ML17209A202

From kanterella
Jump to navigation Jump to search
Forwards LER 80-047/03L-0
Date released: 01/25/2018 Download: ML17209A202


LER 80-047/03L-0: on 800828,during Full Power Operation, After 1B Charging Pump Maint,Seal Water Leak Developed.Pump 1A Was Started But Seal Water Pump Mechanically Seized. Caused by 1A overheating.1A & 1B Repaired & Returned to Svc
ML17266A269
Person / Time
Site: Saint Lucie NextEra Energy icon.png
Issue date: 09/24/1980
From: Pace P
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML17266A269 (1)
Forwards LER 80-047/03L-0
ML17209A201
Person / Time
Site: Saint Lucie NextEra Energy icon.png
Issue date: 09/24/1980
From: Schmidt A
FLORIDA POWER & LIGHT CO.
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML17209A201 (2)