Category:Schedule and Calendars
MONTHYEARML23275A0142023-10-11011 October 2023 SLRA - Acceptance and Opportunity for Hearing - Letter RS-23-077, Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-06-16016 June 2023 Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations AEP-NRC-2023-32, Response to NRC Regulatory Issue Summary 2023-1 Preparation and Scheduling of Operator Licensing Examinations2023-06-0606 June 2023 Response to NRC Regulatory Issue Summary 2023-1 Preparation and Scheduling of Operator Licensing Examinations ML23145A2602023-06-0505 June 2023 Revision of Schedule for the Environmental Review of the Turkey Point Nuclear Generating Station, Units 3 and 4, Subsequent License Renewal Application (EPID Number: L-2021-SLE-0002) (Docket Numbers: 50-250 and 50-251) L-2023-072, Preparation and Scheduling of Operator Licensing Examinations2023-05-22022 May 2023 Preparation and Scheduling of Operator Licensing Examinations ML23130A2732023-05-10010 May 2023 and Waterford 3 Steam Electric Station - Response to Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations ML22228A2572022-05-12012 May 2022 11 CNS-2022-06 Public Documents W3F1-2022-0031, Proposed Revision to Reactor Vessel Surveillance Capsule Withdrawal Schedule to Reflect Location of Standby Capsules 3/W-104 and 6/W-2842022-04-25025 April 2022 Proposed Revision to Reactor Vessel Surveillance Capsule Withdrawal Schedule to Reflect Location of Standby Capsules 3/W-104 and 6/W-284 AEP-NRC-2022-12, Commitment Schedule Change Related to Seismic PRA Distributed Ignition Backup Power Source2022-03-0202 March 2022 Commitment Schedule Change Related to Seismic PRA Distributed Ignition Backup Power Source ML22018A0292022-01-18018 January 2022 Region 2 RFI - 2022 Program Inspections ML21354A7522021-12-20020 December 2021 Recertification of Foreign Ownership Control or Influence and Request for FOCI Redetermination - Part 7 of 18 ML21354A7532021-12-20020 December 2021 Recertification of Foreign Ownership Control or Influence and Request for FOCI Redetermination - Part 8 of 18 ML21354A7512021-12-20020 December 2021 Recertification of Foreign Ownership Control or Influence and Request for FOCI Redetermination - Part 6 of 18 ML21083A1372021-03-22022 March 2021 NEIMA Reporting ML21083A1442021-03-22022 March 2021 Strategy 6 ML21083A1432021-03-22022 March 2021 Strategy 5 ML21083A1422021-03-22022 March 2021 Strategy 4 ML21083A1412021-03-22022 March 2021 Strategy 3 ML21083A1402021-03-22022 March 2021 Strategy 2 ML21083A1392021-03-22022 March 2021 Strategy 1 ML21083A1382021-03-22022 March 2021 Rulemaking NLS2020013, Preparation and Scheduling of Operator Licensing Examinations2020-03-12012 March 2020 Preparation and Scheduling of Operator Licensing Examinations ML19200A0702019-08-15015 August 2019 Subsequent License Renewal Updated Budget Estimate and Revised Environmental Review Schedule ML19127A0702019-05-0909 May 2019 Schedule Correction for the Review of the Turkey Point Nuclear Generating Unit Nos. 3 and 4 Subsequent License Renewal Application (EPID Nos. L-2018-LNE-0001/L-2018-RNW-0002) ML19123A2202019-05-0303 May 2019 Schedule Revision for the Review of the Turkey Point Nuclear Generating Unit Nos. 3 and 4 Subsequent License Renewal Application (EPID Nos. L-2018-LNE-0001/L-2018-RNW-0002 W3F1-2019-0001, Proposed Revision to Reactor Vessel Surveillance Capsule Withdrawal Schedule2019-04-25025 April 2019 Proposed Revision to Reactor Vessel Surveillance Capsule Withdrawal Schedule ML19028A4172019-01-30030 January 2019 Schedule Revision for the Review of the Turkey Point Nuclear Generating Unit Nos. 3 and 4 Subsequent License Renewal Application ML18093B4962018-04-0303 April 2018 V.C.Summer, Unit 1 - Revision to 2019 Operator Licensing Examination Schedule ML17347A1272017-12-20020 December 2017 Status Update and Schedule Revision for the Review of the Waterford Steam Electric Station, Unit 3, License Renewal Application (CAC Nos. MF7492 and MF7493) ML15041A1682015-02-13013 February 2015 Summary of Site Audit to Support the Review of a License Amendment Request for Virgil C. Summer Nuclear Station, Unit 1, to Transition to the National Fire Protection Association Standard 805 Fire Protection Licensing Basis AEP-NRC-2014-45, Response to Regulatory Issue Summary 2014-05 Preparation and Scheduling of Operator Licensing Examinations2014-06-11011 June 2014 Response to Regulatory Issue Summary 2014-05 Preparation and Scheduling of Operator Licensing Examinations ML13210A1482013-08-15015 August 2013 Schedule Revision for the Environmental Review of the Callaway Plant, Unit 1, License Renewal Application L-2013-207, NRC Regulatory Issue Summary 2013-06, Preparation and Scheduling of Operator Licensing Examinations2013-06-28028 June 2013 NRC Regulatory Issue Summary 2013-06, Preparation and Scheduling of Operator Licensing Examinations ML13141A7482013-05-30030 May 2013 Schedule Revision for the Safety Review of the Callaway Plant, Unit 1, LRA ML1226400582012-09-20020 September 2012 NFPA 805 SE Schedule - September 2012 ML1219103132012-07-0505 July 2012 Regulatory Issue Summary, RIS 2012-07 Preparation and Scheduling of Operator Licensing Examinations ML1118905002011-07-0808 July 2011 Submittal of Response to RIS 2011-04, Preparation and Scheduling of Operator Licensing Examinations ML11182C0332011-06-30030 June 2011 Regulatory Issue Summary, RIS 2011-04 Preparation and Scheduling of Operator Licensing Examinations CNRO-2011-00003, Unit 1, Updated Schedule of Submittal of Future License Renewal Applications2011-06-22022 June 2011 Unit 1, Updated Schedule of Submittal of Future License Renewal Applications ML11154A0612011-06-0101 June 2011 Constellation Energy Nuclear Group - Notification of Filing of Securities and Exchange Commission Schedule 13G ML11137A2012011-05-17017 May 2011 Generator Inspection Conference Call LIC-11-0033, Response to NRC Generic Request for Additional Information (RAI)2011-03-31031 March 2011 Response to NRC Generic Request for Additional Information (RAI) ML1100300212010-12-29029 December 2010 Ltr to E. Erb Re Participation in Commission Meeting on Implementation of Part 26 on 02/08/11 ML1030902612010-10-25025 October 2010 Independent Spent Fuel Storage Installation, Nine Mile Point, Units 1 & 2 and R.E. Ginna - Submittal of Securities and Exchange Commission Schedules RC-10-0113, Preparation and Scheduling of Operator Licensing Examinations2010-07-29029 July 2010 Preparation and Scheduling of Operator Licensing Examinations NLS2010071, Preparation and Scheduling of Operator Licensing Examinations2010-07-28028 July 2010 Preparation and Scheduling of Operator Licensing Examinations ML1021004382010-07-27027 July 2010 Response to NRC Regulatory Issue Summary 2010-08 AEP-NRC-2010-49, License Amendment Request for Approval of the Donald C. Cook Nuclear Plant Cyber Security Plan2010-07-19019 July 2010 License Amendment Request for Approval of the Donald C. Cook Nuclear Plant Cyber Security Plan AEP-NRC-2010-30, Schedule for Submittal of Revised Small Break Loss of Coolant Accident Analyses Addressing Residual Heat Removal System Spray Issue2010-03-29029 March 2010 Schedule for Submittal of Revised Small Break Loss of Coolant Accident Analyses Addressing Residual Heat Removal System Spray Issue ML0934506092009-12-30030 December 2009 Revision of Schedule for the Conduct of Review of the Cooper Nuclear Station, Unit 1, License Renewal Application 2023-06-06
[Table view] Category:Spreadsheet File
MONTHYEARML14177A7602014-06-19019 June 2014 FOIA 2014-0264 - Billed Inspection Hours Disaggregated by Both Plant and Year FY1994-2014 ML13246A3502013-10-31031 October 2013 NFPA-805 LAR F&O Table ML13002A4482012-12-20020 December 2012 ALI Avb Wear 1R18_R1 ML1226400582012-09-20020 September 2012 NFPA 805 SE Schedule - September 2012 ML0914806732009-06-0505 June 2009 Audit Plan Table LIC-06-0116, Spreadsheet File of Instructions, Time Temp Ph Input, Material Input, Materials Conversions, Results Tables2006-10-10010 October 2006 Spreadsheet File of Instructions, Time Temp Ph Input, Material Input, Materials Conversions, Results Tables ML0628604322006-10-10010 October 2006 Spreadsheet File of Instructions, Materials Conversions, Results Table, Releases by Material, & Precipitate by Material, Reports ML0533300292005-06-27027 June 2005 06-2005 - Licensee Written Examination Analysis 2014-06-19
[Table view] |