MONTHYEARML20138B7771997-04-25025 April 1997 Corrected Page 8 of SE for Amend 69 to La Crosse Boiling Water Reactor License ML20137R7731997-04-11011 April 1997 Safety Evaluation Approving Changes to QAP Description ML20127D3901993-01-13013 January 1993 SE Supporting Amend 67 to License DPR-45 ML20245J7351989-04-26026 April 1989 Safety Evaluation Supporting Amend 65 to License DPR-45 ML20151T0991988-08-0808 August 1988 Safety Evaluation Supporting Approval of Util Rev 10 to Emergency Plan ML20150D7051988-07-0808 July 1988 Safety Evaluation Supporting Rev 10 to Emergency Plan ML20155F9161988-05-31031 May 1988 Safety Evaluation Supporting Amend 62 to License DPR-45 ML20151G0591988-04-11011 April 1988 Safety Evaluation Supporting Amend 60 to Provisional License DPR-45 ML20148C3941988-03-15015 March 1988 Safety Evaluation Supporting Amend 59 to License DPR-45 ML20149G0711988-01-0404 January 1988 Safety Evaluation Supporting Amend 58 to License DPR-45 ML20235B5711987-09-15015 September 1987 Safety Evaluation Supporting Amend 57 to License DPR-45 ML20206G6421987-04-0808 April 1987 Safety Evaluation Supporting Amend 55 to License DPR-45 ML20214N3921986-09-10010 September 1986 Safety Evaluation Supporting Amend 54 to License DPR-45 ML20209E9241986-09-0505 September 1986 Safety Evaluation Rept Supporting Amend 53 to License DPR-45.Neither EIS Nor Environ Assessment Necessary ML20209D9681986-09-0202 September 1986 Safety Evaluation Supporting Amend 52 to License DPR-45 ML20212N6121986-08-22022 August 1986 Safety Evaluation of Util 840530 Response to Generic Ltr 84-11, Insp of BWR Stainless Steel Piping. Response Did Not Meet Requirements NUREG-0827, Safety Evaluation Supporting Proposed Installation of remotely-operated Solenoid in Pipe Tunnel Outside Containment for Offgas Vent Line1986-08-0606 August 1986 Safety Evaluation Supporting Proposed Installation of remotely-operated Solenoid in Pipe Tunnel Outside Containment for Offgas Vent Line ML20204J2601986-07-30030 July 1986 Safety Evaluation Supporting Amend 51 to License DPR-45 ML20203H3161986-07-15015 July 1986 Safety Evaluation Supporting Amend 50 to License DPR-45 ML20207G2791986-07-15015 July 1986 Safety Evaluation Supporting Amend 49 to License DPR-45 ML20199K3891986-06-26026 June 1986 Safety Evaluation Supporting Exemption from Certain Requirements of 10CFR50.54(w) Re Primary Onsite Property Damage ML20141F4271986-04-14014 April 1986 Safety Evaluation Supporting Amend 48 to License DPR-45 ML20141D6331986-03-31031 March 1986 Safety Evaluation Denying 821029 Request for Amend to License DPR-45,eliminating Four Type B Tests ML20154S4771986-03-27027 March 1986 Safety Evaluation Supporting Amend 47 to License DPR-45 ML20140F3571986-03-25025 March 1986 Safety Evaluation Supporting Amend 46 to License DPR-45 ML20140D7311986-03-20020 March 1986 Safety Evaluation Accepting Util Responses to Generic Ltr 83-28,Items 3.1.1,3.1.2,3.2.1 & 3.2.2 Re post-maint Testing IR 05000409/19840091986-03-10010 March 1986 Safety Evaluation Supporting Util 850208 Proposed Installation of Two Check Valves in Series in Sample Line to Improve Capability to Isolate Containment Atmosphere from Environ,Per Insp Rept 50-409/84-09 ML20141F9831986-01-0606 January 1986 Safety Evaluation Supporting Amend 45 to License DPR-45 ML20133F6491985-10-0808 October 1985 Safety Evaluation Supporting Amend 44 to License DPR-45 ML20205B7701985-09-0606 September 1985 SER Supporting Stability of Containment & Stacks Under Flood Conditions ML20126E5121985-06-0707 June 1985 Safety Evaluation Supporting Amend 43 to License DPR-45 ML20125D2041985-06-0505 June 1985 Safety Evaluation Supporting Amend 42 to License DPR-45 ML20138K0751984-12-12012 December 1984 Safety Evaluation on 831025 & 850918 Responses to Generic Ltr 83-28,Item 1.1 Re post-trip Review Program & Procedures. Program & Procedures Acceptable ML20062D9761982-07-30030 July 1982 Safety Evaluation Supporting Amend 29 to License DPR-45 ML20062B9961978-10-11011 October 1978 Safety Evaluation Supporting Amend 14 to License DPR-45 1997-04-25
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20210A6361999-04-30030 April 1999 Rev 13 to Quality Assurance Program Description ML20206J3751999-04-29029 April 1999 Rev 13 to QA Program Description ML20207A9591999-01-31031 January 1999 Revised LACBWR Decommissioning Plan ML20196G0751998-12-31031 December 1998 1998 Annual Rept for Dairyland Power Cooperative ML20204D8371998-12-31031 December 1998 Annual Rept for 1998 - Rept of Changes,Tests & Experiments for Lacbwr. with ML20237E2701998-07-31031 July 1998 Rev 12 to QA Program Description ML20196A9241998-07-31031 July 1998 Rev 12 to LACBWR QA Program Description (Qapd) ML20202J0691998-01-31031 January 1998 Revised LACBWR Decommissioning Plan ML20202J0781998-01-31031 January 1998 Revised LACBWR Initial Site Characterization Survey for Safstor ML20203K0041997-12-31031 December 1997 Annual Operating Rept for 1997 - Rept of Changes,Tests & Experiments ML20249B7101997-12-31031 December 1997 Navigating for Our Future Dairyland Power 1997 Annual Rept. W/O Ltr ML20138B7771997-04-25025 April 1997 Corrected Page 8 of SE for Amend 69 to La Crosse Boiling Water Reactor License ML20137R7731997-04-11011 April 1997 Safety Evaluation Approving Changes to QAP Description ML20149K2071996-12-31031 December 1996 Conquering New Frontiers,Dairyland Power Cooperative 1996 Annual Rept ML20135C3901996-12-31031 December 1996 Annual Rept for 1996 - Rept of Changes,Tests & Experiments ML20132F8721996-10-31031 October 1996 Revised LACBWR Decommissioning Plan ML20134M2531996-02-20020 February 1996 Revised Rev 11 to QA Program Description ML18012A9001995-12-31031 December 1995 Annual Rept - 1995 of Changes,Tests & Experiments. W/ 960220 Ltr ML18011B1461995-04-20020 April 1995 LER 95-001-00:on 950417,noted That HPSW to Containment Building Isolated.Caused by Momentary LOP Due to Operational Test of 1A Edg.Procedures for Test Being Modified to Include Instructions to Verify Value Being open.W/950420 Ltr ML20056E2631993-08-10010 August 1993 LACBWR Containment Bldg Structural Analysis. W/One Oversize Drawing ML20056E2621993-07-31031 July 1993 Nonproprietary Analysis of Potential Blast Effects on LACBWR Reactor Bldg Due to 16 Inch Natural Gas Pipeline Failure,Suppl Analysis for Fast Closing Valve ML20127D3901993-01-13013 January 1993 SE Supporting Amend 67 to License DPR-45 ML20128K6011992-12-31031 December 1992 Corrected App a Re Std Format for Reporting Number of Personnel & man-rem by Work & Job Function,To Annual Rept for 1992 - Rept of Changes,Tests & Experiments ML20128D3421992-12-31031 December 1992 LACBWR Annual Rept 1992 ML20062B4761990-09-30030 September 1990 Monthly Operating Rept for Sept 1990 for LACBWR ML20248D0941989-08-31031 August 1989 Monthly Operating Rept for Aug 1989 for LACBWR ML20245G6571989-07-31031 July 1989 Monthly Operating Rept for Jul 1989 for LACBWR ML20245F9681989-06-30030 June 1989 Monthly Operating Rept for June 1989 for LACBWR ML20245J7351989-04-26026 April 1989 Safety Evaluation Supporting Amend 65 to License DPR-45 ML20245F8241989-02-28028 February 1989 Monthly Operating Rept for Feb 1989 for La Crosse Bwr.W/ ML20235S2441989-02-16016 February 1989 Suppl to 880104 Special Rept Re Inoperability of High Pressure Svc Water Diesel 1B.Fuel Supplu Sys Was Source of Problem.Fuel Supply Sys Will Be Replaced W/Above Ground Tanks for Both Diesels ML20245F7771989-01-31031 January 1989 Monthly Operating Rept for Jan 1989 for LACBWR ML20246H8771988-12-31031 December 1988 1988 Dairyland Power Cooperative Annual Rept ML20205T1271988-10-31031 October 1988 Monthly Operating Rept for Oct 1988 for La Crosse Bwr.W/ ML20151T0991988-08-0808 August 1988 Safety Evaluation Supporting Approval of Util Rev 10 to Emergency Plan ML20150D7051988-07-0808 July 1988 Safety Evaluation Supporting Rev 10 to Emergency Plan ML20155F9161988-05-31031 May 1988 Safety Evaluation Supporting Amend 62 to License DPR-45 ML20151G0591988-04-11011 April 1988 Safety Evaluation Supporting Amend 60 to Provisional License DPR-45 ML20148C3941988-03-15015 March 1988 Safety Evaluation Supporting Amend 59 to License DPR-45 ML20149G0711988-01-0404 January 1988 Safety Evaluation Supporting Amend 58 to License DPR-45 ML20147A9731987-12-31031 December 1987 Decommissioning Plan ML20149J3441987-12-31031 December 1987 LACBWR Annual Rept 1987 ML20195D7811987-12-31031 December 1987 1987 Dairyland Power Cooperative Annual Rept ML20237C6781987-11-30030 November 1987 Special Rept:On 871118,internal Portion of Fire Suppression Water Sys Removed from Svc to Replace Section of Piping.On 871120,piping Successfully Hydrostatically Tested & Fire Suppression Sys Returned to Svc ML20236W2731987-11-23023 November 1987 Special Rept:On 871028,following Initiation of 24 H Run for 18-month Diesel Generator Test,Emergency Diesel Generator 1B Stopped Running.No Cause for Trip Determined.Procedure Will Be Revised So Alarm Conditions Tested Before Run ML20236X0081987-11-18018 November 1987 Special Rept Re Inoperability of Fire Suppression Water Sys. Internal Portion of Sys Removed from Svc on 871118 to Replace Section of Piping.Initially Reported on 871118.Plant Permanently Shut Down & Reactor Defueled ML20234C3931987-10-20020 October 1987 Rev 5 to QA Program Description ML20151B2351987-10-20020 October 1987 Revised Rev 5 to QA Program Description ML20235R0531987-09-30030 September 1987 Determination of Potential Radiological Consequences to Members of Public from Fuel Handling Accident at La Crosse Nuclear Facility ML20235B5711987-09-15015 September 1987 Safety Evaluation Supporting Amend 57 to License DPR-45 1999-04-30
[Table view] |
Text
_ _ - _ - _ - - - _
OOa vy ;
- l.
.8" n NUCLEAR REGULATORY COMMISSION I
[ . WASHINGTON, D, C. 20655
, k*****) .
SAFETY EVALUATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION SUPPORTING AMENDMENT NO. 65 TO POSSESSION-0NLY LICENSE NO. DPR-45 o
LA CROSSE BOILING WATER REACTOR (LACBWR)
DOCKET NO. 50-409
1.0 INTRODUCTION
On April 27, 1987, Dairyland Power Cooperative (DPC) announced that the La Crosse Boiling Water Reactor (LACBWR) would be permanently shutdown because of economic reasons and on April 30, 1987 the shutdown was completed. On June 12, 1987, all fuel had been removed from the reactor and stored in the Fuel Element StorageWell(FESW). By letter dated May 22, 1987, DPC requested that Provisional License No. DPR-45 for LACBWR be amended to a possession-only status. Amendment No. 56 issued on August 4, 1987 established the possession-only license status.-
By letter dated December 21, 1987, as revised February 22, 1988 and October 13, ;
1988 DPC submitted a proposed decommissioning plan and proposed SAFSTOR '
TechnicalSpecifications(TS). By letter dated February 15, 1989 DPC requested !
early action on the proposed SAFSTOR TS related to fuel storage for the diesel j fire pumps.
2.0 EVALUATION As an operating nuclear power plant, LACBWR had approved operational TS, .
I meeting the requirements of 10 CFR 50.36 and 50.Ma. Since the reactor has !
been permanently shutdown and now has a possession-only license, many of these
+
TS may be revised. In this proposed amendment DPC proposed to amend the TS requirements for storage of fuel for the fire pump diesel engines to accommodate the installation and use of new fuel tanks. l In its February 22, 1988 submittal DPC proposed the following TS on diesel fuel i storage to demonstrate that fire pump diesel engines would be operable:
"Each fire pump diesel engine shall be demonstrated OPERABLE (a) At least once per 31 days by verifying that the fuel storage tank for A unit contains at least 270 gallons of fuel or for B unit contains at least 108 gallons of fuel."
This proposed TS would allow a minimum of 270 gallons of fuel for the A unit diesel engine tank or 108 gallons in the B unit tank.
8905040236 890426 PDR N
P ADOCK 05000409 PNU
. l In its February 15, 1989 submittal DPC proposed early action on this TS because two new tanks of 265 gallon capacity each are being installed to replace the older differently sized tanks. OPC now proposes that the TS for diesel engine fuel storage read as follows:
l 1
"Each fire pump diesel engine shall be demonstrated OPERABLE (a) At least once per 31 days by verifying that the fuel storage tank for A unit contains at least 150 gallons of fuel and for B unit !
contains at least 150 gallons of fuel."
This proposed TS would require 150 gallons'of fuel in both tanks and is therefore l more conservative than the February 22, 1988 proposed TS.
DPC has stated that each fire pump diesel consumes a maximum of 10 gallons of fuel per hour. The 150 gallons of fuel for each diesel engine would therefore allow each engine to operate for 15 hours1.736111e-4 days <br />0.00417 hours <br />2.480159e-5 weeks <br />5.7075e-6 months <br /> without refueling. We agree that this is an adequate running time for most emergencies and is sufficient time to
, replenish the fuel supply from an existing 20,000 gallon fuel tank located j onsite. !
3.0 ENVIRONMENTAL CONSIDERATION
i This amendment involves a change to a surveillance requirement for diesel engine fuel. - An Environmental Assessment and Finding of No Significant Impact .
has been published in the FEDERAL REGISTER on April 24, 1989 (54 FR 16437). !
Based on the Environmental Assessment the Comission concluded that the proposed amendment will not have a significant effect on the quality of the human environment.
4.0 CONCLUSION
The Commission has determined that this amendment involves no significant hazards consideration because it results in conservative requirements for the storage of fuel for fire pump diesel engines and allows the installation and use of new, more reliable fuel tanks.
The staff has concluded, based on the considerations discussed above, that:
(1) there is reasonable assurance that the health and safety of the public will not be ende,gered by operation in the proposed manner, and (2) such activities will be conducted in compliance with the Comission's regulations and the issuance of this amendment will not be inimical to the common defense and security nor to the health and safety of the public.
Principal Contributor: Peter B. Erickson Dated: April 26, 1989 1