ML20210G941
ML20210G941 | |
Person / Time | |
---|---|
Site: | Palisades |
Issue date: | 06/11/1999 |
From: | Greene S NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS) |
To: | Easton E, Paperiello C, William E NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS) |
Shared Package | |
ML20210G839 | List: |
References | |
FOIA-99-264 NUDOCS 9908030236 | |
Download: ML20210G941 (1) | |
Similar Documents at Palisades | |
---|---|
Category:INTERNAL OR EXTERNAL MEMORANDUM
MONTHYEARML20217A7971999-10-0606 October 1999
[Table view]Forwards NRC Approved Operator Licensing Exam (Facility Outline & Initial Exam Submittal & as-given Operating Exam) for Tests Administered During Week of 990607 ML20210G9711999-06-16016 June 1999 Informs That on June 9,two Occurrences of Hydrogen Burns Took Place at Palisades During VSC-24 Loading Activities ML20210G9611999-06-14014 June 1999 Informs That Sfpo Not Sure of Having Lead for Palisades Events Being Handled by Region III Insp ML20210G9411999-06-11011 June 1999 Informs That on 990610 Palisades 1 Notfied NRC That on 990609,minor Hydrogen Burns Occurred During Welding of Structural Lid on Sf Storage Cask ML20210G9361999-06-10010 June 1999 Informs That Attachment Has Been Reviewed & Approved in DNMS Re Palisades Pn ML20210G8871999-06-10010 June 1999 Forwards Draft Pn Region Iii,Concerning Latest Hydrogen Burn at Palisades ML20210G9091999-06-10010 June 1999 Requests That Cio Make Copy of Pn to Be Sent to M Sinclair in Midland,Mi ML20196F5281998-11-25025 November 1998 Notification of 981207 Meeting with Util in Rockville,Md to Discuss Licensees Efforts to Ensure Continued Compliance with 10CFR50.61,pressurized Thermal Shock Rule ML20236N5211998-04-20020 April 1998 Informs That Weld Team Will Be at Palisades Conducting Insp of VSC-24 Owners Group UT Effort During Wk of 980420 ML20236K9301998-03-26026 March 1998 Forwards Status on VSC-24 Weld Issues for Info Purposes. Future Events & Dates Subject to Change.Provides Outline of Internal Plan to Complete CAL Items.Requests Maintaining Guide as Internal Planning Guide ML20236M1921998-02-23023 February 1998 Informs That VSC-24 Owners Group Wants to Postpone Insp of UT Exam Procedure for VSC-24 Closure Welds by 2 Weeks to Week of 980316 Due to Unsuccessful Paint Job on mock-up ML20236N4201998-01-30030 January 1998 Forwards NMSS Items of Interest for Wk Ending 980130.Items Include Meeting W/Ge on 980121,insp at Amersham on 980122-23,US EPA Meeting on 980122 to Discuss Groundwater C/A Program at Church Rock & Visit to Flawtech on 980122 ML20236N4821998-01-28028 January 1998 Informs That Flawtech Has Been Inserting Flaws in Palisades VSC-24 Mockup & That Palisades (R Humphrey) Will Perform UT Exam & Receipt Insp at Flawtech on 980202.Flawtech Will Ship Mockup to ANO on 980203 ML20236N5031998-01-26026 January 1998 Forwards Item of Interest Re Flawtech Methods for Inserting Flaws Into Metallic Component Specimens.Flawtech Currently Under Contract to Consumers Energy to Implant Flaws Into Palisades VSC-24 Dry Fuel Storage mock-up ML20138J7671997-02-0505 February 1997 Informs That NRC Plans to Administer Generic Fundamentals Exam Section of Written Operator Licenseing Exam on 970409. Ltr W/Copy to Chief,Operator Licensing Branch Must Be Submitted to Listed Address in Order to Register Personnel ML20133P4211997-01-21021 January 1997 Notification of 970129 Meeting W/State of Mi & FEMA in Rockville,Md to Discuss Potential Alternative Approaches to Management of Dose Assessment for Protective Action Decision Making W/Respect to Emergency Planning ML20132F4961996-12-20020 December 1996 Notification of 970109 Meeting W/Listed Attendess in Rockville,Md to Discuss Potential Alternative Approaches to Mgt of Dose Assessment for Protective Action Decision Making W/Respect to Emergency Planning ML20138G3651996-11-0505 November 1996 Requests That Listed Info Be Forwarded to Licensee in Connection W/Unescorted Access Visits to Plant by Listed NRC Contractor Employees During 961118-970110 for Purpose of Assisting NRC in Conduct of Design Insp.Partially Deleted ML20128G5751996-10-0303 October 1996 Forwards Ltr to Be Sent to Licensees of Six Pressurized Water Reactor Plants That Have Used Fuel Mfg by Siemens Power Corp Since 1986.Licensees Requested to Verify Compliance of 10CFR50.46 W/Regulations ML20134B7921996-06-24024 June 1996 Discusses Results of Audit Review of Changes to Siemens Large Break ECCS Evaluation Model ML20058N4811993-12-15015 December 1993 Informs of Decision to Expand Senior Mgt Oversight of Selected Plants,Per Recent Meeting W/J Martin & H Miller. Lists Assignment of Managers,Effective Immediately ML20056E4571993-08-0505 August 1993 Forwards Technical Review Rept Re, Tardy Licensee Actions Initiated Because of Delayed Replacement of Batteries in Uninterruptible Power Supplies at Plant ML20127N5641993-01-25025 January 1993 Notification of 930127-28 Meeting W/Util in Rockville,Md to Discuss I&C TS Amend & Proposed analog-to-digital Conversion at Plant ML20248E5481989-09-29029 September 1989 Forwards AEOD/T919, Failure of Overcurrent Protective Device at Palisades Unit 1. Expresses Desire to Investigate All Future Class IE Devices Failures in-depth ML20128C6331988-12-13013 December 1988 Discusses Licensee 10CFR21 Rept Re Substitution of Geuine Parts in Masoneilan Valves Supplied by S-C Controls to Various Nuclear Power Plants ML20127L5021988-11-0909 November 1988 Summary of 881028 Meeting by Util at Plant Re Nonconforming Parts Received from Sample-Webtrol for Masoneilan Valve. Meeting Brought Together Parties Involved & Discussed Possible Causes of Problem IA-92-253, Informs of 880408 Fitness for Duty Program Allegation Re Individual Being Hired at Plant W/Prior Drug Use Problem1988-08-12012 August 1988 Informs of 880408 Fitness for Duty Program Allegation Re Individual Being Hired at Plant W/Prior Drug Use Problem ML20125B7851988-08-12012 August 1988 Informs of 880408 Fitness for Duty Program Allegation Re Individual Being Hired at Plant W/Prior Drug Use Problem ML20125B7811988-08-0909 August 1988 Provides Listed Info as Required by Section 3.2 of RP 0517A Re Allegation AMS RIII-88-A-0105 Concerning Use of Drugs by Employees Working Midnight Shift at Plant IA-92-271, Provides Listed Info as Required by Section 3.2 of RP 0517A Re Allegation AMS RIII-88-A-0105 Concerning Use of Drugs by Employees Working Midnight Shift at Plant1988-08-0909 August 1988 Provides Listed Info as Required by Section 3.2 of RP 0517A Re Allegation AMS RIII-88-A-0105 Concerning Use of Drugs by Employees Working Midnight Shift at Plant ML20125B7461988-08-0303 August 1988 Discusses Allegation Re Drug Use by Night Shift Employees at Plant.Informs That Allegation Will Continue to Be Carried as Open in Allegation Mgt Sys Pending Final Resolution/ Closeout by Division ML20125B7431988-08-0101 August 1988 Discusses Allegation Received on 880729 Re Drug Use at Plant ML20155G7431988-06-0707 June 1988 Forwards F Miraglia 880527 Memo for Review & Requests Proposed Priorities for Actions on Project Manager Rept by C.O.B. 880609 ML20154Q1661988-05-27027 May 1988 Discusses Updating Project Managers Rept (Pmr) in Accordance W/New Priority Ranking Sys.Mods Have Been Made So That Pmr Will Now Accept New Priority Data.Old Priority Data Will Be Deleted During Wk of 880530.Sample Data Format Encl ML20148A7571988-03-14014 March 1988 Forwards Project Directorate III-1 Slides for 880317 Briefing of Executive Team.Slides Marked P Primary Slides Directorate Plans to Show.Other Slides Backup for Possible Ref IA-88-165, Discusses Topics for Senior Mgt Meeting & Submits Partial Listing of Facilities Where Vendor Support Has Been Problem,Vendor Involved & Component/Issue of Interest. W/Copyrighted Matl1988-03-0909 March 1988 Discusses Topics for Senior Mgt Meeting & Submits Partial Listing of Facilities Where Vendor Support Has Been Problem,Vendor Involved & Component/Issue of Interest. W/Copyrighted Matl ML20155K2001988-03-0909 March 1988 Discusses Topics for Senior Mgt Meeting & Submits Partial Listing of Facilities Where Vendor Support Has Been Problem,Vendor Involved & Component/Issue of Interest. W/Copyrighted Matl ML20236L6661987-11-0909 November 1987 Forwards Rev 1 to NUS-1721, App I Analysis,Crystal River Nuclear Unit & NUS-1729, App I Analysis,Palisades Plant, for Placement in Document Control Sys.Record Copy ML20151C7621987-10-15015 October 1987 Forwards FBI Communication to Be Disseminated Only to NRC Employees W/Need to Know.W/O FBI Communication.Records of 860610,0926,1212,870404 & 0929 Telcons & Region III Repts of 860610,870318 & 0929 Events Encl ML20147F5041987-02-25025 February 1987 Forwards Comments on Licensee Training Performance During Period of INPO Accreditation Effort.Certification of Licensed Operator Training Program Encl ML20154A2831986-12-13013 December 1986 Forwards Assessments by Enforcement Staff of Regional Performance in Enforcement Area from Jul-Nov 1985 ML20214K6021986-11-24024 November 1986 Forwards Tentative Itinerary for 861201 Visit to Facility by Commissioner Carr ML20214C4751986-11-17017 November 1986 Notifies of Rescheduling of SALP 7 Assessment Period.Period Extended Until 870131 Due to Extended Outage.Author 861106 Memo,Requesting SALP 7 Inputs,Should Be Disregarded ML20214C6861986-11-17017 November 1986 Forwards List of Missing SALP Evaluation Forms (0516B). Requests Review of Files to Locate Missing Forms.Recognizing That RP 0516B Issued in Mar 1986,request Applies Only to Repts Issued After Mar 1986 ML20207A0771986-10-15015 October 1986 Forwards Request for Addl Info Re ATWS Rule,To Be Transmitted to Licensee.Response Requested by 861201 in Order to Meet Target Completion Date for SER Input of 861231 ML20215G1361986-10-14014 October 1986 Summary of 861006 Operating Reactor Events Meeting 86-35 Re Events Since Last Meeting on 860929.Assignees Should Review Identified Responsibilities & Completion Dates & Advise If Dates Cannot Be Met.Attendance List & Viewgraphs Encl ML20209H0271986-09-10010 September 1986 Requests That Electrical Insp Be Performed at Facility to Review 860826 Failure of Power Supply Breaker to Vital Bus 1-E to Close Upon Demand.Response to Listed Questions Also Requested ML20203H2741986-07-28028 July 1986 Forwards,For Review,Latest Update of SALP Ratings ML20236X6731986-06-16016 June 1986 Forwards NRC plant-specific Backfit Regulatory Analysis,Per NRC Manual Chapter 0514,covering Actions in Encl 860521 Confirmatory Action Ltr Re 860519 Reactor Trip.Info from 860508 Backfitting Workshop in King of Prussia,Pa Encl ML20199C6411986-06-13013 June 1986 Forwards Itinerary for Commissioner Zech 860623 & 24 Visit to Facilities 1999-06-16 Category:MEMORANDUMS-CORRESPONDENCE MONTHYEARML20217A7971999-10-0606 October 1999
[Table view]Forwards NRC Approved Operator Licensing Exam (Facility Outline & Initial Exam Submittal & as-given Operating Exam) for Tests Administered During Week of 990607 ML20210G9711999-06-16016 June 1999 Informs That on June 9,two Occurrences of Hydrogen Burns Took Place at Palisades During VSC-24 Loading Activities ML20210G9611999-06-14014 June 1999 Informs That Sfpo Not Sure of Having Lead for Palisades Events Being Handled by Region III Insp ML20210G9411999-06-11011 June 1999 Informs That on 990610 Palisades 1 Notfied NRC That on 990609,minor Hydrogen Burns Occurred During Welding of Structural Lid on Sf Storage Cask ML20210G9091999-06-10010 June 1999 Requests That Cio Make Copy of Pn to Be Sent to M Sinclair in Midland,Mi ML20210G8871999-06-10010 June 1999 Forwards Draft Pn Region Iii,Concerning Latest Hydrogen Burn at Palisades ML20210G9361999-06-10010 June 1999 Informs That Attachment Has Been Reviewed & Approved in DNMS Re Palisades Pn ML20196F5281998-11-25025 November 1998 Notification of 981207 Meeting with Util in Rockville,Md to Discuss Licensees Efforts to Ensure Continued Compliance with 10CFR50.61,pressurized Thermal Shock Rule ML20236N5211998-04-20020 April 1998 Informs That Weld Team Will Be at Palisades Conducting Insp of VSC-24 Owners Group UT Effort During Wk of 980420 ML20236K9301998-03-26026 March 1998 Forwards Status on VSC-24 Weld Issues for Info Purposes. Future Events & Dates Subject to Change.Provides Outline of Internal Plan to Complete CAL Items.Requests Maintaining Guide as Internal Planning Guide ML20236M1921998-02-23023 February 1998 Informs That VSC-24 Owners Group Wants to Postpone Insp of UT Exam Procedure for VSC-24 Closure Welds by 2 Weeks to Week of 980316 Due to Unsuccessful Paint Job on mock-up ML20236N4201998-01-30030 January 1998 Forwards NMSS Items of Interest for Wk Ending 980130.Items Include Meeting W/Ge on 980121,insp at Amersham on 980122-23,US EPA Meeting on 980122 to Discuss Groundwater C/A Program at Church Rock & Visit to Flawtech on 980122 ML20236N4821998-01-28028 January 1998 Informs That Flawtech Has Been Inserting Flaws in Palisades VSC-24 Mockup & That Palisades (R Humphrey) Will Perform UT Exam & Receipt Insp at Flawtech on 980202.Flawtech Will Ship Mockup to ANO on 980203 ML20236N5031998-01-26026 January 1998 Forwards Item of Interest Re Flawtech Methods for Inserting Flaws Into Metallic Component Specimens.Flawtech Currently Under Contract to Consumers Energy to Implant Flaws Into Palisades VSC-24 Dry Fuel Storage mock-up ML20138J7671997-02-0505 February 1997 Informs That NRC Plans to Administer Generic Fundamentals Exam Section of Written Operator Licenseing Exam on 970409. Ltr W/Copy to Chief,Operator Licensing Branch Must Be Submitted to Listed Address in Order to Register Personnel ML20133P4211997-01-21021 January 1997 Notification of 970129 Meeting W/State of Mi & FEMA in Rockville,Md to Discuss Potential Alternative Approaches to Management of Dose Assessment for Protective Action Decision Making W/Respect to Emergency Planning ML20132F4961996-12-20020 December 1996 Notification of 970109 Meeting W/Listed Attendess in Rockville,Md to Discuss Potential Alternative Approaches to Mgt of Dose Assessment for Protective Action Decision Making W/Respect to Emergency Planning ML20138G3651996-11-0505 November 1996 Requests That Listed Info Be Forwarded to Licensee in Connection W/Unescorted Access Visits to Plant by Listed NRC Contractor Employees During 961118-970110 for Purpose of Assisting NRC in Conduct of Design Insp.Partially Deleted ML20128G5751996-10-0303 October 1996 Forwards Ltr to Be Sent to Licensees of Six Pressurized Water Reactor Plants That Have Used Fuel Mfg by Siemens Power Corp Since 1986.Licensees Requested to Verify Compliance of 10CFR50.46 W/Regulations ML20134B7921996-06-24024 June 1996 Discusses Results of Audit Review of Changes to Siemens Large Break ECCS Evaluation Model ML20058N4811993-12-15015 December 1993 Informs of Decision to Expand Senior Mgt Oversight of Selected Plants,Per Recent Meeting W/J Martin & H Miller. Lists Assignment of Managers,Effective Immediately ML20056E4571993-08-0505 August 1993 Forwards Technical Review Rept Re, Tardy Licensee Actions Initiated Because of Delayed Replacement of Batteries in Uninterruptible Power Supplies at Plant ML20127N5641993-01-25025 January 1993 Notification of 930127-28 Meeting W/Util in Rockville,Md to Discuss I&C TS Amend & Proposed analog-to-digital Conversion at Plant ML20248E5481989-09-29029 September 1989 Forwards AEOD/T919, Failure of Overcurrent Protective Device at Palisades Unit 1. Expresses Desire to Investigate All Future Class IE Devices Failures in-depth ML20128C6331988-12-13013 December 1988 Discusses Licensee 10CFR21 Rept Re Substitution of Geuine Parts in Masoneilan Valves Supplied by S-C Controls to Various Nuclear Power Plants ML20127L5021988-11-0909 November 1988 Summary of 881028 Meeting by Util at Plant Re Nonconforming Parts Received from Sample-Webtrol for Masoneilan Valve. Meeting Brought Together Parties Involved & Discussed Possible Causes of Problem IA-92-253, Informs of 880408 Fitness for Duty Program Allegation Re Individual Being Hired at Plant W/Prior Drug Use Problem1988-08-12012 August 1988 Informs of 880408 Fitness for Duty Program Allegation Re Individual Being Hired at Plant W/Prior Drug Use Problem ML20125B7851988-08-12012 August 1988 Informs of 880408 Fitness for Duty Program Allegation Re Individual Being Hired at Plant W/Prior Drug Use Problem IA-92-271, Provides Listed Info as Required by Section 3.2 of RP 0517A Re Allegation AMS RIII-88-A-0105 Concerning Use of Drugs by Employees Working Midnight Shift at Plant1988-08-0909 August 1988 Provides Listed Info as Required by Section 3.2 of RP 0517A Re Allegation AMS RIII-88-A-0105 Concerning Use of Drugs by Employees Working Midnight Shift at Plant ML20125B7811988-08-0909 August 1988 Provides Listed Info as Required by Section 3.2 of RP 0517A Re Allegation AMS RIII-88-A-0105 Concerning Use of Drugs by Employees Working Midnight Shift at Plant ML20125B7461988-08-0303 August 1988 Discusses Allegation Re Drug Use by Night Shift Employees at Plant.Informs That Allegation Will Continue to Be Carried as Open in Allegation Mgt Sys Pending Final Resolution/ Closeout by Division ML20125B7431988-08-0101 August 1988 Discusses Allegation Received on 880729 Re Drug Use at Plant ML20155G7431988-06-0707 June 1988 Forwards F Miraglia 880527 Memo for Review & Requests Proposed Priorities for Actions on Project Manager Rept by C.O.B. 880609 ML20154Q1661988-05-27027 May 1988 Discusses Updating Project Managers Rept (Pmr) in Accordance W/New Priority Ranking Sys.Mods Have Been Made So That Pmr Will Now Accept New Priority Data.Old Priority Data Will Be Deleted During Wk of 880530.Sample Data Format Encl ML20148A7571988-03-14014 March 1988 Forwards Project Directorate III-1 Slides for 880317 Briefing of Executive Team.Slides Marked P Primary Slides Directorate Plans to Show.Other Slides Backup for Possible Ref IA-88-165, Discusses Topics for Senior Mgt Meeting & Submits Partial Listing of Facilities Where Vendor Support Has Been Problem,Vendor Involved & Component/Issue of Interest. W/Copyrighted Matl1988-03-0909 March 1988 Discusses Topics for Senior Mgt Meeting & Submits Partial Listing of Facilities Where Vendor Support Has Been Problem,Vendor Involved & Component/Issue of Interest. W/Copyrighted Matl ML20155K2001988-03-0909 March 1988 Discusses Topics for Senior Mgt Meeting & Submits Partial Listing of Facilities Where Vendor Support Has Been Problem,Vendor Involved & Component/Issue of Interest. W/Copyrighted Matl ML20236L6661987-11-0909 November 1987 Forwards Rev 1 to NUS-1721, App I Analysis,Crystal River Nuclear Unit & NUS-1729, App I Analysis,Palisades Plant, for Placement in Document Control Sys.Record Copy ML20151C7621987-10-15015 October 1987 Forwards FBI Communication to Be Disseminated Only to NRC Employees W/Need to Know.W/O FBI Communication.Records of 860610,0926,1212,870404 & 0929 Telcons & Region III Repts of 860610,870318 & 0929 Events Encl ML20205R1101987-04-0101 April 1987 Staff Requirements Memo Re 870320 Discussion/Possible Vote on Restart.Region III Authorized to Permit Restart When Identified Prerequisites Completed.Continuation of Stringent Monitoring Programs Requested ML20147F5041987-02-25025 February 1987 Forwards Comments on Licensee Training Performance During Period of INPO Accreditation Effort.Certification of Licensed Operator Training Program Encl ML20154A2831986-12-13013 December 1986 Forwards Assessments by Enforcement Staff of Regional Performance in Enforcement Area from Jul-Nov 1985 ML20214K6021986-11-24024 November 1986 Forwards Tentative Itinerary for 861201 Visit to Facility by Commissioner Carr ML20214C6861986-11-17017 November 1986 Forwards List of Missing SALP Evaluation Forms (0516B). Requests Review of Files to Locate Missing Forms.Recognizing That RP 0516B Issued in Mar 1986,request Applies Only to Repts Issued After Mar 1986 ML20214C4751986-11-17017 November 1986 Notifies of Rescheduling of SALP 7 Assessment Period.Period Extended Until 870131 Due to Extended Outage.Author 861106 Memo,Requesting SALP 7 Inputs,Should Be Disregarded ML20207A0771986-10-15015 October 1986 Forwards Request for Addl Info Re ATWS Rule,To Be Transmitted to Licensee.Response Requested by 861201 in Order to Meet Target Completion Date for SER Input of 861231 ML20215G1361986-10-14014 October 1986 Summary of 861006 Operating Reactor Events Meeting 86-35 Re Events Since Last Meeting on 860929.Assignees Should Review Identified Responsibilities & Completion Dates & Advise If Dates Cannot Be Met.Attendance List & Viewgraphs Encl ML20209H0271986-09-10010 September 1986 Requests That Electrical Insp Be Performed at Facility to Review 860826 Failure of Power Supply Breaker to Vital Bus 1-E to Close Upon Demand.Response to Listed Questions Also Requested ML20203H2741986-07-28028 July 1986 Forwards,For Review,Latest Update of SALP Ratings ML20236X6731986-06-16016 June 1986 Forwards NRC plant-specific Backfit Regulatory Analysis,Per NRC Manual Chapter 0514,covering Actions in Encl 860521 Confirmatory Action Ltr Re 860519 Reactor Trip.Info from 860508 Backfitting Workshop in King of Prussia,Pa Encl 1999-06-16 |
Text
i Pega 1]
f Patricialng - Fwd; Rlli- PN399032
- 3
~
From: Susan GreenejD \
To: Carl Paperiellf, E. William rach, EarfEaston, ...
Date: Fri, Jun 11,199912:12 PM
Subject:
Fwd: Rill- PN399031 The following information is provided FYi as part of the IMNS regional coordination effort i On 6/1999, Palisades 1 notified NRC that, at about 5:00 pm and 7:30 pm on 6/9/99, minor hydrogen bums occurred during the welding of the structurallid on a spent fuel storage cask. These brief bums occurred outside the cask at the discharge end of the tygon tubing being used to draw gases from the interior of the cask, in each instance, the flame was extinguished by pinching the tygon tubing.
This hydrogen buming is of minor safety significance because the buming was outside the cask at the discharge end of the tubing and no air was being added to the cask that would support ignition of any hydrogen inside the cask. This case is significcat because of the lack of management control at the because management was not notified of these events until the next morning.
Additional, more specific information is contained in the attached PN.