9 8-The new DTS Section 6 ADMINISTRATIVE CONTROLS. like the old TS. properly defines directly or through reference to the OAPD:
(1) plant staff responsibilities, qualifications and training. (2) facility crganization.
(3) shift crew composition. (4) safety review committees. (5) reporting.
(6) plant procedures programs, and (7) radiation protection programs.
All of the Section 6 changes are discussed in the following paragraphs:
Old Subsection 6.1 RESPONSIBILITY.
This subsection was retained except for a change in a management title from " Shift Supervisor" to " Control Room Operator." With the plant in a permanently defueled status the former Shift Supervisor position, formerly part of the operating crew, has been replaced by the Control Room Operator position.
The Shift Supervisor position is now a facility management position and is described in the OAPD.
The Control Room Operator is responsible for Control Room command functions and is trained and qualified to safely maintain the plant and stored fuel.
Therefore, these title changes are acceptable as the incumbents are qualified by training and experience to perform the defined tasks.
The subsection retained its old number and title and was directly transferred from the old TS to the DTS.
Based on the above. the staff concludes that the new DTS Subsection 6.1 is acceptable.
Old Subsection 6.2 ORGANIZATION.
This subsection retains the same number and title in the DTS.
All references to the " Shift Supervisor" position 1
were removed and replaced by " Control Room Operator." This change is discussed and justified in DTS Subsection 6.1 above.
In DTS Subsection 6.2.J.1(b) the following phrase was properly added to the last sentence:
.when fuel assemblies are stored in the Fuel Element Storage Well."
In old Subsection 6.2.1.1(2) which is retained, the following tyaographical error is corrected. "244eriod" becomes "24-hour period."
Otlerwise. this paragraph remains unchanged.
Old Subsection 6.2.1.1(e) has been retained but properly relocateo as a footnote.
Based on the above, the staff concludes that the new DTS Subsection 6.2 is acceptable.
Old Subsection 6.3 FACILITY STAFF OllALIFICATIONS.
This subsection was unchanged. retained its old number and title and was directly transferred from the old TS to the DTS and is therefore acceptable.
Old Subsection 6.4 TRAINING.
The licensee proposed relocation of the requirements of this old subsection to the Training Program.
10 CFR 50.36 does not require the training Program to be a part of the Technical Speci fications.
Changes to the Training Program will be controlled by the requirements of 10 CFR 50.59, as required by the NRC's order of August 7, 1991, authorizing decommissioning.
The Training Program is fully enforceable and ins)ectable.
Based on the above, the staff concludes that the relocation of tie training requirements in the old TS to the Training Program is acceptable.
9704290271 97042S PDR ADOCK 05000409 P