|
---|
Category:MEETING MINUTES & NOTES--CORRESPONDENCE
MONTHYEARML20217H1001999-10-13013 October 1999 Summary of 990930 Meeting with Util in Rockville,Md Re Proposed Five Percent Power Uprate for Plant,Unit 1.List of Meeting Participants & Licensee Meeting Handout Encl ML20210P1611999-08-0404 August 1999 Summary of 990415 Meeting with Utils in Knoxville,Tn Re Status of Mark 3 Program Designed to Determine & Validate Submerged Structure Drag Loads of Newley Installed ECCS Strainers at Perry,Grand Gulf & Clinton Facilities ML20196J2351999-06-29029 June 1999 Summary of 990617 Meeting with B&Wog & FTI Re B&Wog Emergency Operating Procedure Program.List of Meeting Attendees & Presentation Slides Encl ML20206P0831999-05-12012 May 1999 Summary of 990428 Meeting with Firstenergy Nuclear Operating Co & Duquesne Light Co in Rockville,Maryland Re Proposed Asset Transfer Between Firstenergy Corp & Dl & Resulting 10CFR50.80 License Transfer of Dl Ownership Interest ML20206D6031999-04-30030 April 1999 Summary of 990318 Meeting with Firstenergy Nuclear Operating Co in Rockville,Maryland Re Review Schedule & Content of Proposed QA Topical Rept for Both Davis-Besse & Perry Facilities.List of Meeting Attendees Encl ML20205D4831999-03-25025 March 1999 Summary of 990222 Public Hearing with Util Re Gathering Addl Info Related to Two Petitions Filed Pursuant to 10CFR2.206 by Ucs Re Operation of River Bend Station & Perry Nuclear Power Plant.List of Attendees & Transcript of Hearing Encl ML20198S3061999-01-0505 January 1999 Summary of 981204 Meeting with Util in Rockville,Md to Discuss Proposed Changes to Design & Licensing Basis of Containment Isolation Provisions for Feedwater Sys ML20198D5801998-12-15015 December 1998 Summary of 981119 Meeting with Util in Rockville,Md to Discuss Proposed Changes to Design & Licensing Basis of Containment Isolation Provisions for Feedwater Sys ML20202D3521998-12-0909 December 1998 Summary of 981123 Petition Review Board Meeting Re 2.206 Petition on Perry Unit 1,submitted on 981109 by Ucs.Meeting Attendees Listed ML20195F4011998-11-13013 November 1998 Summary of 980915 Meeting with NEI License Renewal Task Force in Rockville,Md Re Prioritization of Generic License Renewal Issues for Resolution.List of Meeting Attendees, Resolution Criteria & List of Issues Encl ML20155H3801998-10-29029 October 1998 Summary of 980915 Meeting with Util & Contractor Polestar Applied Technology,Inc in Rockville,Md Re Revised Accident Source Term for Perry Pilot Plant Review.List of Meeting Participants & Nonproprietary Handouts Encl ML20154J3671998-10-13013 October 1998 Summary of 980910 Meeting W/Cleveland Electric Illuminating Co in Rockville,Md Re Licensee Proposed Changes to Design & Licensing Basis to Containment Isolation Provisions for Feedwater System.List of Attendees Encl ML20154C4771998-10-0202 October 1998 Summary of 980908 Meeting with Cleveland Electric Illuminating Co,Entergy Operations,Inc & Illinois Power Co Re Joint Effort to Propose TSs to Reduce Requirements on Secondary Containment Integrity During Refueling ML20199L2071997-11-24024 November 1997 Trip Rept of 971006 Visit to Perry Site to Gather Info on New & Unique Strainer Design Installed at Perry During Most Recent Outage ML20211A0161997-09-16016 September 1997 Summary of 970828 Meeting W/B&Wog Re Mgt of Aging Effects for Reactor Vessel Internals & Activities Related to Baffle Bolting Integrity Issues.List of Attendees & Their Affiliation & Handouts Encl ML20141E7701997-05-14014 May 1997 Summary of 970508 Meeting W/Cei in Rockville,Md Re Priorities & Schedules of Licensing Issues for Plant,Unit 1. List of Meeting Attendees & Meeting Handout Encl ML20140H4881997-05-0707 May 1997 Provides Summary of 970401 Telcon Between NRC & BWROG Re Topical Rept NEDC-31858P,Rev 2, BWROG Rept for Increasing MSIV Leakage Rate Limits & Elimination of Leakage Control Sys ML20138D9441997-04-23023 April 1997 Summary of 970324 Meeting W/Licensee in Rockville,Md Re ECCS suction-strainer Program for Perry Npp,Unit 1.List of Attendees & Viewgraphs Encl ML20134P2561997-02-20020 February 1997 Summary of Operating Reactors Events Briefing 97-01 on 970212.List of Attendees,Significant Elements of Discussed Events & Reactor Scram Statistics for Listed Wks Encl ML20134A9621997-01-22022 January 1997 Summary of 961204 Meeting W/Util in Rockville,Md to Discuss Proposed Merger Between Centerior Energy Corporation & Ohio Edison Company.List of Attendees & Info Handouts Encl ML20147A7261997-01-22022 January 1997 Summary of 960910 Meeting W/Util in Rockville,Md to Discuss Revised Eal.List of Attendees Encl ML20129K3791996-11-21021 November 1996 Summary of 961016 Meeting W/Dpc at Plant Re Ongoing Current Licensing Issues & Safety Initiatives at Three Nuclear Stations.Meeting Attendees,Agenda & Handouts Encl ML20129G3141996-10-23023 October 1996 Summary of Operating Reactors Event Briefing 96-12 on 961016.List of Attendees,Significant Elements of Discussed Events & Reactor Scram Statistics for Wks Ending 960922,29 & 1006 & 13 Encl ML20062J8701993-11-0808 November 1993 Summary of 931028 Meeting W/Licensee in Rockville,Md Re Licensee Presentation of Summary of Plant Course of Action Plan to NRC Mgt ML20057F1471993-10-0606 October 1993 Summary of Operating Reactors Events Meeting 93-37 on 930929 ML20057F1271993-10-0505 October 1993 Summary of 930902 Meeting W/Util in Rockville,Md Re NRC 930405 Safety Evaluation of Rev 3 to IST Program.List of Attendees Encl ML20057D0761993-09-27027 September 1993 Summary of 930903 Meeting W/Util in Rockville,Md Re Ways Util Might Improve Quality & Completeness of Plant Licensing Submittals.List of Meeting Attendees & List of Specific Licensing Submittals Discussed During Meeting Encl ML20149D6051993-09-15015 September 1993 Summary of 930708 Region III Annual Training Managers Conference in Glen Ellyn,Il.Purpose of Meeting to Provide Forum for Discussion on Rev 7 of Operator Licensing Examiner Stds & to Discuss Operator Licensing Issues ML20056D9841993-05-18018 May 1993 Summary of Operating Reactors Events Meeting 93-17 on 930512 ML20217C5121991-07-0303 July 1991 Summary of Operating Reactors Events Meeting 91-12 on 910626 ML20247R0161989-09-21021 September 1989 Summary of Operating Reactors Events Meeting 89-34 on 890920 to Brief Senior Managers & Regional Offices on Selected Events That Occured Since Last Meeting ML20247E3641989-09-0606 September 1989 Summary of 890717 Meeting W/Numarc,B&W Owners Group & Representatives of Lead Plants Re Status of STS Amends & Outstanding Issues Associated W/Lead Plant STS Submittals ML20247D5291989-09-0505 September 1989 Summary of Operating Reactors Events Meeting 89-31 on 890830.Significant Event for Input Into NRC Performance Indicator Program Identified ML20246K2171989-08-24024 August 1989 Summary of Operating Reactors Events Meeting 89-30 on 890823 Re Reactor Trip W/Multiple Instrumentation & Equipment Failures at DC Cook Unit 2 on 890814 & Auxiliary Feedwater Flows at Hb Robinson ML20247K2471989-08-24024 August 1989 Trip Rept of Staff 890718-19,21 & 0801-02 Visits to Nuclear Power Plants to Gather Info Re Industry Actions to Address Loss of Oil Malfunctions of Rosemount Models 1153 & 1154 Transmitters ML20245G5421989-08-0303 August 1989 Summary of Operating Reactors Events Meeting 89-28 on 890802.List of Attendees,Events Discussed & Significant Elements of Events & Summaries of Reactor Scrams for Wks Ending 890723 & 30 Encl ML20248B5171989-08-0303 August 1989 Summary of 890725 Interface Meeting W/Util in Birrmingham,Al Re Sonopco/Util Corporate Organization Including Generic Activities & Initiatives Re Plants.Agenda & Viewgraphs Encl ML20246P7771989-07-13013 July 1989 Summary of Operating Reactors Events Meeting 89-26 on 890712.Events Discussed & Significant Elements of Events Presented in Encl 2.List of Attendees Also Encl ML20246F8691989-06-22022 June 1989 Summary of Operating Reactors Events Meeting 89-24 on 890621.On 890615,potential Unmonitored Primary Coolant Release Path to Environ Discovered at WPPSS-2.On 890617,loss of Offsite Power Occurred at Brunswick,Unit 2 ML20245G6411989-06-15015 June 1989 Summary of Operating Reactors Events Meeting 89-23 on 890614.On 890607,multiple Electrical Distribution Sys Problems Occurred at Oconee,Units 1,2 & 3.On 890610,unit Power Signal Caused Scram ML20245F2221989-06-0808 June 1989 Summary of Operating Reactors Events Meeting 89-21 on 890531.List of Attendees & Related Info Encl ML20245A3851989-05-30030 May 1989 Summary of Operating Reactors Events Meeting 89-20 on 890524.List of Meeting Attendees & Viewgraphs Encl ML20247M7961989-05-24024 May 1989 Summary of 890502 Meeting W/Util,Sargent & Lundy & Rl Cloud Assoc in Rockville,Md Re Nonlinear Piping Analyses Used to Justify Removal of Snubbers & Pipe Supports.List of Attendees & Presentation by Licensee & Contractors Encl ML20247K0901989-05-23023 May 1989 Summary of 890517 Meeting W/Inpo Re Similarities & Differences Between Performance Indicator Programs.Detailed Discussion Encl ML20247J7051989-05-19019 May 1989 Summary of 890501 Meeting w/C-E Owners Group in Rockville,Md Re Diverse Emergency Feedwater Actuation Sys,Per 10CFR50.62 Requirements.List of Meeting Attendees & Viewgraphs Encl. Record Copy ML20247J6991989-05-19019 May 1989 Summary of 890501 Meeting w/C-E Owners Group in Rockville,Md Re Diverse Emergency Feedwater Actuation Sys,Per 10CFR50.62 Requirements.List of Meeting Attendees & Viewgraphs Encl ML20247D3441989-05-16016 May 1989 Summary of Operating Reactors Events Meeting 89-19 on 890510.List of Attendees,Events Discussed & Significant Elements of Events & Rept of long-term Followup Assignments & Summary of Scrams for Wk Ending 890507 Encl ML20247K1011989-05-16016 May 1989 Summary of 890517 Meeting W/Inpo in Bethesda,Md Re Similarities & Differences Between INPO & NRC Performance Indicators ML20246L7281989-05-0505 May 1989 Summary of 890503 Meeting W/Util in Rockville,Md Re Containment Vessel Structural Integrity Tech Specs for Plants.List of Attendees & Licensee Presentation Encl ML20246C3261989-05-0404 May 1989 Summary of Operating Reactors Events Meeting 89-18 on 890503 1999-08-04
[Table view] Category:MEETING SUMMARIES-INTERNAL (NON-TRANSCRIPT)
MONTHYEARML20217H1001999-10-13013 October 1999 Summary of 990930 Meeting with Util in Rockville,Md Re Proposed Five Percent Power Uprate for Plant,Unit 1.List of Meeting Participants & Licensee Meeting Handout Encl ML20210P1611999-08-0404 August 1999 Summary of 990415 Meeting with Utils in Knoxville,Tn Re Status of Mark 3 Program Designed to Determine & Validate Submerged Structure Drag Loads of Newley Installed ECCS Strainers at Perry,Grand Gulf & Clinton Facilities ML20196J2351999-06-29029 June 1999 Summary of 990617 Meeting with B&Wog & FTI Re B&Wog Emergency Operating Procedure Program.List of Meeting Attendees & Presentation Slides Encl ML20206P0831999-05-12012 May 1999 Summary of 990428 Meeting with Firstenergy Nuclear Operating Co & Duquesne Light Co in Rockville,Maryland Re Proposed Asset Transfer Between Firstenergy Corp & Dl & Resulting 10CFR50.80 License Transfer of Dl Ownership Interest ML20206D6031999-04-30030 April 1999 Summary of 990318 Meeting with Firstenergy Nuclear Operating Co in Rockville,Maryland Re Review Schedule & Content of Proposed QA Topical Rept for Both Davis-Besse & Perry Facilities.List of Meeting Attendees Encl ML20205D4831999-03-25025 March 1999 Summary of 990222 Public Hearing with Util Re Gathering Addl Info Related to Two Petitions Filed Pursuant to 10CFR2.206 by Ucs Re Operation of River Bend Station & Perry Nuclear Power Plant.List of Attendees & Transcript of Hearing Encl ML20198S3061999-01-0505 January 1999 Summary of 981204 Meeting with Util in Rockville,Md to Discuss Proposed Changes to Design & Licensing Basis of Containment Isolation Provisions for Feedwater Sys ML20198D5801998-12-15015 December 1998 Summary of 981119 Meeting with Util in Rockville,Md to Discuss Proposed Changes to Design & Licensing Basis of Containment Isolation Provisions for Feedwater Sys ML20202D3521998-12-0909 December 1998 Summary of 981123 Petition Review Board Meeting Re 2.206 Petition on Perry Unit 1,submitted on 981109 by Ucs.Meeting Attendees Listed ML20195F4011998-11-13013 November 1998 Summary of 980915 Meeting with NEI License Renewal Task Force in Rockville,Md Re Prioritization of Generic License Renewal Issues for Resolution.List of Meeting Attendees, Resolution Criteria & List of Issues Encl ML20155H3801998-10-29029 October 1998 Summary of 980915 Meeting with Util & Contractor Polestar Applied Technology,Inc in Rockville,Md Re Revised Accident Source Term for Perry Pilot Plant Review.List of Meeting Participants & Nonproprietary Handouts Encl ML20154J3671998-10-13013 October 1998 Summary of 980910 Meeting W/Cleveland Electric Illuminating Co in Rockville,Md Re Licensee Proposed Changes to Design & Licensing Basis to Containment Isolation Provisions for Feedwater System.List of Attendees Encl ML20154C4771998-10-0202 October 1998 Summary of 980908 Meeting with Cleveland Electric Illuminating Co,Entergy Operations,Inc & Illinois Power Co Re Joint Effort to Propose TSs to Reduce Requirements on Secondary Containment Integrity During Refueling ML20211A0161997-09-16016 September 1997 Summary of 970828 Meeting W/B&Wog Re Mgt of Aging Effects for Reactor Vessel Internals & Activities Related to Baffle Bolting Integrity Issues.List of Attendees & Their Affiliation & Handouts Encl ML20141E7701997-05-14014 May 1997 Summary of 970508 Meeting W/Cei in Rockville,Md Re Priorities & Schedules of Licensing Issues for Plant,Unit 1. List of Meeting Attendees & Meeting Handout Encl ML20140H4881997-05-0707 May 1997 Provides Summary of 970401 Telcon Between NRC & BWROG Re Topical Rept NEDC-31858P,Rev 2, BWROG Rept for Increasing MSIV Leakage Rate Limits & Elimination of Leakage Control Sys ML20138D9441997-04-23023 April 1997 Summary of 970324 Meeting W/Licensee in Rockville,Md Re ECCS suction-strainer Program for Perry Npp,Unit 1.List of Attendees & Viewgraphs Encl ML20134P2561997-02-20020 February 1997 Summary of Operating Reactors Events Briefing 97-01 on 970212.List of Attendees,Significant Elements of Discussed Events & Reactor Scram Statistics for Listed Wks Encl ML20134A9621997-01-22022 January 1997 Summary of 961204 Meeting W/Util in Rockville,Md to Discuss Proposed Merger Between Centerior Energy Corporation & Ohio Edison Company.List of Attendees & Info Handouts Encl ML20147A7261997-01-22022 January 1997 Summary of 960910 Meeting W/Util in Rockville,Md to Discuss Revised Eal.List of Attendees Encl ML20129K3791996-11-21021 November 1996 Summary of 961016 Meeting W/Dpc at Plant Re Ongoing Current Licensing Issues & Safety Initiatives at Three Nuclear Stations.Meeting Attendees,Agenda & Handouts Encl ML20129G3141996-10-23023 October 1996 Summary of Operating Reactors Event Briefing 96-12 on 961016.List of Attendees,Significant Elements of Discussed Events & Reactor Scram Statistics for Wks Ending 960922,29 & 1006 & 13 Encl ML20062J8701993-11-0808 November 1993 Summary of 931028 Meeting W/Licensee in Rockville,Md Re Licensee Presentation of Summary of Plant Course of Action Plan to NRC Mgt ML20057F1471993-10-0606 October 1993 Summary of Operating Reactors Events Meeting 93-37 on 930929 ML20057F1271993-10-0505 October 1993 Summary of 930902 Meeting W/Util in Rockville,Md Re NRC 930405 Safety Evaluation of Rev 3 to IST Program.List of Attendees Encl ML20057D0761993-09-27027 September 1993 Summary of 930903 Meeting W/Util in Rockville,Md Re Ways Util Might Improve Quality & Completeness of Plant Licensing Submittals.List of Meeting Attendees & List of Specific Licensing Submittals Discussed During Meeting Encl ML20149D6051993-09-15015 September 1993 Summary of 930708 Region III Annual Training Managers Conference in Glen Ellyn,Il.Purpose of Meeting to Provide Forum for Discussion on Rev 7 of Operator Licensing Examiner Stds & to Discuss Operator Licensing Issues ML20056D9841993-05-18018 May 1993 Summary of Operating Reactors Events Meeting 93-17 on 930512 ML20217C5121991-07-0303 July 1991 Summary of Operating Reactors Events Meeting 91-12 on 910626 ML20247R0161989-09-21021 September 1989 Summary of Operating Reactors Events Meeting 89-34 on 890920 to Brief Senior Managers & Regional Offices on Selected Events That Occured Since Last Meeting ML20247E3641989-09-0606 September 1989 Summary of 890717 Meeting W/Numarc,B&W Owners Group & Representatives of Lead Plants Re Status of STS Amends & Outstanding Issues Associated W/Lead Plant STS Submittals ML20247D5291989-09-0505 September 1989 Summary of Operating Reactors Events Meeting 89-31 on 890830.Significant Event for Input Into NRC Performance Indicator Program Identified ML20246K2171989-08-24024 August 1989 Summary of Operating Reactors Events Meeting 89-30 on 890823 Re Reactor Trip W/Multiple Instrumentation & Equipment Failures at DC Cook Unit 2 on 890814 & Auxiliary Feedwater Flows at Hb Robinson ML20248B5171989-08-0303 August 1989 Summary of 890725 Interface Meeting W/Util in Birrmingham,Al Re Sonopco/Util Corporate Organization Including Generic Activities & Initiatives Re Plants.Agenda & Viewgraphs Encl ML20245G5421989-08-0303 August 1989 Summary of Operating Reactors Events Meeting 89-28 on 890802.List of Attendees,Events Discussed & Significant Elements of Events & Summaries of Reactor Scrams for Wks Ending 890723 & 30 Encl ML20246P7771989-07-13013 July 1989 Summary of Operating Reactors Events Meeting 89-26 on 890712.Events Discussed & Significant Elements of Events Presented in Encl 2.List of Attendees Also Encl ML20246F8691989-06-22022 June 1989 Summary of Operating Reactors Events Meeting 89-24 on 890621.On 890615,potential Unmonitored Primary Coolant Release Path to Environ Discovered at WPPSS-2.On 890617,loss of Offsite Power Occurred at Brunswick,Unit 2 ML20245G6411989-06-15015 June 1989 Summary of Operating Reactors Events Meeting 89-23 on 890614.On 890607,multiple Electrical Distribution Sys Problems Occurred at Oconee,Units 1,2 & 3.On 890610,unit Power Signal Caused Scram ML20245F2221989-06-0808 June 1989 Summary of Operating Reactors Events Meeting 89-21 on 890531.List of Attendees & Related Info Encl ML20245A3851989-05-30030 May 1989 Summary of Operating Reactors Events Meeting 89-20 on 890524.List of Meeting Attendees & Viewgraphs Encl ML20247M7961989-05-24024 May 1989 Summary of 890502 Meeting W/Util,Sargent & Lundy & Rl Cloud Assoc in Rockville,Md Re Nonlinear Piping Analyses Used to Justify Removal of Snubbers & Pipe Supports.List of Attendees & Presentation by Licensee & Contractors Encl ML20247K0901989-05-23023 May 1989 Summary of 890517 Meeting W/Inpo Re Similarities & Differences Between Performance Indicator Programs.Detailed Discussion Encl ML20247J6991989-05-19019 May 1989 Summary of 890501 Meeting w/C-E Owners Group in Rockville,Md Re Diverse Emergency Feedwater Actuation Sys,Per 10CFR50.62 Requirements.List of Meeting Attendees & Viewgraphs Encl ML20247J7051989-05-19019 May 1989 Summary of 890501 Meeting w/C-E Owners Group in Rockville,Md Re Diverse Emergency Feedwater Actuation Sys,Per 10CFR50.62 Requirements.List of Meeting Attendees & Viewgraphs Encl. Record Copy ML20247D3441989-05-16016 May 1989 Summary of Operating Reactors Events Meeting 89-19 on 890510.List of Attendees,Events Discussed & Significant Elements of Events & Rept of long-term Followup Assignments & Summary of Scrams for Wk Ending 890507 Encl ML20247K1011989-05-16016 May 1989 Summary of 890517 Meeting W/Inpo in Bethesda,Md Re Similarities & Differences Between INPO & NRC Performance Indicators ML20246L7281989-05-0505 May 1989 Summary of 890503 Meeting W/Util in Rockville,Md Re Containment Vessel Structural Integrity Tech Specs for Plants.List of Attendees & Licensee Presentation Encl ML20246C3261989-05-0404 May 1989 Summary of Operating Reactors Events Meeting 89-18 on 890503 ML20246B5161989-04-28028 April 1989 Summary of 890419 Operating Reactors Events Meeting 89-16. List of Attendees & Handouts Encl ML20248K3761989-04-10010 April 1989 Summary of Operating Reactors Events Meeting 89-014 on 890405.List of Attendees,Events Discussed & Significant Elements of Events & Summary of Reactor Scrams for Wk Ending 890402 Encl 1999-08-04
[Table view] |
Text
- -_ __ ___
MAR I 91987 MEMORANDUM FOR: Harold R. Dent:n, Direct:r Office of Nuclear Reactor Regulation FROM: Gary M. Holahan, Director Operating Reactors Assessment Staff
SUBJECT:
SUMMARY
OF THE OPERATING REACTORS EVENTS MEETING ON MARCH 9,1987 - MEETING 87-06 On March 6, 1987, an Operating Reactor Events meeting (87-06) was held to brief the Office Director, the Division Directors and their representatives on events which occurred since our last meeting on March 2,1987. The list of attendees is included as Enclosure 1.
The events discussed and the significant elements of these events are presented ;
in Enclosure 2. Enclosure 3 provides a sunnary of those presented events that will be input to NRC's performance indicator program as significant events.
Af/
Gary M. Holahan, Director Operating Reactors Assessment Staff
Enclosures:
As stated cc w/ Encl.:
See Next Page DISTRIBUTION LCentral File [
NRC PDR ORAS Rdg Tarnoff Rdg w/o Enclosure ORAS Members A C:PWR:0R C:BWR:0 RAS FF DTONDI MJVIRGILIO GMH0tAHAN 3 ////87 J //7/87 3/ G87 J/jf/87
/\
oM, 0l P r
/y )v#p t(,C'#
b , [I V
%R "M822 gggm PDR
~
k4c : ; .g Harold R. Denton
- k cc: R. Vollner G. Edison J. Taylor H. Nicolaras C. Heltemes J. Stolz R. Starostecki P. Leech D. Ross W. Butler T. Murley, Reg. I J. Nelson Grace, Reg. II J. Keppler, Reg. III R. D. Martin, Reg. IV J. B. Martin, Reg. V W. Kane Reg. I S. Ebneter, Reg. I R. Walker, Reg. II C. Norelius, Reg. III E. Johnson. Reg. IV D. Kirsch, Reg. V H. Thompson F. Miraglia R. Bernero T. Speis W. Russell T. Novak F. Schroeder W. Houston B. Sheron B. Boger D. Crutchfield E. Rossi G. Lainas V. Benaroya W. Regan D. Vassallo E. Jordan J. Rosenthal R. Baer E. Weiss R. Hernan S. Showe S. Rubin G. Arlotto
r, YAE I 5195)
ENCLOSURE 1 LIST OF ATTENDEES OPERATING REACTORS EVENTS BRIEFING (87-06)
MARCH 9, 1987 NAME DIVISION NAME DIVISION G. Holahan NRR K. Wolley EPER M. Virgilio- NRR G. Edison NRR D. Tondi NRR R. Hernan NRR M. Caruso NRR W. Swenson NRR K. Eccleston NRR F. Cherny NRR R. Emch NRR G. Dick NRR D. Vassallo NRR S. Stern NRR L. Crocker NRR G. Murphy ORNL P. Leech NRR B. Boger NRR J. Jankovich NRR A. Dromerick IE M. Chiramal AE00 R. Baer IE J. Rosenthal IE R. Bernero NRR F. Schroeder NRR P. Gwynn OCM D. Tarnoff NRR
,I ENCLOSURE-2 t
0PERATING REACTORS EVENTS BRIEFING 87 MARCH 9, 1987 SIGNIFICANT EVENTS OCONEE 1, 2, AND 3 UNDERSIZED STEAM RELIEF VALVES ON STEAM SUPPLY LINES.T0 EFW TURBINE
- PERRY 1 REACTOR SCRAM AND HPCS INJECTION DUE TO LOSS 0F FEEDWATEP
3/10/87 OCONEE 1, 2 AND 3 - UNDERSIZED STEAM RELIEF VALVES ON STEAM SUPPLY LINES TO EFW TURBINES ,
MARCH 2, 1987 - (G. EDISON, NRR)
PROBLEM:
RELIEF VALVES WITHOUT SUFFICIENT CAPACITY INSTALLED ON MAIN STEAM PIPING AND AUXILIARY STEAM PIPING TO TURBINE-DRIVEN EMERGENCY FEEDWATER (TDEFW) PUMP CAUSE:
DEFICIENT ENGINEERING DESIGN t SIGNIFICANCE:
POTENTIAL TO DISABLE TDEFW TRAIN FUNCTIONAL CAPABILITY POTENTIAL FOR RUPTURE OF THE TDEFW STEAM SUPPLY HEADER DISCUSSION:
ON 2/27/87 DUKE POWER COMPANY COMPLETED AN ANALYSIS WHICH h SHOWED THE POTENTIAL FOR FAILURE OF THE TDEFW PUMP / PIPING BECAUSE OF POSSIBLE OVERPRESSURIZATION OF THE AUXILIARY STEAM SYSTEM THE WORST CASE SCENARIO ASSUMES THE FOLLOWING CONDITIONS:
- STATION BLACK 0UT CONDITIONS EXIST, I.E., LOSS OF 0FFSITE POWER AND ONSITE EMERGENCY POWER (KE0 WEE HYDRO PLANT)
- REACTOR TRIPPED: ISOLATE MAIN STEAM LINE
- MS-126 AND MS-129 CONTROL VALVES FAIL WIDE OPEN
- TDEFW PUMP HAS RECEIVED START SIGNAL
- NO CREDIT IN ANALYSIS GIVEN FOR STEAM LOADS; E.G., AIR EJECTORS, TDEFW EXHAUST TO ATMOSPHERE, HEATERS
- DEDICATED SAFE SHUTDOWN FACILITY STILL AVAILABLE
- INTERCONNECTION TO TDEFW OF SISTER UNITS AFTER MANUAL VALVE REALIGNMENT INTERIM MEASURES INCLUDE:
- CROSS-TIE AUXILIARY STEAM LINES BETWEEN THREE UNITS BY LOCKING OPEN AS-5 AND 2AS-5
- LOCKED CLOSED MS-126 AND MS-129 ON UNITS 1 AND 3; INSTALLING TRAVEL STOPS ON MS-129 ON UNIT 2 LONG-TERM CORRECTIVE MEASURE -- INCREASE RELIEF CAPACITY DUKE POWER COMPANY AND BECHTEL WERE THE ARCHITECT ENGINEERS DUKE IS RETRAINING STAFF DESIGN ENGINEERS FOLLOW-UP:
LICENSEE WILL PERFORM CORRECTIVE ACTIONS RESIDENT INSPECTOR WILL FOLLOW-UP ON CORRECTIVE ACTIONS
n
.p b g.
b 3MS-82 h
% NAl'yUrir$TR3 AM s upMV 3MS 83 h.f U
f e
M' C' 3MS-84 3MS-85 To 3MS 86 [ h 3MS-87 From Unit atmosphere l<j 3 startup.
! header 3AS9I 3AS-)0-3MS 89 93 3I __
O 3MS-139 3MS-90
[ 3MS-96 3MS 91 5[
l Trip Stop Governor
' valve valve valve To 3MS 92 M A* @ condensar I@, X X EFW ,
B' 3MS 93 3MS 94 3MS 95 steam 3MS 97 turbine 3RV-137 To 3MS 140 atmosphere OhYI Figure A10 3. Steam supply for the EFW steam turbine.
A10-5
9 M =?4 N e<4 8 $b M tio t; - . . .; & .h &~
~3 -
t WI~g6 Ia t4 A
--90E3
'f h 3+ec h t- D -
y -
k
= ,
M C
d o.
H E(
g al n
% 36 s "2 . . - . .
i s ,
O b
a L e s
(1 n
i A
l, M
S O
..../w- o ts W c w s t> +i C1 e l~r es.as k
v
(
2 b D D
= tow e.3 n
Q d
w y ,;, 2 4Lc o
n M b$
a-e o' W r
,-----..3 g u i . 44 I* ',
' w, O a . . . . . . v. . .'
D1
.. y O a
-D ^
F q
r' gO Z .P=
F2C
==w&
4 G 2&b3 seoo
r d
~
3/10/87 PERRY 1 - REACTOR SCRAM AND HPCS INJECTION DUE TO LOSS OF FEEDWATER MARCH 2, 1987 - (P. LEECH, NRR)
PROBLEM:
OPERATOR ERROR-INDUCED REACTOR TRIP COMPLICATED BY RCIC MALFUNCTION CAUSE:
OPERATOR ERROR LEVEL SWITCH MALFUNCTION SIGNIFICANCE:
SCENARIO MAY BE INDICATIVE OF POOR TROUBLESHOOTING /
MAINTENANCE PRACTICE DISCUSSION:
EMERGENCY RELIEF FROM HAVING RCIC SYSTEM OPERABLE HAD BEEN GRANTED FOR 30 DAYS STARTING 2/24/87 DUE TO UNRELIABLE OPERATION OF THE INBOARD STEAM ISOLATION VALVE AND ERRATIC WATER LEVEL INDICATIONS DURING INJECTION TESTS RCIC AUTO INJECTION WAS DISABLED, RCIC MANUAL INJECTION WAS AVAILABLE, PLANT OPERATING AT 28% POWER - OPERATORS INVESTIGATING A FAULTY LEVEL SWITCH ON HOT SURGE TANK, WHICH WAS CAUSING ERR 0NE0US TANK LOW LEVEL SIGNALS, JARRED ANOTHER LEVEL SWITCH WHICH GENERATED A B0OSTER PUMP TRIP SIGNAL TWO FEEDWATER B00 STER PUMPS AND ONE TURBINE-DRIVEN FEEDWATER PUMP TRIPPED REACTOR TRIPPED AT LOW WATER LEVEL 3 AND HPCS AUT0-INITIATED AT LOW LEVEL 2. RCIC SYSTEM DID NOT START DUE TO FAILURE OF INB0ARD STEAM ISOLATION VALVE TO OPEN. ALL EQUIPMENT EXCEPT RCIC FUNCTIONED PER DESIGN, B0OSTER PUMPS RESTARTED AUTOMATICALLY AND MOTOR-DRIVEN FEEDWATER PUMP WAS STARTED MANUALLY, WATER LEVEL WAS RESTORED AND HPCS WAS SECURED IN NEXT 4 MINUTES, LICENSEE'S ENGINEERS ARE REVIEWING THE LOGIC FOR B0OSTER PUMP TRIP AND FEEDWATER PUMP TRIP FOLLOW-UP:
REGION III AND PM ARE FOLLOWING CORRECTIVE MEASURES BY LICENSEE
REACTOR SCRAM
SUMMARY
WEEN ENDING 03/08/87 I. PLANT SPECIFIC DATA DATE SITE UNIT POWER RFS CAUSE COMPLI- YTD YTD YTD CATIONS ABO'vE EELOW TOTAL 15% 15%
02/02/07 FERRY 1 2G A PERSONNEL NO 1 1 2 03/03/87 SAINT LUCIE 2 100 A EQUIPMENT NO 1 0 1 03/03/87 COOK 2 OA EQUIPMENT t40 0 1 1 03/OD/G7 SAINT LUCIE 2 40 A UNErJOWN NO 2 0 2 03/05/87 DIABLO CANYON 2 4A UNKNOWN NO O 1 1 03/06/07 TURLEY FOINT C 100 M EQUIPMENT NO 2 1 0 03/07/87 WATERFORD 0 56 A EOU1FMENT NO 1 0 1 03/07/E7 MILLSTONE O 100 A EQUIPMENT NO 2 1 0 9
(
,f f
f
7
, II. COMPARISON OF WEEKLY STATISTICS WITH INDUSTRY AVERAGES SCRAMS FOR WEEK ENDING 03/08/07 ECRAM CAUSE F0WER NUMDER 1957 1906 1955 OF WEEKLY WEEKLY WEEELY SCRAMS (5) AVERAGE AVERAGE AVERAGE YTD (3) (4) (8) (9)
EOUIP. RELATED >15% 4 3.9 4.3 5.4 FEFS. RELATED(6) >15% 1 1.5 1.9 2.0 OTHER(7) s15% 1 0.6 0.4 0.e
6 6.0 6.5 G.O
EDUIF. RELATED <15% 1 1.0 1.4 1.3 FERS. RELATED <15% 0 0.0 0.8 0.9
. OTHER <15% 1 O.1 O.2 0.2
2 1.9 2.4 2.4 o** Total *++
8 7.9 G.9 10.4 t1ANUAL VG AUTO SCC AME TYF E NUMEER 1987 19G6 19G5 OF WEEKLY WEEKLY WEEFLY SCRAMS f.VERAGE AVERAGE AVERAGE YTD M A N'.l.',L SCRAMG 1 1,2 1.O 1.O AUTOMATIC SCRAMS 7 6.7 7.9 9.4
r NOTES
- 1. PLANT SPECIFIC DATA BASED ON INITIAL REVIEW 0F 50.72 REPORTS FOR'THE WEEK OF INTEREST. PERIOD IS MIDNIGHT SUNDAY THROUGH MIDNIGHT SUNDAY SCRAMS ARE DEFINED AS REACTOR PROTECTIVE ACTUATIONS WHICH RESULT IN R0D MOTION, AND EXCLUDE PLANNED TESTS OR SCRAMS AS PART OF PLANNED SHUTDOWN IN ACCORDANCE WITH A PLANT PROCEDURE.
- 2. REC 0VERY COMPLICATED BY EQUIPMENT FAILURES OR PERSONNEL ERRORS UhRELATED TO CAUSE OF SCRAM.
- 3. 1986 INFORMATION DERIVED FROM ORAS STUDY OF UNPLANNED REACTOR TRIPS IN 1986. WEEKLY DATA DETERMINED BY TAKING TOTAL TRIPS IN A GIVEN CATEGORY AND DIVIDING BY 52 WEEKS / YEAR.
- 4. IN 1986, THERE WERE AN ESTIMATED TOTAL OF 461 AUTOMATIC AND MANUAL UNPLANNED REACTOR TRIPS AT 104 REACTORS (HOLDING OPERATING LICENSES). THIS YIELDS AN AVERAGE RATE OF 4.4 TRIPS PER REACTOR PER YEAR AND AN AVERACE RATE OF 8.8 TRIPS PER WEEK FOR ALL REACTORS.
- 5. BASED ON 104 REACTORS HOLDING AN OPERATING LICENSE.
- 6. PERSONNEL RELATED PROBLEMS INCLUDE HUMAN ERROR, PROCEDURAL DEFICIENCIES, AND MANUAL STEAM GENERATOR LEVEL CONTROL PROBLEMS.
- 7. "0THER" INCLUDES AUTOMATIC SCRAMS ATTRIBUTED TO ENVIRONMENTAL CAUSES(LIGHTNING),SYSTEMDESIGN,ORUNKNOWNCAUSE.
- 8. 1985 INFORMATION DERIVED FROM AN ORAS STUDY OF UNPLANNED REACTOR TRIPS IN 1985. WEEKLY DATA DETERMINED BY TAKING TOTAL TRIPS IN A GIVEN CATEGORY AND DIVIDING BY 52 WEEKS / YEAR.
- 9. IN 1985, THERE WERE AN ESTIMATED TOTAL OF 541 AUTOMATIC AND VNUAL UNPLANNED REACTOR TRIPS AT 93 REACTORS (HDLDING FULL POWER LICENSES). THIS YIELDS AN AVERAGE RATE OF 5.8 TRIPS PER REACTOR YEAR AND AN AVERAGE RATE OF 10.4 TRIPS PER WEEK FOR ALL REACTORS.
PaleNo, 1 03/09/67 SIGNIFICANT EVENTS FREQUEN:Y PERFOR".ANCE INDICATOR No. 3 PLANThA".E EVENT EVENT DESCRIPTION CAUEE gic" CATE PERRY l 03/02/97 OPERATOS ERROR ICUCED REACTOR TRIP C09FLitATED EY RCIC FERSONNELERROR o MALFUCTION G
l e
s 8 ,o
. _ .