V.C.Summer, Unit 1 - Revision to 2019 Operator Licensing Examination Schedule
ML18093B496
Person / Time
Site: Summer South Carolina Electric & Gas Company icon.png
Issue date: 04/03/2018
From: Barbee A
SCANA Corp, South Carolina Electric & Gas Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML18093B496 (3)


Text

Andy T. Barbee Director, Nuclear Training 803.345.4034 A SCANA COMPANY April 3, 2018 Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555

Dear Sir / Madam:

Subject:

VIRGIL C. SUMMER NUCLEAR STATION (VCSNS), UNIT 1 DOCKET NO. 50-395 OPERATING LICENSE NO. NPF-12 REVISION TO 2019 OPERATOR LICENSING EXAMINATION SCHEDULE

Reference:

A. T. Barbee Letter (SCE&G) to NRC Document Control Desk, Regulatory Issue Summary, RIS 2016-09 Preparation and Scheduling of Operator Licensing Examinations, dated July 15, 2016 [ML16201A223]

A. T. Barbee Letter (SCE&G) to NRC Document Control Desk, Regulatory Issue Summary, RIS 2017-03 Preparation and Scheduling of Operator Licensing Examinations, dated May 2, 2017 [ML17123A304]

South Carolina Electric & Gas Company (SCE&G) is submitting a revised anticipated schedule for the 2019 initial licensed operator examination scheduled for VCSNS Unit 1 per the enclosed NRC Forms 536, Operator Licensing Examination Data. VCSNS is cancelling the request for Initial Operator License Examinations for November 2019, and asking for Initial Operator License Examinations to be scheduled in December 2019. The primary starting date proposed for the December 2019 examination is the week of December 9, 2019, with an alternate proposed starting date for the week of December 16, 2019. The revised schedule is required due to SCE&G agreeing to switch Initial Licensed Operator Examination dates with Tennessee Valley Authority's Browns Ferry and Watts Bar nuclear stations.

Should you have any questions concerning this matter, please call Mr. Robert Shane at (803) 345-4146.

Andy T. Barbee TS/ATB/sr V

Enclosures cc: Without Enclosure unless noted J. E. Addison W. M. Cherry S. A. Williams NRC Resident Inspector W. K. Kissam C. Haney W. H. Moore RTS (CR-18-01251)

J. B. Archie G. J. McCoy R. Shane File (814.04, RR 1150)

J. H. Hamilton E. F. Guthrie NSRC PRSF (RC-18-0040) (with G. J. Lindamood D. Bacon (with Enclosure) K. M. Sutton Enclosure)

V. C. Summer Nuclear Station

  • P. 0. Box 88
  • 29065
  • F (803) 941-9776
  • www.sceg.com

NRC FORM 536 U. S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 11/30/2020 (11-2017)

Estimated burden per response to comply with this voluntary information collection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This OPERATOR LICENSING information collection is used to plan budgets and resources for operator examinations. Send comments regarding burden estimate to the Information Sen/ices Branch (T-2 F43), U.S. Nuclear EXAMINATION DATA Regulatory Commission, Washington, DC20555-0001, or by e-mail to lnfocollects.Resource@nrc.gov, and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0131), Office

          • of Management and Budget, Washington, DC 20503. If a means used to impose an information collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information collection.

FACILITY NRC REGION Virgil C. Summer Nuclear Station, Unit 1 11 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY2018 CY 2019 CY 2020 CY 2021 ESTIMATED NUMBER OF LICENSEE-PREPARED 1 1 1 0 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY2018 CY 2019 CY 2020 CY 2021 NUMBER OF REACTOR OPERATORS 3 3 3 0 NUMBER OF SENIOR REACTOR OPERATORS - INSTANT 3 3 3 0 NUMBER OF SENIOR REACTOR OPERATORS - UPGRADE 3 3 3 0 NUMBER OF SENIOR REACTOR OPERATORS - LIMITED 0 0 0 0 PROPOSED DATES PRIMARY DATE 05/28/2018 12/09/2019 10/26/2020 ALTERNATE DATE 06/04/2018 12/16/2019 11/02/2020 NRC FORM 536 (11-2017)

NRC FORM 536 U. S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 11/30/2020 (11-2017)

Estimated burden per response to comply with this voluntary information collection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This OPERATOR LICENSING information collection is used to plan budgets and resources for operator examinations. Send comments regarding burden estimate to the Information Services Branch (T-2 F43), U.S. Nuclear MSSt/ LAMINATION DATA Regulatory Commission, Washington, DC20555-0001, or by e-mail to lnfocollects.Resource@nrc.gov, 9>>***** and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0131), Office of Management and Budget, Washington, DC 20503. If a means used to impose an information collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information collection.

FACILITY NRC REGION Virgil C. Summer Nuclear Station, Unit 1 II A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY2019 CY 2020 CY 2021 CY 2022 ESTIMATED NUMBER OF LICENSEE-PREPARED 1 1 0 1 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMI NATIONS PROPOSED NUMBER CY2019 CY 2020 CY 2021 CY 2022 NUMBER OF REACTOR OPERATORS 3 3 0 3 NUMBER OF SENIOR REACTOR OPERATORS - INSTANT 3 3 0 3 NUMBER OF SENIOR REACTOR OPERATORS - UPGRADE 3 3 0 3 NUMBER OF SENIOR REACTOR OPERATORS - LIMITED 0 0 0 0 PROPOSED DATES PRIMARY DATE 12/09/2019 10/26/2020 04/25/2022 ALTERNATE DATE 12/16/2019 11/02/2020 05/02/2022 NRC FORM 536 (11-2017)