JAFP-98-0135, Provides Addl Clarification Re Proposed Commitments Contained in 961126 & s.Future Changes to Authority Controlled Procedure Will Be Accomplished Using 10CFR50.59 Process

From kanterella
Revision as of 21:26, 26 July 2021 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Provides Addl Clarification Re Proposed Commitments Contained in 961126 & s.Future Changes to Authority Controlled Procedure Will Be Accomplished Using 10CFR50.59 Process
ML20217E327
Person / Time
Site: FitzPatrick Constellation icon.png
Issue date: 04/17/1998
From: Michael Colomb
POWER AUTHORITY OF THE STATE OF NEW YORK (NEW YORK
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
JAFP-98-0135, JAFP-98-135, NUDOCS 9804270267
Download: ML20217E327 (2)


Text

.+ . J:mes A. FitzPitrick Nucle;r Power Pl:nt

, , 268 Lske Road

! P.O. Box 41 Lycoming. New York 13093 315-342 3840 A NesvYorkPower uicnaei J. coioms 4# Authority sae execu*e omcer April 17,1998 JAFP-98-0135 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Mail Station P1-137 Washington, DC 20555

Subject:

James A FitzPatrick Nuclear Power Plant Docket No. 50-333 Relocation of Operability and Surveillance Requirements from the Technical Specifications to Authority Controlled Procedures per Proposed Amendments (JPTS-96-001 and 96-002)

References:

1. Letter JPN-96-051 from William J Cahill, Jr. (NYPA) to U. S.

Nuclear Regulatory Commission (USNRC), dated November 26, 1996. (JPTS-96-001)

2. Letter JAFP-98-0046 from Michael J. Colomb (NYPA) to U. S.

Nuclear Regulatory Commission (USNRC), dated February 6, t 1998. (JPTS-96-002)

Dear Sir:

This letter provides additional clarification regarding proposed commitments j contained in References 1 and 2. Two proposed commitments contained in the  !

referenced submittals relocate technical specification operability and surveillance requirements to an Authority controlled procedure. Future changes to the Authority controlled procedure will be accomplished using the 10CFR50.59 process. The two commitments are revised as follows:

JPN-96-051-02 is changed to "The operation and surveillance requirements for snubbers will be sufficiently described in the FSAR to ensure that future changes to these requirements will be controlled under the provisions of 10CFR50.59."

JAFP-98-0046-01 is changed to " Relocate the operability and surveillance requirements for logic bus power monitors, core spray sparger d/p, and LPCI cross-connect valve position instruments to an authority controlled document. Revise actions for inoperable instrument channels to require associated parameter be monitored at least every 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />, rather than j r,,)

placing channelin trip. The operability and surveillance requirements for these instruments will be sufficiently described in the FSAR to ensure that future changes to these requirements will be controlled under the provisions of 10CFR50.59."

fo ol O

9804270267 980417 PDR ADOCK 05000333 P PDR

,. *U.S. Nucle:r Regulatory C:mmisri:n Attn: Document C:ntrol De:k Ptge l l <

1 if you have any questions, please contact Mr. Arthur Zaremba, Licensing Manager, at (315) 349-6365.

Very truly yours,

(

. W( /

MICHAEL J. COLOMB ]

Site Executive Officer MJC:RFS: lad STATE OF NEW YORK COUNTY OF OSWEGO Subscribed and sworn to before me This 11 day of/lh' l .1998 v

An4, h f/LPL ~

Motary Pudlic' ' d NANCYB.CZEROW cc: Regional Administrator ouN,in os "

U.S. Nuclear Regulatory Commission c_ '- WM 475 Allendale Road

]

King of Prussia, PA 19406 i

Office of the Resident inspector  !

U.S. Nuclear Ro0ulatory Commission P.O. Box 136 Lycoming, NY 13093 Joseph Williams, Project Manager Project Directorate 1-1 Division of Reactor Projects - 1/11 U.S. Nuclear Regulatory Commission Mail Stop 14 B2 Washington, DC 20555 i