ML20214R857

From kanterella
Revision as of 12:00, 4 May 2021 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

Requests Fr Publication of Notice of Consideration of Issuance of Amend to License DPR-40 & Proposed NSHC Determination & Opportunity for Hearing on 861105 Request to Incorporate Revs to Surveillance for Steam Generator Insp
ML20214R857
Person / Time
Site: Fort Calhoun Omaha Public Power District icon.png
Issue date: 11/28/1986
From: Thadani A
Office of Nuclear Reactor Regulation
To:
NRC
References
TAC-63437, NUDOCS 8612080114
Download: ML20214R857 (3)


Text

s

+ 6 Novemb r 28, 1986 MEMORANDUM FOR: Sholly Coordinator Distribution 6 Docket F,11e "PKreutzer FROM: Ashok C. Thadani, Director 'NRC/L'oial'PDR'~DSells PWR Project Directorate #8 OGC-Bethesda Sholly File Division of PWR Licensing-B Sholly Coord.

SUBJECT:

REQUEST FOR PUBLICATION IN BIWEEKLY FR NOTICE - NOTICE OF CONSIDERATION OF ISSUANCE OF AMENDMENT TO FACILITY OPERATING LICENSE AND PROPOSED NO SIGNIFICANT HAZARDS CONSIDERATION DETERMINATION AND OPPORTUNITY FOR HEARING Omaha Public Power District, Docket No. 50-285, Fort Calhoun Station, Unit No. 1, Washington County, Nebraska Date of amendment request: November 5, 1986 Description of amendment request: The amendment would change Section 3 of the Technical Specifications to incorporate revisions to the surveillance criteria for the steam generator tube inspections. The change would remove Section 3.3(2) and Table 3-8 from Section 3.3 and put them into a new section, Section 3.17. The change would correct the criteria for Sample Selection and Inspection Results from fixed numerical criteria to comparable percentages. This would acommodate steam generator tube inspection where the sample size has been increased from the minimum size required by the Technical Specification and regulatory commitments.

Basis for proposed no significant hazards consideration determination: The

staff has completed its preliminary review of the proposed changes and
oncluded that the changes meet the criteria of 10 CFR 50.92. A discussion of the criteria follows

(i) Involve any significant increase in the probability or consequences of an accident-previously evaluated.

~

8612030114 861128 PDR ADOCK 05000285 G PDR  ;

i

. \

-2 The change affects the organization of the Technical Specifications and not the contents of the sections involved. It would affect those inspections where the sample size exceeds the minimum size used as a basis for the previous evaluation increasing the reliability of the inspection results.

This will not affect any of the sssumptions or conditions that were used in the analyses used for licensing the plant. Therefore, there will be no significant increase in the probability or consequences of accidents previously evaluated.

(ii) Create the possibility of a new or different kind of accident from any accident previously evaluated.

Since this change does not change the surveillance requirements and will not affect the assumptions or operating conditions in the plant, no new path is created that could lead to a new or different kind of accident from any previously evaluated.

(iii) Involve any reduction in the margin of safety.

The main purpose of this change is to remove the steam generator tube inspection requirements from Section 3.3 to a new section, Section 3.17, that is dedicated specifically to steam generator tube inspection. This does not change the surveillance requirements. For the larger sample sizes addressed in the change, the inspection reliability is greater. Since this, I along with the fact that assumptions and operating conditions used in the analysis of the plant are not affected, the margin of safety will not be affected in a positive or negative manner.

. \

In addition, the Commission has provided guidance concerning the application of the standards for determining whether a significant hazards consideration exists by providing certain examples (51 FR 7751) of amendments that are considered not likely to involve significant hazards considerations. Example (i) relates to a change which is administrative in nature, intended to achieve consistency or a change in nomenclature. The proposed change is representative of Example (i) in that it moves the steam generator tube inspection requirements from Section 3.3 to a new section, Section 3.17.

Based on the above, the Commission proposes to determine that the proposed amendment involves no significant hazards considerations.

Local Public Document Room location: W. Dale Clark Library, 215 South 15th Street, Omaha, Nebraska 68102 Attorney for licensee: LeBoeuf, Lamb, Leiby, and MacRae, 1333 New Hampshire Avenue, N.W., Washington, D.C. 20036 NRC Project Director: Ashok C. Thadani

/s/

Ashok C. Thadani, Director PWR Project Directorate #8 Division of PWR Licensing-B PBD-8:

PB . PBD-8:

P zer DSells:jch- AThadani 11 86 11//ff86 11/18/86 7 - y e a,-e.= =4:n e A te 1+e-