MONTHYEARML20138G7291996-12-0303 December 1996 Summary of 961203 Meeting W/Psc in Plattville Co Re Decommissioning & License Termination of Fsv.Slides,Encl ML20137H2471995-04-12012 April 1995 Summary of 950405-06 Meeting W/Utility at Fort St Vrain Re Stier,Anderson & Malone Rept.Attendees Listed ML20128G1851993-01-29029 January 1993 Summary of 930128 Meeting W/Psc in Rockville,Md Re Briefing of NRC Staff on Status of Fsv Decommissioning Activities. Meeting Agenda & Summary of PSCs Briefing Encl ML20055J3931990-07-31031 July 1990 Summary of 900725 Meeting W/Util in Rockville,Md Re Defueling & Decommissioning of Facility.Attendees List Encl ML20246D9231989-08-18018 August 1989 Summary of 890718 Meeting W/Util to Discuss Defueling of Plant.List of Attendees,Agenda & Viewgraphs Encl ML20236C9921989-03-13013 March 1989 Summary of 890307 Meeting W/Util & Ga Technologies Re Plant Coastdown & Defueling.Attendance List,Agenda & Viewgraphs Encl ML20195D5591988-10-26026 October 1988 Summary of 881013 & 14 Meeting W/Util to Discuss Potential Decommissioning of Facility.W/O Stated Encl ML20154E4031988-09-0909 September 1988 Summary of 880831 Meeting W/Util Re Fire Protection Issues at Plant.Meeting Attendees Encl ML20151K6901988-07-18018 July 1988 Summary of Operating Reactors Events Meeting 88-28 on 880712.Viewgraphs & List of Attendees Encl ML20151K7361988-04-15015 April 1988 Summary of Operating Reactors Events Meeting 88-15 on 880412.List of Attendees & Viewgraphs Encl ML20153A8551988-03-0909 March 1988 Summary of 880304 Meeting W/Util to Discuss 880122 Submittal Re Helium Circulator Failure & Recovery.Attendee List & Viewgraphs Encl ML20149L4981988-02-12012 February 1988 Summary of 871207 Meeting W/Utils in Bethesda,Md Re Licensees Revised Proposal to Comply W/Nrc Requirement for Simulation Facilities Under 10CFR55.45(b).List of Attendees & Util Simulation Facility Group Guideline Encl ML20147D8901988-01-12012 January 1988 Summary of 881202-03 Meeting W/Util,Inel & ORNL Re Status of Tech Spec Upgrade Program.Meeting Attendees & Listed Ref Encl ML20237D6921987-12-15015 December 1987 Summary of 871203 Meeting W/Util & Inel Re Protective Sys Setpoints in Tech Specs.List of Meeting Attendees Encl ML20237D2251987-12-15015 December 1987 Summary of 871204 Meeting W/Util Re Licensee Latest Proposals for Licensing Actions Concerning CRD Mechanism Temp Requalification & Position Instrumentation.List of Attendees & Related Info Encl ML20236B9121987-10-20020 October 1987 Summary of 871002 Meeting W/Util Re Specific Aspects of Util Approach to Conform w/10CFR55 for Facility.List of Attendees & Util Presentation Matl Encl ML20236A9731987-10-13013 October 1987 Summary of 870915-16 Meetings W/Four Facility Licensees in Bethesda,Md Re Proposal to Apply for NRC Approval for Simulation Facilities.Viewgraphs & Related Documents Encl ML20235Z5891987-10-0808 October 1987 Summary of 871006 Operating Reactor Events Meeting 87-34 Re Events Occurring Since 870929 Meeting.List of Attendees & Presentation Matl Encl ML20235H4401987-09-21021 September 1987 Summary of 870911 Meeting W/Util in Arlington,Tx Re Failure of Plant Circulator S/N C-2101 & Licensee Program to Recover from Failure.Licensee Rept, Preliminary Rept of Helium Circulator S/N C-2101 Damage & Justification... Encl ML20207S6271987-03-12012 March 1987 Summary of 870210 Meeting W/Util Re Emergency Diesel Generator Electrical Independence.List of Attendees Encl ML20210P0191987-02-0505 February 1987 Summary of 870113 Meeting W/Util Re Completion of Equipment Qualification Program & Program & Approvals Required for Plant Restart ML20212D8641986-12-24024 December 1986 Summary of 861209 Meeting W/Util Re Plant Emergency Electrical Power Sys.Fsar Commitment Re Emergency Diesel Generators revised.Marked-up Draft Rept Re Ac Standby Power Sys Encl ML20207B9781986-12-15015 December 1986 Summary of 861027-30 Meetings W/Util,Eg&G Idaho,Inc & ORNL at Site Re Tech Spec Upgrade Program.List of Attendees & NRC Comment Resolution Encl ML20214U7071986-12-0202 December 1986 Summary of 861120 Meeting W/Util,Ornl,Ga Technologies & Eg&G Re Temp Profiles for Equipment Qualification.List of Attendees & Viewgraphs Encl ML20214P8511986-11-25025 November 1986 Summary of 861105 Meeting W/Lasl Re Technical Evaluation Rept on Prestressed Concrete Reactor Vessel Tendons.Staff Requires Determination Re Listed Items.List of Attendees Encl ML20214Q0951986-11-25025 November 1986 Summary of 861027 Meeting W/Util to Discuss Schedule for Ie/Nrr Insp of Equipment Qualification Program.Attendance List & Viewgraphs Encl ML20197B8651986-10-28028 October 1986 Summary of 861001-02 Meetings W/Util,Inel & ORNL Re Staff Comments on Plant Tech Spec Upgrade Program.Nrc Comments Not Intended to Require Plant Mod or Changes to Licensing Basis of Plant ML20215L2101986-09-12012 September 1986 Summary of ACRS Subcommittee on Gas-Cooled Reactor Plants 860626 Public Meeting W/Nrc & Util in Washington,Dc Re Bases Used to Impose Requirements on Facility & Possibility of Severe Accidents.Attendance List & Viewgraphs Encl ML20215L2001986-09-12012 September 1986 Summary of ACRS Subcommittee on Fort St Vrain 860402 Public Meeting W/Nrc & Util at Facility Re Technical Problems Addressed During Recent Extended Outage & Mgt Charges. Attendance List & Viewgraphs Encl ML20206P5971986-08-15015 August 1986 Summary of 860724 Meeting W/Util,Inel,Wyle Labs,Sargent & Lundy & Tenera in Bethesda,Md Re Util Draft Documentation to Justify Qualification of safety-related Cabling at Plant. List of Attendees Encl ML20211Q6161986-07-23023 July 1986 Summary of Operating Reactor Events Meeting 86-25 on 860721 Re Events Since 860714 Meeting.List of Attendees,Discussion of Events & Status of Assignments Encl.Response Requested for Incomplete Assignments ML20207H0281986-07-21021 July 1986 Summary of 860627 Meeting W/Util Re Status of Tech Spec Upgrade Program.List of Attendees Encl ML20207H1211986-07-18018 July 1986 Trip Rept of 860625-27 Site Visit to Review QA Program, Observe Equipment Qualification Mods & Obtain Unescorted Access Status ML20203B6181986-07-15015 July 1986 Summary of 860613 Meeting W/Util in Bethesda,Md Re Status of Plant Equipment Qualification Program.List of Attendees, Environ Qualification of Plant Safe Shutdown Cable & Cable Qualification Binders Encl ML20199K4911986-06-27027 June 1986 Summary of 860604 Meeting W/Util Re Status of Licensing Actions.List of Attendees,Summary of NRC Responses to Actions & Summary of Actions Encl ML20205S2341986-06-0101 June 1986 Summary of 860502 Meeting W/Util & Inel in Bethesda,Md Re Equipment Qualification Program Problem Areas.Attendees List & Supporting Documentation Encl ML20198H4561986-05-27027 May 1986 Summary of 860505 Meeting W/Util Re Status of Equipment Qualification Program.Considerable Work Remains Before Approval of Full Power Operation Can Be Granted.Staff Recommended Util Continue to Complete Program ML20197F1691986-05-0808 May 1986 Summary of Operating Reactors Events 860428 Meeting W/Listed Divs Re Chernobyl Nuclear Accident & Events at Us Reactors ML20197F6541986-05-0707 May 1986 Summary of 860423-24 Meetings W/Util,Ga Technologies & S&W at Site Re Fuel Block Cracking,Bldg 10 Const,Seismic Instrumentation,Pcrv Tendons & Integrated Leak Rate Testing. Attendance List & Viewgraphs Encl ML20203E8051986-04-18018 April 1986 Summary of Operating Reactors Events Meeting 86-12 on 860414 Re Events Since 860407.List of Attendees,Viewgraphs & Supporting Documentation Encl ML20205J9221986-04-18018 April 1986 Summary of ACRS 312th Meeting on 860410-12 in Washington,Dc Re Proposed NRC Safety Goal Policy Statement & Need for Guidance in Environ & PRA for Quantification of Public Health Risks to Nearby Populations ML20205S2591986-04-10010 April 1986 Summary of 860326 Site Meeting W/Util,Dibenedetto Assoc,Inc, Sandia & Sargent & Lundy Re Status of Qualifications of 10CFR50.49 Cables & Maint Records History Review.Viewgraphs & Attendees List Encl ML20141B7451986-03-28028 March 1986 Summary of 860313 Meeting W/Util in Arlington,Tx Re Tech Spec Limiting Condition for Operation 4.1.9 Covering Frequency of Manipulation of Reactor Controls.Supporting Documentation Encl ML20142A0661986-03-14014 March 1986 Summary of 860116 Meeting W/Util,Training Co,Inc & SM Stoller Corp Re Performance Enhancement Program. Viewgraphs Encl ML20141P1771986-03-14014 March 1986 Summary of 860130 Meeting W/Util,Inel,Tenera & Sargent & Lundy Re Equipment Qualification (EQ) Program.List of Attendees,Test Profiles & Review of Sample EQ Package Encl ML20142A0441986-03-12012 March 1986 Summary of 860221 Onsite Meeting W/Util,Inel,D Benedetto Assoc,S&W,Tenera,Ned & NPD Re Equipment Qualification Program & Steam Line Rupture Detection & Isolation Sys ML20138R7331985-10-31031 October 1985 Summary of 851029 Meeting W/Util & ORNL Re Schedule Extension to Equipment Qualification Rule.List of Attendees, Agenda & Matls Presented by Util Encl ML20138P0081985-10-21021 October 1985 Summary of Operating Reactors Events Meeting 85-19 on 851007 W/Ofc Directors,Div Directors & Representatives on Events Which Occurred Since Last Meeting on 851007 ML20134F3081985-08-15015 August 1985 Summary of 850722-26 Meetings W/Util & Ga Technologies Re Tech Spec Upgrade.List of Attendees Encl ML20129E6721985-05-28028 May 1985 Summary of 850803 Meeting W/Util & Ga Technologies Re CRD Mechanism Tech Spec Problem.List of Attendees Encl 1996-12-03
[Table view] Category:MEETING SUMMARIES-INTERNAL (NON-TRANSCRIPT)
MONTHYEARML20138G7291996-12-0303 December 1996 Summary of 961203 Meeting W/Psc in Plattville Co Re Decommissioning & License Termination of Fsv.Slides,Encl ML20137H2471995-04-12012 April 1995 Summary of 950405-06 Meeting W/Utility at Fort St Vrain Re Stier,Anderson & Malone Rept.Attendees Listed ML20128G1851993-01-29029 January 1993 Summary of 930128 Meeting W/Psc in Rockville,Md Re Briefing of NRC Staff on Status of Fsv Decommissioning Activities. Meeting Agenda & Summary of PSCs Briefing Encl ML20055J3931990-07-31031 July 1990 Summary of 900725 Meeting W/Util in Rockville,Md Re Defueling & Decommissioning of Facility.Attendees List Encl ML20246D9231989-08-18018 August 1989 Summary of 890718 Meeting W/Util to Discuss Defueling of Plant.List of Attendees,Agenda & Viewgraphs Encl ML20236C9921989-03-13013 March 1989 Summary of 890307 Meeting W/Util & Ga Technologies Re Plant Coastdown & Defueling.Attendance List,Agenda & Viewgraphs Encl ML20195D5591988-10-26026 October 1988 Summary of 881013 & 14 Meeting W/Util to Discuss Potential Decommissioning of Facility.W/O Stated Encl ML20154E4031988-09-0909 September 1988 Summary of 880831 Meeting W/Util Re Fire Protection Issues at Plant.Meeting Attendees Encl ML20151K6901988-07-18018 July 1988 Summary of Operating Reactors Events Meeting 88-28 on 880712.Viewgraphs & List of Attendees Encl ML20151K7361988-04-15015 April 1988 Summary of Operating Reactors Events Meeting 88-15 on 880412.List of Attendees & Viewgraphs Encl ML20153A8551988-03-0909 March 1988 Summary of 880304 Meeting W/Util to Discuss 880122 Submittal Re Helium Circulator Failure & Recovery.Attendee List & Viewgraphs Encl ML20149L4981988-02-12012 February 1988 Summary of 871207 Meeting W/Utils in Bethesda,Md Re Licensees Revised Proposal to Comply W/Nrc Requirement for Simulation Facilities Under 10CFR55.45(b).List of Attendees & Util Simulation Facility Group Guideline Encl ML20147D8901988-01-12012 January 1988 Summary of 881202-03 Meeting W/Util,Inel & ORNL Re Status of Tech Spec Upgrade Program.Meeting Attendees & Listed Ref Encl ML20237D6921987-12-15015 December 1987 Summary of 871203 Meeting W/Util & Inel Re Protective Sys Setpoints in Tech Specs.List of Meeting Attendees Encl ML20237D2251987-12-15015 December 1987 Summary of 871204 Meeting W/Util Re Licensee Latest Proposals for Licensing Actions Concerning CRD Mechanism Temp Requalification & Position Instrumentation.List of Attendees & Related Info Encl ML20236B9121987-10-20020 October 1987 Summary of 871002 Meeting W/Util Re Specific Aspects of Util Approach to Conform w/10CFR55 for Facility.List of Attendees & Util Presentation Matl Encl ML20236A9731987-10-13013 October 1987 Summary of 870915-16 Meetings W/Four Facility Licensees in Bethesda,Md Re Proposal to Apply for NRC Approval for Simulation Facilities.Viewgraphs & Related Documents Encl ML20235Z5891987-10-0808 October 1987 Summary of 871006 Operating Reactor Events Meeting 87-34 Re Events Occurring Since 870929 Meeting.List of Attendees & Presentation Matl Encl ML20235H4401987-09-21021 September 1987 Summary of 870911 Meeting W/Util in Arlington,Tx Re Failure of Plant Circulator S/N C-2101 & Licensee Program to Recover from Failure.Licensee Rept, Preliminary Rept of Helium Circulator S/N C-2101 Damage & Justification... Encl ML20207S6271987-03-12012 March 1987 Summary of 870210 Meeting W/Util Re Emergency Diesel Generator Electrical Independence.List of Attendees Encl ML20210P0191987-02-0505 February 1987 Summary of 870113 Meeting W/Util Re Completion of Equipment Qualification Program & Program & Approvals Required for Plant Restart ML20212D8641986-12-24024 December 1986 Summary of 861209 Meeting W/Util Re Plant Emergency Electrical Power Sys.Fsar Commitment Re Emergency Diesel Generators revised.Marked-up Draft Rept Re Ac Standby Power Sys Encl ML20207B9781986-12-15015 December 1986 Summary of 861027-30 Meetings W/Util,Eg&G Idaho,Inc & ORNL at Site Re Tech Spec Upgrade Program.List of Attendees & NRC Comment Resolution Encl ML20214U7071986-12-0202 December 1986 Summary of 861120 Meeting W/Util,Ornl,Ga Technologies & Eg&G Re Temp Profiles for Equipment Qualification.List of Attendees & Viewgraphs Encl ML20214P8511986-11-25025 November 1986 Summary of 861105 Meeting W/Lasl Re Technical Evaluation Rept on Prestressed Concrete Reactor Vessel Tendons.Staff Requires Determination Re Listed Items.List of Attendees Encl ML20214Q0951986-11-25025 November 1986 Summary of 861027 Meeting W/Util to Discuss Schedule for Ie/Nrr Insp of Equipment Qualification Program.Attendance List & Viewgraphs Encl ML20197B8651986-10-28028 October 1986 Summary of 861001-02 Meetings W/Util,Inel & ORNL Re Staff Comments on Plant Tech Spec Upgrade Program.Nrc Comments Not Intended to Require Plant Mod or Changes to Licensing Basis of Plant ML20215L2101986-09-12012 September 1986 Summary of ACRS Subcommittee on Gas-Cooled Reactor Plants 860626 Public Meeting W/Nrc & Util in Washington,Dc Re Bases Used to Impose Requirements on Facility & Possibility of Severe Accidents.Attendance List & Viewgraphs Encl ML20215L2001986-09-12012 September 1986 Summary of ACRS Subcommittee on Fort St Vrain 860402 Public Meeting W/Nrc & Util at Facility Re Technical Problems Addressed During Recent Extended Outage & Mgt Charges. Attendance List & Viewgraphs Encl ML20206P5971986-08-15015 August 1986 Summary of 860724 Meeting W/Util,Inel,Wyle Labs,Sargent & Lundy & Tenera in Bethesda,Md Re Util Draft Documentation to Justify Qualification of safety-related Cabling at Plant. List of Attendees Encl ML20211Q6161986-07-23023 July 1986 Summary of Operating Reactor Events Meeting 86-25 on 860721 Re Events Since 860714 Meeting.List of Attendees,Discussion of Events & Status of Assignments Encl.Response Requested for Incomplete Assignments ML20207H0281986-07-21021 July 1986 Summary of 860627 Meeting W/Util Re Status of Tech Spec Upgrade Program.List of Attendees Encl ML20203B6181986-07-15015 July 1986 Summary of 860613 Meeting W/Util in Bethesda,Md Re Status of Plant Equipment Qualification Program.List of Attendees, Environ Qualification of Plant Safe Shutdown Cable & Cable Qualification Binders Encl ML20199K4911986-06-27027 June 1986 Summary of 860604 Meeting W/Util Re Status of Licensing Actions.List of Attendees,Summary of NRC Responses to Actions & Summary of Actions Encl ML20205S2341986-06-0101 June 1986 Summary of 860502 Meeting W/Util & Inel in Bethesda,Md Re Equipment Qualification Program Problem Areas.Attendees List & Supporting Documentation Encl ML20198H4561986-05-27027 May 1986 Summary of 860505 Meeting W/Util Re Status of Equipment Qualification Program.Considerable Work Remains Before Approval of Full Power Operation Can Be Granted.Staff Recommended Util Continue to Complete Program ML20197F1691986-05-0808 May 1986 Summary of Operating Reactors Events 860428 Meeting W/Listed Divs Re Chernobyl Nuclear Accident & Events at Us Reactors ML20197F6541986-05-0707 May 1986 Summary of 860423-24 Meetings W/Util,Ga Technologies & S&W at Site Re Fuel Block Cracking,Bldg 10 Const,Seismic Instrumentation,Pcrv Tendons & Integrated Leak Rate Testing. Attendance List & Viewgraphs Encl ML20203E8051986-04-18018 April 1986 Summary of Operating Reactors Events Meeting 86-12 on 860414 Re Events Since 860407.List of Attendees,Viewgraphs & Supporting Documentation Encl ML20205J9221986-04-18018 April 1986 Summary of ACRS 312th Meeting on 860410-12 in Washington,Dc Re Proposed NRC Safety Goal Policy Statement & Need for Guidance in Environ & PRA for Quantification of Public Health Risks to Nearby Populations ML20205S2591986-04-10010 April 1986 Summary of 860326 Site Meeting W/Util,Dibenedetto Assoc,Inc, Sandia & Sargent & Lundy Re Status of Qualifications of 10CFR50.49 Cables & Maint Records History Review.Viewgraphs & Attendees List Encl ML20141B7451986-03-28028 March 1986 Summary of 860313 Meeting W/Util in Arlington,Tx Re Tech Spec Limiting Condition for Operation 4.1.9 Covering Frequency of Manipulation of Reactor Controls.Supporting Documentation Encl ML20142A0661986-03-14014 March 1986 Summary of 860116 Meeting W/Util,Training Co,Inc & SM Stoller Corp Re Performance Enhancement Program. Viewgraphs Encl ML20141P1771986-03-14014 March 1986 Summary of 860130 Meeting W/Util,Inel,Tenera & Sargent & Lundy Re Equipment Qualification (EQ) Program.List of Attendees,Test Profiles & Review of Sample EQ Package Encl ML20142A0441986-03-12012 March 1986 Summary of 860221 Onsite Meeting W/Util,Inel,D Benedetto Assoc,S&W,Tenera,Ned & NPD Re Equipment Qualification Program & Steam Line Rupture Detection & Isolation Sys ML20138R7331985-10-31031 October 1985 Summary of 851029 Meeting W/Util & ORNL Re Schedule Extension to Equipment Qualification Rule.List of Attendees, Agenda & Matls Presented by Util Encl ML20138P0081985-10-21021 October 1985 Summary of Operating Reactors Events Meeting 85-19 on 851007 W/Ofc Directors,Div Directors & Representatives on Events Which Occurred Since Last Meeting on 851007 ML20134F3081985-08-15015 August 1985 Summary of 850722-26 Meetings W/Util & Ga Technologies Re Tech Spec Upgrade.List of Attendees Encl ML20129E6721985-05-28028 May 1985 Summary of 850803 Meeting W/Util & Ga Technologies Re CRD Mechanism Tech Spec Problem.List of Attendees Encl ML20128P6271985-05-23023 May 1985 Summary of 850516 Meeting W/Util Re Emergency Electrical Power Sys Concerns Resulting from Staff Evaluation of Problems from Testing Emergency Diesel Generators on 841218. Justification for Continued Operation Requested 1996-12-03
[Table view] |
Text
-
cwa
- *icoq\ UNITE D ST ATE S E,'. -
'h ~ NUCLEAR REGULATORY COMMISSION 5 j WASHINGTON, D. C. 20555 -
%, _ September 21, 1987
,/
+....
Docket No. 50-267 MEMORANDUM FOR: Jose A. Calvo, Director Project Directorate - IV Division of Reactor Projects - III, IV, V and Special Projects FROM: Kenneth'L. Heitner, Project Manager-Project Directorate - IV ,
Division.of Reactor Projects - III,.
IV, V and Special Projects
SUBJECT:
SUMMARY
OF' MEETING WITH PUBLIC SERVICE COMPANY OF COLORADO TO DISCUSS FAILURE OF FORT ST. VRAIN CIRCULATOR C-2101 - SEPTEMBER 11, 1987 Re: 1) Licensee Event Report 87-018 dated August 28, 1987 (P-87300)
- 2) Preliminary Report of Helium Circulator S/N C-2101 Damage and Justification for Returning to Power Operation (Attachment 1)
The purpose of this meeting was to discuss the failure of Fort St. Vrain i circulator S/N C-2101, and the licensee's program to recover from this -i failure. This failure was reported to the NRC in Reference 1. The licensee's preliminary report on this f ailure is Attachment 1 to this meeting summary.
The attendees at this meeting are listed in Attachment 2. This meeting was i held at the NRC Region IV office in Arlington, Texas. l The licensee reviewed the background of the Fort St. Vrain helium circulators. i The four circulators each consist of a single stage helium' compressor on a (
single shaf t' driven by a- steam turbine or a pelton wheel. The circulators were originally designed for a 30 year wear free life. The original machine used a number of stainless steel materials in its design; in particular, in some of the bolting that has now failed. In order to perform its safety.
function, the machine must be capable of starting and continued operation on boosted firewater.
In the transient that led to discovery of the failure, the machine apparently tripped when the plant protective system sensed an "over speed" condition and tripped the circulator. When it was discovered.that the secondary penetration seal was leaking excessively, the licensee decided to replace this circulator with the spare. , ,
^
8710010052 B70921 POR ADOCK 05000267
$ PDR ,
a.,--.---u.,---,____ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Jose A. Calvo At the time of removal, hardware ejected from the machine was found in the circulator steam discharge and exhaust piping. These findings are discussed fully in Attachment 1. Subsequent to removal of the machine and partial disassembly at GA Technologies in San Diego, California has clarified some of the failures. The failures include bolting that holds in place the steam labyrinth and attaches the steam scroll to the bearing assembly.
The licensee has performed metallurgical analysis of parts from the failed circulator. The presentation material from this analysis is Attachment 3 to this meeting summary. The key conclusion from this analysis is the stress corrosion cracking was found in the failed bolting materials. However, the contaminant (s) leading to the failures have not been identified. The licensee stated that the steam scroll to bearing assembly (3/4 inch) bolts were of a high strength material and had a preload of about 120,000 psi. This preload was based on tightening tongue, and was within code allowables. In further discussion, the staff noted that tightening torque is not always accurately reflected in preload, and that highly stressed components, such as these bolts would likely be sensitive to this type of failure. The staff also requested detailed photographs of these failures be provided.
The licensee is continuing to perform evaluations of the failure and related questions: This includes
- A failure effects analysis for the failed bolting
- An analysis of consequences of loose parts ejected from the machine
- A review of the history and previous problems with all 5 circulator machines, and
- A more detailed review of previous materials problems.
These evaluations are underway, and other supplemental evaluations are planned.
The licensee stated that continued operation of Fort St. Vrain was justified, even though the failure found in circulator S/N C-2101, were likely to occur eventually in the other circulators.
The basis for continued operation was based on the following:
- 1) The failed circulator had been replaced. The results of the failure analysis to date had been presented to the staff.
- 2) A more thorough evaluation was being carried out with the goal of having a final evaluation in 120 days from this meeting date.
- 3) Increased on-line monitoring of the circulator wobble output on a daily basis, or on significant speed increases. Other performance parameters would also be trended.
- 4) Operation above 35% power would be on all 4 circulators.
i'
- 5) If another circulator failure is discovered, the licensee would shutdown the reactor.
' Jose'A. Calvo '
- 6) When the. evaluations noted above are completed, the licensee would prepare a specific plan of action to correct the condition in all circulators. At this time, another meeting would be held with the staff, to review these proposed actions.
- 7) Following the above evaluation, the licensee would reevaluate the current' circulator surveillance requirements, and propose a suitable amendment to the plant's Technical Specifications.
Based:on the above, the staff stated'that they concurred with the licensees proposal to continue reactor operation until all of' the necessary evaluations were complete. .However, the staff noted that.it's concurrence would only be for the.next-six months, and the licensee should make every effort to maintain the above schedule. The staff, also requested that the licensee provide a summary of its commitments to the staff, and the staff would respond with a' l written Safety Evaluation. The staff stated that the reactor may be returned to power operation (above 30% power) as'soon as the restart commi'mentsc are complete.
SSl Kenneth L. Heitner, Project Manager l Project Directorate - IV Division of Reactor Projects - III, IV, V and Special Projects
Enclosures:
1 As stated DISTRIBUTION Docket File NRC & Local PDRs PD4 Reading File l KHeitner OGC-Bethesda EJordan JPartlow ACRS (10)
NRC Participants PD4 HH KHeitner: sr 09/Q/87