MONTHYEARML24038A0322024-02-0707 February 2024 (Vcsns), Unit 1, 10 CFR 21 Report - Emergency Diesel Generator Flash Contactor Relay IR 05000395/20230042024-01-31031 January 2024 Integrated Inspection Report 05000395/2023004 ML24022A1582024-01-22022 January 2024 (Vcsns), Unit 1 - Reply to a Notice of Violation: EA-23-093 ML24022A1202024-01-22022 January 2024 Notification of Target Set Inspection and Request for Information (NRC Inspection Report 05000395/2024403) ML24018A0112024-01-18018 January 2024 CFR 21 Report Emergency Diesel Generator Fuel Oil Piping IR 05000395/20240112024-01-17017 January 2024 Notification of VC Summer Station Comprehensive Engineering Team Inspection - U.S. Nuclear Regulatory Commission Inspection Report 05000395/2024011 ML23361A1042023-12-21021 December 2023 Inservice Testing Program for Pumps and Valves Fifth Interval Update and Associated Relief and Alternative Requests IR 05000395/20230912023-12-21021 December 2023 Final Significance Determination of a White Finding and Notice of Violation and Assessment Followup Letternrc Inspection Report 05000395/2023091 ML23354A1802023-12-20020 December 2023 301 Examination Report with Cover Letter ML23347A0492023-12-12012 December 2023 Technical Specification Bases Changes Updated Through November 2023 ML23334A2462023-11-30030 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23334A2372023-11-30030 November 2023 (Vvsns), Unit 1 - Annual Commitment Change Summary Report ML23332A1942023-11-28028 November 2023 (Vcsns), Unit 1, Correction of Typographical Error in License Amendment Request - Inverter Allowed Outage Time (AOT) Extension ML23317A2242023-11-0909 November 2023 (Vcsns), Unit 1 - License Amendment Request - Inverter Allowed Outage Time (AOT) Extension ML23289A1172023-11-0303 November 2023 Tribal Request for Scoping Comments Concerning the Environmental Review of the V.C. Summer SLRA ML23289A1152023-11-0303 November 2023 Ltr to R. Nelson - Request for Scoping Comments Concerning the Environmental Review of the V.C. Summer SLRA ML23289A1162023-11-0303 November 2023 Ltr to W. Emerson - Request for Scoping Comments Concerning the Environmental Review of the V.C. Summer SLRA IR 05000395/20234032023-11-0101 November 2023 Material Control and Accounting Program Inspection Report 05000395/2023403 Cover IR 05000395/20230032023-11-0101 November 2023 Integrated Inspection Report 05000395/2023003 ML23284A1792023-10-16016 October 2023 Subsequent License Renewal Application Online Reference Portal ML23275A0142023-10-11011 October 2023 SLRA - Acceptance and Opportunity for Hearing - Letter ML23284A1662023-10-10010 October 2023 (Vcsns), Unit 1 - Request for Regulatory Conference; (EA-23-093) IR 05000395/20230902023-10-0404 October 2023 NRC Inspection Report 05000395/2023090 and Preliminary Yellow Finding and Apparent Violation IR 05000395/20230112023-09-27027 September 2023 Focused Engineering Inspection Report 05000395/2023011 ML23250A3112023-09-20020 September 2023 Request to Revise Reactor Vessel Material Surveillance Capsule Withdrawal Schedules ML23244A2352023-09-18018 September 2023 Request to Use a Subsequent Edition of the ASME Code, Section XI ML23230A0012023-09-15015 September 2023 Request to Use a Provision of a Previous Edition of the ASME Boiler and Pressure Vessel Code, Section XI, for Non-Destructive Examinations ML23235A0432023-09-0505 September 2023 Receipt and Availability of the Subsequent License Renewal Application IR 05000395/20234012023-08-30030 August 2023 Security Baseline Inspection Report 05000395/2023401 ML23242A1192023-08-29029 August 2023 (Vcsns), Unit 1 - Inservice Inspection (ISI) Owner'S Activity Report (OAR) for Refueling Outage 27 ML23243B0362023-08-25025 August 2023 Request for FEMA Consultation on the Dominion Energy Proposal to Consolidate the Emergency Operations Facility for the Virgil C. Summer Nuclear Station Unit 1 IR 05000395/20230052023-08-23023 August 2023 Updated Inspection Plan for Virgil C. Summer Nuclear Station (Report 05000395 2023005) ML23233A1752023-08-17017 August 2023 Application for Subsequent Renewed Operating License IR 05000395/20230022023-08-14014 August 2023 Integrated Inspection Report - Integrated Inspection Report 05000395/2023002 and Apparent Violation IR 05000395/20230102023-08-12012 August 2023 Biennial Problem Identification and Resolution Inspection Report 05000395/2023010 ML23207A1102023-07-26026 July 2023 NRC Regulatory Issues Summary 2023-01 Preparation and Scheduling of Operator Licensing Examinations IR 05000395/20234412023-07-17017 July 2023 95001 Supplemental Inspection Report 05000395/2023441 and Follow Up Assessment Letter ML23190A0012023-07-0909 July 2023 Special Report 2023-003 Inoperable Radiation Monitoring Instrumentation Channel ML23187A5092023-07-0606 July 2023 Request for Federal Emergency Management Agency Consultation on the Dominion Energy Proposal to Consolidate the Emergency Operations Facility for the Virgil C. Summer Nuclear Station Unit 1 ML23178A1682023-06-26026 June 2023 2022 Annual Report of Emergency Core Cooling System (ECCS) Model Changes Pursuant to the Requirements of 10 CFR 50.46 ML23173A1052023-06-22022 June 2023 Special Report 2023-002 Inoperable Loose-Part Monitoring System Channel ML23163A2352023-06-12012 June 2023 Request to Use a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI, for the SPS Sixth Inservice Inspection (Isi) Intervals and VCSNS Fifth ISI Interval ML23159A2332023-06-0808 June 2023 License Amendment Request - Emergency Response Organization Augmentation Time Change, Emergency Operations Facility Relocation and Other Emergency Plan Changes ML23156A3092023-06-0505 June 2023 Requalification Program Inspection Virgil C. Summer Nuclear Station Unit 1 - 05000395/2023003 2024-02-07
[Table view] Category:Schedule and Calendars
MONTHYEARML23275A0142023-10-11011 October 2023 SLRA - Acceptance and Opportunity for Hearing - Letter ML22018A0292022-01-18018 January 2022 Region 2 RFI - 2022 Program Inspections ML18093B4962018-04-0303 April 2018 V.C.Summer, Unit 1 - Revision to 2019 Operator Licensing Examination Schedule ML15041A1682015-02-13013 February 2015 Summary of Site Audit to Support the Review of a License Amendment Request for Virgil C. Summer Nuclear Station, Unit 1, to Transition to the National Fire Protection Association Standard 805 Fire Protection Licensing Basis ML1226400582012-09-20020 September 2012 NFPA 805 SE Schedule - September 2012 ML1219103132012-07-0505 July 2012 Regulatory Issue Summary, RIS 2012-07 Preparation and Scheduling of Operator Licensing Examinations ML11182C0332011-06-30030 June 2011 Regulatory Issue Summary, RIS 2011-04 Preparation and Scheduling of Operator Licensing Examinations RC-10-0113, Preparation and Scheduling of Operator Licensing Examinations2010-07-29029 July 2010 Preparation and Scheduling of Operator Licensing Examinations 2023-10-11
[Table view] |
See also: RIS 2011-04
Text
Andy T. BarbeeDirector, Nuclear Training803.345.4034A SCANA COMPANYJune 30, 2011U. S. Nuclear Regulatory CommissionATTN: Document Control DeskWashington, DC 20555-0001
Dear Sir / Madam:
Subject: VIRGIL C. SUMMER NUCLEAR STATION, UNITS 1,2 and 3DOCKET NO. 50-395DOCKET NO.52-027 and 52-028OPERATING LICENSE NO. NPF-12REGULATORY ISSUE SUMMARY, RIS 2011-04PREPARATION AND SCHEDULING OF OPERATOR LICENSINGEXAMINATIONSAttached please find South Carolina Electric & Gas Company's (SCE&G) anticipatedschedule for operator licensing examinations.The first AP-1 000 exam, scheduled in CY2013, is a split exam (written exam in CY2013and operating exam in CY2014).Should you have any questions concerning Unit 1, please call Mr. Rick Garner at (803)931-5636. For questions concerning Units 2 and 3, please call Mr. Paul Mothena at(803) 345-4642.Ve trlyoursA T BarbeeTS/ATB/drAttachments (2)c: K. B. MarshS. A. ByrneJ. B. ArchieN. S. CamsJ. H. Hamilton, Jr.R. J. WhiteW. M. CherryV. M. McCreeM. E. FrankeR. E. MartinR. T. GarnerP. A. MothenaNRC Resident InspectorK. M. SuttonNSRCRTS (CR-1 1-03208)File (814.04, RR 1150)DMS (RC-11-0112)Virgil C. Summer Station. Post Office Box 88 -Jenkinsville, SC * 29065 * T (803) 345-5209 NRC FORM 538 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 10/31/2011('10-2008) Estimated burden per response to comply with this voluntary informationcollection request 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This information collection is used to plan budgetsand resources for operator examinations. Send comments regardin burdenOPERATOR LICENSING estimate to the Records and FOIA/Privacy Services Branch (T-5 F53), U.S.Nuclear Regulatory Commission, Washington, DC 20555-0001, or by internetEXAMINATION DATAto infocollects@nrc.gov, and to the Desk Officer, Office of Informationand Regulatory Affairs, NEOB-10202, (3150-0131). Office of Management andBudget, Washington, DC 20503, If a means used to impose an informationcollection does not display a currently valid OMB control number, the NRC maynot conduct or sponsor, and a person is not required to respond to. theinformation collection.FACILITY NRC REGIONVirgil C. Summer Nuclear Station, Unit I!1A. PROPOSED EXAMINATION PREPARATION SCHEDULEPROPOSED NUMBER CY 2013 Cy 2014 Cy 2015 Cy 2016ESTIMATED NUMBER OFLICENSEE-PREPARED 1 1 1 1EXAMINATIONSESTIMATED NUMBER OFNRC-PREPARED 0 0 0 0EXAMINATIONSB. INITIAL OPERATOR LICENSE EXAMINATIONSPROPOSED NUMBER CY 2013 Cy 2014 CY 2015 Cy 2016NUMBER OF REACTOR 7 6 6 6OPERATORSNUMBER OF SENIOR REACTOR 3 3 3 3OPERATORS -INSTANTNUMBER OF SENIOR REACTOROPERATORS -UPGRADENUMBER OF SENIOR REACTOR 0 0 0 0OPERATORS -LIMITEDPROPOSED DATESPRIMARY DATE 06/17/2013 03/17/2014 05/25/2015 06/01/2016ALTERNATE DATE 06/24/2013 03/24/2014 06/01/2015 06/08/2016C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULECY 2013 CY 2014PROPOSEDNUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBERESTIMATEDNUMBER OF 9 9CANDIDATESNRC FORM 536 (10-2008)PRINTED ON RECYCLED PAPER NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 10/31/2011(10-2008) Estimated burden per response to comply with this voluntary informationcollection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This information collection is used to plan budgetsand resources for operator examinations. Send comments regarding burdenOPERATOR LICENSING estimate to the Records and FOIA/Privacy Services Branch (T-5 F53), U.S.Nuclear Regulatory Commission, Washington, DC 20555-0001, or by internetEXAMINATION DATA e-mail to infocollects@nrc.gov, and to the Desk Officer, Office of Informationand Regulatory Affairs, NEOB-10202, (3150-0131), Office of Management andBudget, Washington, DC 20503. If a means used to impose an informationcollection does not display a currently valid OMB control number, the NRC maynot conduct or sponsor, and a person is not required to respond to, theinformation collection.FACILITY NRC REGIONVirgil C. Summer Nuclear Station, Units 2 and 3IIA. PROPOSED EXAMINATION PREPARATION SCHEDULEPROPOSED NUMBER CY 2013 Cy 2014 Cy 2015 Cy 2016ESTIMATED NUMBER OF 1 (written) I (operating) 1LICENSEE-PREPAREDEXAMINATIONS I (combined)ESTIMATED NUMBER OF 0NRC-PREPAREDEXAMINATIONSB. INITIAL OPERATOR LICENSE EXAMINATIONSPROPOSED NUMBER CY 2013 CY 2014 CY 2015 Cy 2016NUMBER OF REACTOR 0 0 0 0OPERATORSNUMBER OF SENIOR REACTOR 24 (written) 24 (operating) 16 15OPERATORS -INSTANT 24 (combined)NUMBER OF SENIOR REACTOR 0 0 0 0OPERATORS -UPGRADENUMBER OF SENIOR REACTOR 0 0 0 0OPERATORS -LIMITEDPROPOSED DATESPRIMARY DATE 10/09/2013 (w) 07/07/2014 (o) 03/16/2015 04/11/201612/01/2014 (c)10/16/2013 (w) 07/14/2014 (o) 03/23/2015 04/18/2016ALTERNATE DATE12/08/2014 (c)C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULECY 2013 CY 2014PROPOSEDNUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBERESTIMATEDNUMBER OF 24 24 16CANDIDATESNRC FORM 536 (10-2008)PRINTED ON RECYCLED PAPER