ML17266A358

From kanterella
Revision as of 06:34, 24 February 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
LER 80-060/03L-0:on 800929,Design Review of Unit 2 Determined Tie Line Between Condensate Storage Tank & Unit 1 Auxiliary Feedwater Did Not Meet Intent of Design.Caused by Design Error.Tie Line to Be Modified
ML17266A358
Person / Time
Site: Saint Lucie NextEra Energy icon.png
Issue date: 10/29/1980
Revision: 0
From: PACE P L
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML17209A301 List:
References
LER-80-060-03L, LER-80-60-3L, NUDOCS 8011040492
Download: ML17266A358 (1)