Proposed Tech Specs,Raising Pump Flow Rate from 550 to 555 Gpm
ML20235Z508
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 03/06/1989
From:
GEORGIA POWER CO.
To:
Shared Package
ML20235Z506 List:
References
NUDOCS 8903150490
Download: ML20235Z508 (1)


Text

_____-__________ __ __ __ _ _ _ _ _ .

. . s. ,

,. IMERGENCY CORE COOLING SYSTEMS j

g SURVEILLANCE REQUIREMENTS (Continued) h.

By performing a flow balance test, during shutdown, following com-pletion of modifications to the ECCS subsystems that alter.the subsystem flow characteristics and verifying that:

1)

For centrifugal charging pump lines, with a single pump running: ,

a) The sum of the injection line flow rates, excluding the '

highest flow rate, is greater than or equal to 284 gps, and ,

b)

The total unit 575 sem pump 2 flow rate is less than or equal to 550 gpe(vnit

2) For Safety Inje(ction p) ump lines, with a single pump runn a) The sum of the injection line flow rates excluding the highest flow rate, is greater than or equ,al to 406 gpe, and b) The total pump flow rate is less than or equal to 660 gpe.
3) For RHR pump lines, with a single pump running, the sum of the i

injection line flow rates is greater than or equal to 3788 gpe.

t t

O V0GTLE UNITS - 1 & 2 3/4 5-6

- _ _ _ _ - - _ _ _ - - - _ _ -