Forwards Copy of Evaluation & Reply Requested by
ML20211J112
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 09/23/1997
From: Dante Johnson
WISCONSIN ELECTRIC POWER CO.
To: Grobe J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
NUDOCS 9710070388
Download: ML20211J112 (1)


Text

.

  • f C.

Wisconsin Electnc POMR COMPANY Point Booch Nuclear hont (920) 755 2321 MID Nuclear Rd , two Rtvers. WI 54241

,_ Pin n i fi hi st l l N()

I .f Ut 10:0nj September 23,1997 h!2_ . HC DHi .

< lc gu .p l VDnt I m,,

V!b h14d_ _

Nir. John A. Grobe, Acting Director I" D IM Division of Reactor Safety DMA , _ .

U. S. NUCLEAR REGULATORY C0hihilSSION -

c_ . .

801 Warrenville Road FILE did2c,_

Lisle, il 60532 4351

Dear hir. Grobe:

RESUBhilTTAI OF IESPONSE TO REOUEST FOR INFORNI ATION POINT llE ACil NUCI FAR Pl. ANT On Friday, September 19,1997, we were informed by a representative of the Region 111 Division of Reactor Safety, Plant Support Branch, that you had not received our reply to your request for information dated August 7,1997.

In accordance with the request received from your representative to our security supervisor, we are enclosing a copy of the Wisconsin Electric evaluation and reply that was requested by your August 7,1997, letter.

Sincerely q@G, .4 V W Douglas F. Johnson hianager, )

Regulatory Services & Licensing Enclosure 9710070388 970923 PDR ADOCK 05000266 P PDR

.- e lllllIf I!!!.IH!I.llHi.llil!l.li o< v .

A .sub4/an W HiRW1.W! EMA'1 0V) Wit /MVI

.4 Wisconsin Electnc POWER COMPAN Y Pont Beach NucWat Plant (?20) 755-232) 661o Nucleaf Rd . Two Rivert WI 544]

September 5,1997 Mr. John A. Grobe Acting Director, Division of Reactor Safety U.S. NUCLEAR REGULATORY COMMISSION 801 Wanenville Road Lisle, Illinois 60532 4351

Dear Mr. Grobe:

RESPONSE TO REOUEST FOR INFORMATION E.OINT BFfLCH NUCLEAR PL ANT On A'ugust 7,1997, U.S. Nuclear Regulatory Commission, Region !!I, forwarded a request for information concerning certain activities at Point Beach Nuclear Plant. You requested that Wisconsin Electric evaluate and respond to the rnatter on, or before, September 7, 1997.

The Attachment to this letter contains our response. Please contact us if you have any questions or desire additional information.

Sincerely,

h. /t, d 5 S. A. Patuiski Site Vice President

.* ttachment e OU i h5 ' $YANl$ N YfD 5

Attachment 1 Evaluation of Potential Falsification of Resumes by Nuclear Power Technical Services, Inc.

Itackgtmtmi On February 23,1997, a Condition Report was written calling into question the qualifications of an employee of Nucle:u Power Technical Services, Inc. (NPTS). During an infonnal discussion, the employee, a contract classroom instructor at Point Beach, had provided information concerning his previous experience which appeared to differ from that provided by his employer, NPTS. Specifically, the instructor noted that he was not a classroom instructor at the Paducah Gaseous Diffusion Plant and was not experienced in developing training material utilizing INPO good practices, although his resume listed this experience. Evaluation of this Condition Report, by Wisconsin Electric (WE) personnel, 4 concluded that the problem was caused by a clerical error by NPTS home office personnel when process:ng updates to files. Therefore, WE concluded this incident was not intentional.

In audition, during hiarch 24 to 26,1997, a WE Quality Assurance Auditor performed an assessment (Work Monitoring Report) of the m; curacy of a total of 14 resumes of onsite NPTS employees (or 25% of onsite NPTS erttpges at the time). The auditor asked each individual to review his or her resume to determine its accuracy. Three discrepancies were found. These items were corrected and did not affect any of the individual's qualifications for the position filled.

As a result of this incident, NPTS now sends a copy of the individual's resume to each employee for verification prior to sending it to Wisconsin Electric. In addition, the individual reviews and initials the resume upon arrival at Point Beach, verifying its accuracy. In any event, resumes are not used as part of the Point Beach access authorization process.

Recent Actiona

! After Mr. T. J. hiadeda's inquiry in July,1997, our security staff reviewed the access l authorization files for all NPTS employees who have been or are cueently badged for unescorted access at Point Beach. No evidence of falsification ofinformation was found in any of those files.

Upon receipt of the August 7,1997, letter from Mr. J. A. Grobe, Mr. S. A. Patuiski requested that another evaluation be conducted by individuals from the QA and Corporate Security Departments. The evaluation included an independent investigation by a Senior Security Consultant and another QA assessment of the accuracy of recently hired NPTS employees' resumes.

I Page1 L J

The security consultant conducted a second investigation of the original incident. This investigation disclosed no evidence that NPTS intentionally attempted to deceive Wisconsin Electric. The investigator also concluded that the explanation of the circumstances that led to the error were plausible and not contradicted by any statements or documents.

The auditor assessed the accuracy of the resumes for 20 of the 38 NPTS employees i assigned at Point Beach since the last assessment was completed on March 26,1997. As  !

previously done, the auditor asked each NPTS employee to review the resume supplied by NPTS to determine its accuracy. No discrepancies were identified.

Simuttm Wisconsin Electric performed investigations in March 1997 and August 1997 to determine 1 whether a resume provided by NPTS was intentionally falsified. Following both l investigations, we concluded that the incident was not intentional.

The corrective actions included changes to the processing of resumes within NPTS to ensure each individual reviews his or her resume after processing onto NPTS letterhead to verify its accuracy and resume verification upon arrival at Point Beach.

No additional resume problems have been encountered with NPTS since the original problems discussed above.

f Page 2