential Problem / Resolution NONE Resource Exoendrture Approximately 0.5 FTE 1
1 e
l l
! l l
l i
i i
l l
O
,, Mall Envelope Info: (351 A596D.A46 : 17 : 42080)
Subject:
VSC 24 Weld issues Status Creation Date: 3/26/98 8:34am From: Allen Howe Created By: WND1.WNP7:AGH1 Recipients Action Date & Time Post Office ARD1.ARP1 DBS (David Spitzberg)
JVE (J. Vincent Everett)
Post Office CHD1.CHP2 BLJ (Bruce Jorgensen)
RBL (Ross Landsman)
Post Office TWD2.TWP0 emh1 CC (Edwin Hackett)
Post Office WND1.WNP7 ckb1 CC (Charles (Ken) Battige) tjk1 CC (Timothy Kobetz)
Post Office WND2.WNP3 LLG (Linda Gundrum)
PMR (Phillip Ray)
RGS (Robert Schaaf)
WDR (William Reckley)
Domain. Post Office Delivered Route ARD1.ARP1 Pending ARD1.ARP1 CHD1.CHP2 Pending CHD1.CHP2 TWD2.TWP0 Pending TWD2.TWP0 WND1.WNP7 Pending WND1.WNP7 WND2.WNP3 Pending WND2.WNP3 Files Size Date & Time MILESTON.R1 35088 03/25/98 07:56am MESSAGE 420 03/26/98 08:34am View 4109 03/26/98 03:34am Options Auto Delete: No Expiration Date: None Notify Recipients: No Priority: Normal Reply Requested: No Return Notification:: None Concealed
Subject:
No Security: Normal
o To Be Delivered: Im m ediato Status Tracking: Allinformation l
\
- _ _ _ _ . _