Text
E,
- 3m9
- ek y gm k
'D DA/RYLAND hhh[~COOPERAT/VE PO DOX817
- 2615 EAST AVE SO. LACROSSE, WISCONS (608) 788 4000 JAMES W. TAYLOR
' Gsneral Manager (RJop)yy pg j
November 30, 1987 In reply, please L!Z refer to LAC-12451
- .. 3 h.
w:
.~
DOCKET NO. 50-409 g
l Mr. A. Bert Davis, Regional Administrator U. S. Nuclear Regulatory Commission Directorate of Regulatory Operations Region'III
'799 Roosevelt Road Glen Ellyn, IL 60137 l
Dear Mr. Davis:
SUBJECT:
Dairyland Power Cooperative La Crosse Boiling Water Reactor (LACBWR)
Provisional Operating License No. DPR-45 Special Report
REFERENCES:
(1) LACBWR Technical Specifications, Section 4.2.18.1 (2) 'LACBWR Technical Specifications, Section 6.9.2-(3) DPC Letter, Taylor to Davis, LAC-12439, November 18, 1987.
In accordance with References 1 and 2, this letter serves as the follow-up to the Special Report submitted in Reference 3.
The internal portion of the fire suppression water system was removed from service at 0630 on November 18, 1987 in order to replace a section of piping. The two diesel-driven High Pressure Service Water Pumps control switches were turned off. The procedure controlling the internal fire suppression system removal from service states the pumps should be started if a fire occurs. Hoses were laid from the yard hydrants to areas inside the plant to provide backup fire suppression capability prior to removing the internal portion of the system from service.
A tee with an approximately 8 foot section of HPSW piping was replaced.
The piping'was successfully hydrostatically tested on November 20, 1987. The fire suppression system was returned to service at 1525 on November 20, 1987.
The plant has been permanently shut down and the reactor defueled.
'8712220d69 871130 DECA PCl-39
~
pvg7 PDR ADOCK 05000409 i
Ss DCD 4,
t O
j y
-)
e Mr. A. Bert Davis LAC-12451 Page 2 November 30, 1987 If there are any questions, please contact us, Sincerely, DAIRYLAND POWER COOPERATIVE
,E James W. Taylor General Manager JWT:LSG:sks cc: Document Control Desk U. S. Nuclear Regulatory Commission Washington, DC 'z0555 Mr. Peter B. Erickson, LACBWR Project Manager Division of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Mr. Ken Ridgway, NRC Resident Inspector I