Submits Ltr to Update Commitment Made by Oconee in Response to Subject Violation.Update Assures That Details of Particular CA Are Appropriately Contained in Docketed Correspondence
ML20217G035
Person / Time
Site: Oconee  Duke Energy icon.png
Issue date: 03/26/1998
From: Mccollum W
DUKE POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9804020167
Download: ML20217G035 (2)


Text

. 4 Duke  ??2?::Q""Y

, s .-

I= Oconee Nudear Fae

l. N '-V P.O. Box 1439 Seneca, SC 29679 W. R. McCollum, Jr. (864) 885-3107 omCE We hnident IB64) 885'3564 m March 26, 1998 U.S. Nuclear Regulatory Commission Document Co. 'l Desk

. Washington, se 20555

Subject:

Oconee Nuclear Station Docket Nos. 50-269, -270, -287 Reply to Notice of Violation and Proposed Imposition of Civil Penalty On September 25, 1997, Duke Energy (Duke) submitted a reply to Violation D, concerning a failure to assure that the design basis for the valves in the Unit 1, 2, and 3 LDST instrument lines were correctly translated into station procedures. This letter is being submitted to update a commitment made by Oconee in response to the subject violation.

In the reply, Duke proposed a corrective action to develop valve checklists for critical applications of instrument valves where mispositioning would not be readily apparent or positively controlled through other means. This item was also discussed at the predecisional enforcement conference on July 23, 1997, with the plan to complete the valve checklist by March 31, 1998.

While the specific corrective action is not complete, the work accomplished to improve the total valve control program is a major accomplishment toward the in~ent. c A solid configuration control program coupled with a set of audit procedures for components which are not self-revealing should provide adequate means to preclude future occurrences. The identification of instrument valves where mispositioning would'not be readily apparent will be completed by June 30, 1998, and audit procedures will be developed by August 31, 1998.

This update assures that the details of this particular

_ corrective action are appropriately contained in the docketed correspondence. Please address any questions to Judy Smith at (864) 885-4309. .1 9804020167 980326 /

PDR ADOCK 05000269 G PDR /

....tu NRC Document Control., Desk March-26,~1998 M ,,:, :Page;2 f.

.g ! .1

-Very truly yours,

. 9 ..

  • /,

W. R. McCollum, Jr.

Site Vice-President

.xOconee' Nuclear Station cc i -' Mr.<L. A. Reyes, Regional Administrator

.U. S. Nuclear' Regulatory. Commission, Region II

'Mr. D. E..LaBarge, Project Manager

-Office.of Nuclear Reactor Regulation Mr. M.'A..' Scott Senior Resident Inspector Oconee Nuclear Site I-4 h

I .i.

?  ; .t .

p

. . . .