ML20236N589
Text
_ _ - _ _ _ _ _
a f
From:
Timothy Kobetzf 4/p%.L5' To:
ARD1.ARP1.JVE, ARD1.ARP1.DBS, CHD1.CH32.BLJ, CHD1..
A./M U j
Date:
5/12/98 9:47am
Subject:
VSC-24 Status
Dear Regional Counterparts,
I've either spoken with you directly or left a voice message for you conceming the status of the VSC-24 CALs. The following is a summary.
The NRC Weld Team has completed an inspection of the UT procesi that will be used to inspect both currently loaded casks and those that will be loaded in the future. The Team lound the process acceptable. This will be documented in a report in a few weeks.
The Team has come to a consensus on the flaw size acceptance criteria. This will be finalized over the next week or so.
Therefore, NRC could be ready as soon as late June to perform the CAL closeout inspection at Point Beach and Late July at ANO. The would albw them to load casks the subsequent months. As we've discussed in the past any regional participation in the inspections'would be welcome.
However. last week SNC sent NRC a response to the DFl regarding the independent design control review. The response had not been given to the utilities for comment prior to being sent to us. The utilities are very concerned that the issues as portrayed in the response are not factual in all cases. The utilities are working together to resolve the issues. In addition, we are preparing a letter to each of the utilities stating that they must respond to the issues before loading additional casks.
Please contact me if you would like additional information.
Tim CC:
EJL, DGR, WN02.WNP3.RGS, WND2.WNP3.WDR, WND2.WNP3..
i I
b 1/
4 9807150186 980630 l
PDR-FOIA l
DUMS98-188 PDR 0__-_- __2?UK?? _ IE ?
I
}..
Mall Envelope info: (355852F9AFS : 14 :44888)
Subject:
VSC-24 Status Creation Date:
5/12/98 9:47am FrofM:
Timothy Kobetz Created By:
WND1.WNP7:TJK1 Recipients Post Office ARDI ARP1 DBS (David Spitzberg)
JVE (J. Vincent Everett)
Post Office CHD1.CHP2 BLJ (Bruce Jorgensen)
RBL (Ross Landsman)
Post Office WND1.WNP7 DGR CC (Dennis Reid)
EJL CC (Eric Leeds)
Post Office WND2.WNP3 LLG CC (Linda Gundrum)
RGS CC (Robert Schaaf)
WDR CC (William Reckley)
Domain. Post Office Route ARD1ARP1-ARD1ARP1 CHD1.CHP2 CHD1.CHP2 WND1.WNP7 WND1.WNP7 WND2.WNP3 WND2.WNP3 Piles Size Date & Time MESSAGE 1411 05/12/98 09:47am View 4109 05/12/98 05:47am Options Expiration Date:
None Priority:
Nc,.rr -'
4 Reply Requested:
No Return Notification::
None Concealed SubjeCC No Security:
Normal l