|
---|
Category:Inspection Plan
MONTHYEARIR 05000338/20240052024-08-27027 August 2024 Updated Inspection Plan for North Anna Power Station, Units 1 and 2 (Report 05000338/2024005 and 05000339/2024005) IR 05000338/20230062024-02-28028 February 2024 Annual Assessment Letter for North Anna Power Station, Units 1 and 2 - NRC Inspection Reports 05000338/2023006 and 05000339/2023006 IR 05000338/20230052023-08-25025 August 2023 Updated Inspection Plan for North Anna Power Station, Units 1 and 2 (Report 05000338 2023005 and 05000339 2023005) IR 05000338/20220062023-03-0101 March 2023 Annual Assessment Letter for North Anna Power Station, Units 1 and 2 - NRC Inspection Reports 05000338/2022006 and 05000339/2022006 ML23046A1952023-02-15015 February 2023 Notification of Inspection and Request for Information for NRC Problem Identification and Resolution Inspection IR 05000338/20220052022-08-30030 August 2022 Updated Inspection Plan for North Anna Power Station, Units 1 and 2 Reports 05000338/2022005 and 05000339/2022005 IR 05000338/20210062022-03-0202 March 2022 Annual Assessment Letter for North Anna Power Station, Units 1 and 2 (Reports No. 05000338/2021006 and 05000339/2021006) IR 05000338/20210052021-08-31031 August 2021 Mid-Cycle Letter Revised Updated Inspection Plan for North Anna Power Station, Units 1 and 2 (Report 05000338/2021005 and 05000339/2021005) ML21165A1222021-06-14014 June 2021 Notification of Inspection and Request for Information for NRC Problem Identification and Resolution Inspection ML21154A0662021-06-0202 June 2021 Notification of North Anna Power Station, Units 1 & 2 - Design Bases Assurance Inspection (Team) U.S. Nuuclear Regulatory Commission Inspection Report 05000338/2021010 and 05000339/2021010 ML21145A0052021-05-25025 May 2021 2021003 North Anna Nuclear Power Station Document Request Letter ML21075A0032021-03-12012 March 2021 Emergency Preparedness Exercise Inspection Request for Information for - Brunswick, Catawba, North Anna, Oconee, Vogtle 1 & 2 IR 05000338/20200062021-03-0303 March 2021 Annual Assessment Letter for North Anna Power Station, Units 1 and 2 NRC Inspection Reports 05000338/2020006 and 05000339/2020006 ML21028A4352021-01-28028 January 2021 Notification of Target Set Inspection and Request for Information (NRC Inspection Report No. 05000338/2021404 and 05000339/2021404) ML21019A4512021-01-19019 January 2021 Notification of Inspection and Request for Information IR 05000338/20200052020-08-24024 August 2020 Updated Inspection Plan for North Anna Power Station, Units 1 and 2 (Report 05000338/2020005 and 05000339/2020005) ML20223A3412020-08-10010 August 2020 003 Radiation Safety Baseline Inspection Information Request ML20218A4282020-08-0505 August 2020 Notification of Inspection and Request for Information ML20182A0332020-06-30030 June 2020 Notification of Inspection and Request for Information ML20175A5532020-06-23023 June 2020 Emergency Preparedness Exercise Inspection Request for Information IR 05000338/20190062020-03-0303 March 2020 Annual Assessment Letter for North Anna Power Station, Units 1 and 2 - NRC Inspection Reports 05000338/2019006 and 05000339/2019006 ML19326C9882019-11-21021 November 2019 Requalification Program Inspection North Anna Power Station IR 05000338/20190052019-08-27027 August 2019 Updated Inspection Plan for North Anna Power Station, Units 1 and 2, NRC Report 05000338/2019005 and 05000339/2019005 ML19235A1992019-08-23023 August 2019 Baseline Inservice Inspection RFI IR 05000338/20180062019-03-0404 March 2019 Annual Assessment Letter for North Anna, Units 1 and 2; NRC Inspection Report 05000338/2018006 and 05000339/2018006 ML19030A6962019-01-29029 January 2019 ISI RFI IR 05000338/20180052018-08-23023 August 2018 Updated Inspection Plan for North Anna Power Station Units 1 and 2, NRC Report 05000338/2018005 and 05000339/2018005 ML18059A0942018-02-28028 February 2018 EOC Assessment Letter IR 05000338/20170052017-08-21021 August 2017 Updated Inspection Plan for North Anna Power Station, Units 1 and 2 - Report 05000338/2017005 and 05000339/2017005 ML17156A0662017-06-0202 June 2017 Notification of Inspection and Request for Information IR 05000338/20160062017-03-0101 March 2017 Annual Assessment Letter for North Anna Power Station, Units 1 and 2 - Report 05000338/2016006 and 05000339/2016006 IR 05000338/20160052016-08-31031 August 2016 Mid-Cycle Assessment Letter for North Anna Power Station, Units 1 and 2 - NRC Inspection Report 05000338, 339/2016005 ML16222A9132016-08-0808 August 2016 Notification of Inspection and Request for Information IR 05000338/20150062016-03-0202 March 2016 Annual Assessment Letter for North Anna Power Station Units 1 and 2 - NRC Inspection Report 05000338/2015006 and 05000339/2015006 ML16013A0622016-01-12012 January 2016 North Anna Power Station, Unit 2 - Notification of Inspection and Request for Information IR 05000338/20150052015-09-0101 September 2015 Mid-Cycle Letter for North Anna Power Station, Units 1 and 2 - NRC Assessment Report 05000338/2015005 and 05000339/2015005 IR 05000338/20140012015-03-0404 March 2015 Annual Assessment Letter for North Anna Power Station, Units 1 and 2 - Report 05000338/2014001 and 05000339/2014001 ML14245A1902014-09-0202 September 2014 Mid-Cycle Ltr 2014 IR 05000338/20130012014-03-0404 March 2014 Annual Assessment Letter for North Anna Power Station, Units 1 and 2 - Report 05000338/2013001 and 05000339/2013001 ML14022A0412014-01-21021 January 2014 TI-182 Phase 2 RFI Final ML13246A1322013-09-0303 September 2013 Mid Cycle Assessment Letter IR 05000338/20120012013-03-0404 March 2013 Annual Assessment Letter North Anna, Units 1 and 2, 05000338/2012001 and 05000339/2012001 ML13037A1712013-02-0101 February 2013 Notification of Inspection and Request for Information ML13032A5532013-02-0101 February 2013 Notification of Inspection and Request for Information for NRC Problem Identification and Resolution Inspection ML12248A1102012-09-0404 September 2012 Mid Cycle Assessment Letter North Anna 2012 ML12235A2912012-08-17017 August 2012 IR 05000338-12-012, 05000339-12-012, on 10/28/2011, North Anna Power Station, Units 1 & 2 - Notification of Conduct of a Triennial Fire Protection Baseline Inspection ML1206506412012-03-0505 March 2012 End of Cycle Assessment Report 22 ML1124400992011-09-0101 September 2011 Report 22, Inspection/Activity Plan ML1106303432011-03-0404 March 2011 Inspection/Activity Plan 03/01/2011 - 06/30/2012, EOC Report 22 ML1024402812010-09-0101 September 2010 Report 22 - 2010 Mid Cycle Inspection/Activity Plan 2024-08-27
[Table view] Category:Letter
MONTHYEARIR 05000338/20240032024-10-28028 October 2024 – Integrated Inspection Report 05000338-2024003 and 05000339-2024003 ML24283A0392024-10-0909 October 2024 Annual Submittal of Technical Specification Bases Changes Pursuant to Technical Specification 5.5.13.D ML24281A1372024-10-0707 October 2024 ISFSI - Submittal of Cask Registration for Spent Fuel Storage 05000338/LER-2024-001-01, Automatic Reactor Trip Due to Prni High Negative Rate2024-09-24024 September 2024 Automatic Reactor Trip Due to Prni High Negative Rate IR 05000338/20244202024-09-23023 September 2024 Security Baseline Inspection Report 05000338/2024420 and 05000339/2024420, Cover Letter ML24243A0872024-09-20020 September 2024 Response to EPA Comments Regarding the Final Site Specific Supplement to the Generic Eist for License Renewal North Anna Power Station, Units 1 and 2 IR 05000338/20244022024-09-17017 September 2024 Security Baseline Inspection Report 05000338/2024402 and 05000339/2024402 ML24215A2622024-08-28028 August 2024 Transmittal Letter for Subsequent Renewed License IR 05000338/20240052024-08-27027 August 2024 Updated Inspection Plan for North Anna Power Station, Units 1 and 2 (Report 05000338/2024005 and 05000339/2024005) 05000339/LER-2024-001-01, Loss of Generator Field for 2J Eog During 2-PT-82.282024-08-20020 August 2024 Loss of Generator Field for 2J Eog During 2-PT-82.28 ML24234A0742024-08-15015 August 2024 Notification of Deviation from Pressurized Water Reactor Owners Group (PWROG) Letter OG-23-63, NEI 03-08 Needed Guidance: PWR Thermal Shield Flexure Inspection Requirements ML24221A1932024-08-0808 August 2024 Tribal Section 106 Letters-North Anna - Upper Mattaponi Tribe ML24206A0052024-08-0808 August 2024 SLR Final EIS Letter to Achp ML24221A1882024-08-0808 August 2024 Tribal Section 106 Letters-North Anna - Monacan Indian Nation ML24221A1842024-08-0808 August 2024 Tribal Section 106 Letters-North Anna - Delaware Nation, Oklahoma ML24221A1922024-08-0808 August 2024 Tribal Section 106 Letters-North Anna - Tuscarora Nation of New York ML24221A1912024-08-0808 August 2024 Tribal Section 106 Letters-North Anna - Rappahannock Tribe, Inc ML24221A1942024-08-0808 August 2024 Tribal Section 106 Letters-North Anna-United Keetoowah Band of Cherokee Indians in Oklahoma ML24221A1852024-08-0808 August 2024 Tribal Section 106 Letters-North Anna - Delaware Tribe of Indians ML24221A1832024-08-0808 August 2024 Tribal Section 106 Letters-North Anna - Chickahominy Indian Tribe-Eastern Division ML24206A0062024-08-0808 August 2024 Notice of Availability of the Final Environmental Impact Statement for the North Anna Nuclear Power Station Unit Numbers 1 and 2 Subsequent License Renewal (Docket Numbers: 50-338 and 50-339) ML24163A3002024-08-0808 August 2024 Request for Relief Request N1-I5-NDE-007 Inservice Inspection Alternative ML24208A0142024-08-0808 August 2024 Tribal Section 106 Letters-North Anna-Absentee-Shawnee Tribe of Indians of Oklahoma ML24221A1872024-08-0808 August 2024 Tribal Section 106 Letters-North Anna - Eastern Shawnee Tribe of Oklahoma ML24221A1862024-08-0808 August 2024 Tribal Section 106 Letters-North Anna - Eastern Band of Cherokee Indians ML24221A1902024-08-0808 August 2024 Tribal Section 106 Letters-North Anna - Pamunkey Indian Tribe ML24221A1812024-08-0808 August 2024 Tribal Section 106 Letters-North Anna - Catawba Indian Nation ML24221A1822024-08-0808 August 2024 Tribal Section 106 Letters - North Anna - Chickahominy Indian Tribe ML24221A1892024-08-0808 August 2024 Tribal Section 106 Letters-North Anna - Nansemond Indian Nation ML24241A0692024-08-0606 August 2024 ISFSI, Submittal of Cask Registration for Spent Fuel Storage IR 05000338/20240022024-08-0202 August 2024 Integrated Inspection Report 05000338/2024002 and 05000339/2024002 ML24206A0432024-07-26026 July 2024 Feis - Letter to the Applicant 05000338/LER-2024-001, Automatic Reactor Trip Due to Prni High Negative Rate2024-07-25025 July 2024 Automatic Reactor Trip Due to Prni High Negative Rate ML24206A0902024-07-24024 July 2024 Owners Activity Report ML24178A2422024-06-25025 June 2024 2023 Annual Report of Emergency Core Cooling System (ECCS) Model, Changes Pursuant to the Requirements of 10 CFR 50.46 ML24177A2792024-06-20020 June 2024 Preparation and Scheduling of Operator Licensing Examinations ML24143A1622024-06-12012 June 2024 – Correction to Issuance of Amendment Nos. 297 and 280 and Surry Units 1 and 2, Correction to Issuance of Amendment Nos. 317 and 317, to Change Emergency Plan Staff Augmentation Times ML24170B0532024-06-10010 June 2024 DOM-NAF-2-P/NP-A, Revision 0.5, Reactor Core Thermal-Hydraulics Using the VIPRE-D Computer Code 05000339/LER-2024-001, Loss of Generator Field for 2J EDG During 2-PT-82.282024-06-0505 June 2024 Loss of Generator Field for 2J EDG During 2-PT-82.28 ML24165A1462024-06-0505 June 2024 Loss of Generator Field for 2J EDG During 2-PT-82.28 IR 05000338/20240102024-05-24024 May 2024 NRC Fire Protection Team Inspection (FPTI) Report 05000338/2024010 and 05000339/2024010 IR 05000338/20240012024-05-10010 May 2024 Integrated Inspection Report 05000338/2024001 and 05000339/2024001 IR 05000338/20244032024-04-30030 April 2024 – Security Baseline Inspection Report 05000338-2024403 and 05000339-2024403 ML24054A0142024-04-22022 April 2024 Issuance of Amendment Nos. 297 and 280, and Surry Power Station Unit Nos. 1 and 2, Issuance of Amendment Nos. 317 and 317, to Change Emergency Plan Staff Augmentation Times ML24110A1462024-04-18018 April 2024 Independent Spent Fuel Storage Installation (Sfsi) - Annual Radiological Environmental Operating Report ML24110A1502024-04-18018 April 2024 Independent Spent Fuel Storage Installation (ISFSI) - Annual Radioactive Effluent Release Report ML24110A1392024-04-18018 April 2024 Annual Environmental Operating Report ML24087A0572024-04-16016 April 2024 Correction to Issuance of Amendment Nos. 296 and 279 ML24088A2692024-03-27027 March 2024 Core Operating Limits Report Cycle 31 Pattern Sos Revision 0 ML24086A4292024-03-25025 March 2024 Response to Request for Additional Information Associated with Alternative Request N1-I5-NDE-007 Request to Deter Additional Required Reactor Coolant Pump Casing Inspection 2024-09-24
[Table view] |
Text
Diaz, Jose To: robert.page@dominionenergy.com Cc: Rivera, Jonathan; William Pursley
Subject:
NAPS RP Inspection August 2021 Attachments: 2021003 North Anna Nuclear Power Station Document Request Letter.pdf Importance: High
- Bob, As discussed over the phone call today, here is the promised document request letter. Thanks for your support. Feel free to call me at 404-997-4736 or e-mail me at jose.diaz@nrc.gov if you have any questions.
Respectfully, José José M. Díaz Vélez, Sr. Health Physicist Division of Reactor Safety Engineering Branch 3 Jose.diaz@nrc.gov 4049974736 U. S. Nuclear Regulatory Commission Region II Office Marquis One Tower 245 Peachtree Center Avenue, NE Suite 1200 Atlanta, Georgia 303031257 1
ML21145A005 North Anna Power Stations Units 1 and 2 Radiation Safety Baseline Inspection Initial Information Request Inspection Reports: 05000338/2021003 and 05000339/2021003 During the week of August 2nd - 6th, 2021, the U.S. Nuclear Regulatory Commission (NRC) will perform a baseline Radiation Safety Inspection at the North Anna Nuclear Plant (NRC Inspection Procedures 71124.02, 71124.06, 71124.07 and 71151).
To minimize the impact to your onsite resources during the inspection and ensure the inspectors have the necessary information to complete the inspection while on site, we have enclosed a request for documents needed for this activity. The NRC requests that these documents be provided to the inspectors no later than July 12, 2021.
If there are any questions about this inspection or the material requested, please contact the lead inspector, Jose M. Diaz-Velez at 404-997-4736, or the Engineering Branch 3 Chief, Binoy Desai at 404-997-4519.
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, Public inspections, exemptions, requests for withholding: a copy of this document will be available electronically for public inspection in the NRC Public Document Room, or from the Publicly Available Records component of NRC's Agencywide Documents Access and Management System (ADAMS); accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html.
PAPERWORK REDUCTION ACT STATEMENT This document does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection requirements were approved by the Office of Management and Budget under control numbers 3150-0008, 3150-0011, 3150-0014, 3150-0044, and 3150-0135.
PUBLIC PROTECTION NOTIFICATION The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection requirement, unless the requesting document displays a currently valid Office of Management and Budget control number.
Document Request List Occupational and Public Radiation Safety Cornerstones Licensee: North Anna Power Station Units 1 and 2 NAPS Licensing
Contact:
Robert Page (540) 894-2575) robert.page@dominionenergy.com Docket Number: 05000338 and 05000339 Inspection Dates: August 2nd -6th, 2021 Documents Due to Region II by: July 12, 2021 NRC Inspection Procedures (IPs):
71124.02 Occupational ALARA Planning and Controls 71124.06 Radioactive Gaseous and Liquid Effluent Treatment 71124.07 Radiological Environmental Monitoring Program 71151 Performance Indicator Verification Note: Please provide the current version of these documents in an electronic format if possible (The preferred file format is MSWord, or searchable .pdf files). To the extent possible, please organize the information in directories as requested below and if possible, use a descriptive name for the files provided. Recent experience has demonstrated the most efficient method to transfer this information to the NRC is via Certrec. It is best to upload all the requested information in one large zip file. If there are questions regarding the documents requested, or method of transfer, please do not hesitate to contact the lead inspector.
Documentation for inspection procedures 71124.02, should be from April 4, 2018.
Documentation for inspection procedures 711124.06, 71124.07, and 71151 should be from August 9, 2019. These dates are approximate to the last time these inspections were conducted. Also, provide only a listing and title for NCRs requested for each inspection procedure and inspectors will select a sample from these for in-depth review during the inspection.
If you have any questions, please call José M. Díaz-Vélez at (404) 997-4517. Thank you in advance for your effort in putting together this material.
General and Miscellaneous Information List of primary site contact(s) for each inspection area including name(s), e-mail and telephone numbers.
Corrective Action Program procedures.
Plant Management and Radiation Protection organizational charts w/ contact numbers.
Internal and external assessments and audits of the RP program since September 2019.
(excluding INPO).
71124.02 - Occupational ALARA Planning and Controls (Last Inspected April 4, 2018)
- 1. Site and/or corporate ALARA Program and all associated procedures for maintaining dose ALARA including permanent and temporary shielding processes.
- 2. 2020, 2021-YTD ALARA Committee meeting minutes with attendance rosters.
- 3. 2019 & 2020 (if available) annual ALARA reports.
- 4. Completed ALARA packages for the last outage for five work activities that had the greatest collective dose, and/or presented significant radiological risk.
- 5. ALARA goals for 2021.
- 6. Plant source term reduction strategy and results achieved since April 4, 2018.
- 7. Self-assessment or audits of the ALARA Program performed since April 4, 2018.
- 8. List of CAP report numbers and brief descriptions generated since April 4, 2018 related to the ALARA program.
71124.06 - Radioactive Gaseous and Liquid Effluent Treatment (Last Inspected August 9, 2019)
- 1. Copy of Offsite Dose Calculation Manual (ODCM) including a list of changes made in the latest revision.
- 2. Latest Land Use Census and any changes since August 9, 2019.
- 3. Procedures for gaseous and liquid effluents to include collection, analysis, release, alarm setpoints, dose evaluations, and QC for counting instrumentation
- 4. List of changes made to radioactive effluent processing/discharge systems since August 9, 2019.
- 5. List of out of service (OOS) effluent monitors >30 days and duration since August 9, 2019.
- 6. The last two calibration records for the following effluent monitors:
- a. 1-GW-RM-178-1 (Process Vent Particulate, Process Vent Gas)
- b. 1/2-RM-RMS-159/259 (Containment Particulate)
- c. 1/2-RM-RMS-160/260 (Containment Gas)
- d. 1-LW-RM-110,111 (Liquid Waste Disposal)
- e. 1-SW-RM-108 (Service-water discharge to tunnel)
- 7. Documentation for the radioactive sources used to calibrate the instruments in the item above
- 8. The last two surveillances (in-place filter tests and charcoal tests) performed on the Plant Vent Exhaust Filtration System
- 9. Emergency Operating Procedures associated with EALs that rely on radiation monitoring readouts for emergency classifications or protective action recommendations.
- 10. The last two gaseous effluent release permits and liquid effluent release permits
- 11. List of all unmonitored spills, leaks, or unexpected liquid/gaseous discharges since August 9, 2019.
- 12. The last two Inter-laboratory comparison program results (for onsite count lab)
- 13. Most recent 10 CFR 61 analyses that include hard-to-detect radionuclides.
- 14. Most recent audit, self-assessment, and/or review of the radioactive effluent monitoring program
- 15. List of CRs generated since August 9, 2019, because of gaseous and liquid effluent processing and/or ODCM related activities. This should be a list of corrective action documents containing a CR number and brief description, not full CRs
71124.07 - Radiological Environmental Monitoring Program (Last Inspected August 9, 2019)
- 1. Procedures for radiological environmental monitoring including but not limited to:
- 2. Collection, preparation and analysis of all environmental samples
- 3. Calibration and maintenance of REMP air and/or water samplers
- 4. Calibration of meteorological monitoring instruments
- 5. Periodic meteorological instrumentation surveillance requirements
- 6. Land use census
- 7. Calibration and quality control of for sample counting instruments
- 8. Procedures associated with NEI/industry groundwater protection initiative
- 9. Collection schedule for REMP samples during the week of inspection and contact information for collection staff.
- 10. Last two calibration records for REMP air and water sampling equipment
- 11. Last two calibration records for meteorological monitoring instrumentation on the primary tower (wind speed & direction, and air temperature)
- 12. Data recovery report for meteorological monitoring instruments since August 9, 2019
- 13. Most recent inter-laboratory comparison program results
- 14. List of systems, structures and components identified as credible mechanisms for the potential release of licensed material to the groundwater (e.g. SSC risk ranking matrix)
- 15. List of any non-radioactive system that has become contaminated since August 9, 2019
- 16. Summary of any leaks and/or spills that have occurred since August 9, 2019 (a copy of 10.75g file)
- 17. Copies of any reports to the NRC regarding abnormal onsite spills/leaks or radioactive material since August 9, 2019
- 18. Groundwater monitoring results since August 9, 2019
- 19. Environmental TLD results since August 9, 2019
- 20. List of onsite surface water bodies (e.g. ponds, retention basins, lakes) that contain or can potentially contain radioactivity
- 21. Most recent audit/self-assessments of REMP activities including vendor activities
- 22. List of all CAP documents related to REMP activities or groundwater, including leaks or spills since August 9, 2019 71151 - Performance Indicator (PI) Verification (Public)
(Last Inspected August 9, 2019)
- 1. Site procedures/manuals for gathering and reporting PI data.
- 2. Monthly/Quarterly PI reports filed since August 9, 2019, and copies of associated corrective action reports for any RETS/ODCM Radiological Effluent occurrences.
- 3. List of condition reports (e.g. NCRs, CRs, ARs etc.) generated since August 2019, using keywords abnormal/ unmonitored effluent release, etc.