ML17266A269

From kanterella
Revision as of 06:38, 24 February 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
LER 80-047/03L-0: on 800828,During Full Power Operation, After 1B Charging Pump Maint,Seal Water Leak Developed.Pump 1A Was Started But Seal Water Pump Mechanically Seized. Caused by 1A Overheating.1A & 1B Repaired & Returned to Svc
ML17266A269
Person / Time
Site: Saint Lucie NextEra Energy icon.png
Issue date: 09/24/1980
Revision: 0
From: PACE P L
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML17209A202 List:
References
LER-80-047-03L, LER-80-47-3L, NUDOCS 8010080217
Download: ML17266A269 (1)