ML18012A900

From kanterella
Jump to navigation Jump to search
Annual Rept - 1995 of Changes,Tests & Experiments. W/
ML18012A900
Person / Time
Site: La Crosse File:Dairyland Power Cooperative icon.png
Issue date: 12/31/1995
From: Berg W, Green W, Johnsen M
DAIRYLAND POWER COOPERATIVE
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
LAC-13533, NUDOCS 9603040267
Download: ML18012A900 (8)


Text

CATEGORY 1I REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:9603040267 DOC.DATE: ~ :~

NOTARIZED: NO DOCKET I FACIL:50-409 La Crosse Boiling Water Reactor, Dairyland Power Coop 05000409 AUTH.NAME AUTHOR AFFILIATION GREENIW.R.

Dairyland Power Cooperative JOHNSEN,M.N.

Dairyland Power Cooperative BERG,W.L Dairylard Power Cooperative RECIP.NA'Ir'ECIPIENT AFFILIATION

SUBJECT:

"Annual Rept 1995 of Changes, Tests 6 Experiments."

W/

(996022

) Itt.

DISTRIBUTION CODE:

IE47D COPIES RECEIVED:LTR i

ENCL J SIZE:

TITLE: 50.59 Annual Report of Changes, Tests or Experiments Made W

NOTES:License Exp date in accordance with 10CFR2,2.l09(1/28/75).

Conversion App 5/25/72.

FCLB/Gaskin,C. icy.

T ut Approv 05000409 RECIPIENT ID CODE/NAME DRPM/PDND INTERNAL ILE CENTE EXTERNAL: NOAC NOTES:

COPIES LTTR ENCL 1

0 1

1 1

1 1

1 RECIPIENT ID CODE/NAME FAIRTILE,M RGN3 FILE 01 NRC PDR COPIES LTTR ENCL 1

1 1

1 1

1 D

N NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE!

CONTACT THE DOCUMENT CONTROL DESK4 ROOM OWFN 5D-5(EXT. 415-2083)

TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED1 TOTAL NUMBER OF COPXES REQUIRED:

LTTR 7

ENCL 6

p 'OAIRYLANO O

COOPERATIVE 3200 EASTAVE. SO.

~ PO. BOX 817

~ LACROSSE, WISCONSIN54602-0817 (608) 788-4000 FAX NO. (608) 787-1420 WILLIAML. BERG General Manager February 20', '996 In reply, please refer to LAC-13533 DOCKET NO. 50-409 Document Control Desk U. S. Nuclear Regulatory Commission Washington, DC 20555 Gentlemen:

SUBJECT:

Dairyland Power Cooperative La Crosse BoilingWater Reactor (LACBWR)

Possession-Only License No. DPR-45 Annual Re ort for 1995-Re ortofChan es Tests and Ex eriments

REFERENCES:

(1) LACBWRTechnical Specification, Section 6.8.1.1 (2) 10 CFR 50.59(b)

In accordance with Reference 1, we are submitting the Annual Report covering the radiological exposure summary.

Also included are briefdescriptions offacilitychanges, including summaries oftheir safety evaluations, as required by Reference 2. There were no experiments or tests performed during 1995.

Ifthere are any questions concerning this report, please contact us.

Sincerely, DAIRYLANDPOWER COOPERATIVE WLB:WRG:dh Enclosures WilliamL. Berg, General anager cc:

Hub Miller,NRC Regional Administrator, Region III Morton Fairtile, NRC Project Manager P

rg'g(

r, w~

I'g 9603040267 95i23i PDR ADOCK 0500040'P R

PDR gp

La Crosse BoilingWater Reactor (LACBWR) a~

C Annual Report - 1995 Prepared by WilliamR. Green and Michael N. Johnsen Technical Support Engineers POSSESSION-ONLY LICENSE NO. DPR-45 Dairyland Power Cooperative 3200 East Avenue South La Crosse, WI 54602-0817 FI

N F

AN HH TB AND~ERMENT 1995 FACILITYCHANGE The followingFacility Changes, which did not require prior NRC approval, were physically completed in 1995. A summary ofthe safety evaluations performed in accordance with 10 CFR 50.59 type criteria is included. It was determined that there were no unreviewed safety questions for these facilitychanges, 04-94-04 REMOVALOF WASTE TREATl4KNTBUILDINGULTRASONIC SINK This equipment was no longer used at the I.ACBWRfacilityand its removal had no effect on safety.

04-95-05 INSTALLATIONOF NEW DRY CLEANER Replaces existing equipment with more modern and environmentally acceptable equipment and has no effect on safety as it relates to a plant in SAFSTOR.

19-95-20 ADD SAFE. Y CAGE TO LADDER Installed for personnel safety. Does not affect the design ofplant structures, systems or components related to the safe storage ofthe fuel.

25-94-06 INSTALLATIONOF COMPUTER COMMUNICATIONSLINEBETWEEN LACBWRPLANTAND ADMINISTRATIONBUILDING Installation ofthe line allowed LACBWRto interconnect with the Dairyland Power Cooperative computer network. Has no effect on any plant related structures, systems or components associated with SAFSTOR.

37-93-19 REMOVALOF CONTAINMENTBUILDINGMEZZANINELEVELSAMPLE SINK Samples from Main Steam, Feedwater and Shutdown condensers are no longer required.

Removal ofthe sample sink and associated piping has no efFect on design or function ofany structures, systems or components associated with SAFSTOR.

68-95-06 WASTE DISPOSAL BUILDINGHOT WATERHEATERREMOVAL There was no justification for replacement ofthis water heater when it failed, and its removal has no effect on structure, system or components associated with SAFSTOR.

68-95-07 81-94-04 87-95-19 INSTALLISOLATIONVALVEINWELLWATER SUPPLY TO MULTIZONE AIRCONDITIONER.

This isolation valve was installed to facilitate maintenance on the condenser section ofthe Multizone AirConditioner and has no effect on structures, systems or components associated with SAFSTOR.

INSTALLATIONOF NEW TELEPHONE EQUIPMENT Modernization ofthe phone system, providing enhanced reliabilityand function of the plant telephone system.

ADDITIONALSECURITY LIGHTINGAROUND PROTECTED AREA Increase light in identified areas for security. Minor load change with no effect on plant electrical system.

DES RIPTION OF CHANGES TESTS AND EXPERIMENTS - (cont'd)

TESTS There were no tests conducted during 1995.

EXPERIMENTS There were no experiments conducted during 1995.

1995 APPENDIX A STANDARDFORMATFOR REPORTING NUMBEROF PERSONNEL ANDMAN-REMBYWORKANDJOB FUNCTION

¹mber ofPersonnel (>100 mrem)

Total Man-Rem Work 2 Job Function REACTOR OPERATIONS/SURVEILLANCE Maintenance Personnel Operating Personnel Health Physics Personnel Supervisory Personnel Engineering Personnel Station Employees Utility:

. Contract Employees

'Workers and Others Station.

Employees 0.304 1.404 0.729 0.231 0.007

,, Utility-Einployees 0.000 0.000 0.000 0.000 0.002 Contract; Workers'and'-'the'rs" 0.190 0.000 0.000 0.000 0.000 ROUTINE MAINTENANCE Maintenance Personnel Operating Personnel Health Physics Personnel Supervisory Personnel Engineering Personnel 0.043 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 INSERVICE INSPECTION Maintenance Personnel Operating Personnel Health Physics Personnel Supervisory Personnel Engineering Personnel 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 SPE IALMAINTENANCE Maintenance Personnel Operating Personnel Health Physics Personnel Supervisory Personnel Engineering Personnel 14 0

0 0

0 0.273 0.410 0.076 0.140 0.013 0.000 0.000 0.000 0.000 0.078 3.586 0.000 0.020 0.000 0.000

~

~

~

~

4 I

~

~

a

~ 1

~

~

~

~

~

~

~

~ ~

~.

~

~

~

~

~

~

~

~

~

I I

I I e

I I I I I '

III I III I III I III I III I III I III I III I III I III I III

~

~

~ o'

~

~

~

~

I I II I III I III I III I III I III I III I III I III I III I I II I III I III I III I III

~

s s

~

~

~

~

~ '

I '

i

~ I I i I

I ll I I I I I III I III I ill

~

~

~

I I

~

~

~

II

~ ~

~

4 ~