Discusses Closure of Allegation 4-84-A-114 in Insp Rept 50-482/85-03.QC Insps of Penetration Seals Not Being Performed & Problem Exists in Cable Tray Wall Penetration Seals.Seals Inspected & Found AcceptableML20206G962 |
Person / Time |
---|
Site: |
Wolf Creek, Callaway, 05000000 |
---|
Issue date: |
04/29/1985 |
---|
From: |
Mullikin R NRC |
---|
To: |
NRC |
---|
Shared Package |
---|
ML20206G744 |
List: ... further results |
---|
References |
---|
FOIA-85-594 NUDOCS 8606250486 |
Download: ML20206G962 (3) |
|
|
---|
Category:INTERNAL OR EXTERNAL MEMORANDUM
MONTHYEARML20212H0351999-09-27027 September 1999 Revised Notification of 991007 Meeting with Util to Discuss Status of Radiation Protection Program ML20211P1801999-09-0808 September 1999 Notification of 991007 Meeting with Util at DD Eisenhower Learning Ctr to Discuss Status of Radiation Protection Program ML20211H4441999-08-27027 August 1999 Notification of Significant Meeting with Util on 990916 & 17 in Arlington,Tx to Improve Utility & NRC Understanding of Industry & Regulatory Perspectives on Current Issues ML20196G1291999-06-26026 June 1999 Notification of 990727-28 Meeting with Util to Discuss Licensee Use of Risk Info in Low Power & Shutdown Operations at Wolf Creek Generating Station.Meeting Held in Burlington,Ks ML20195G0011999-06-11011 June 1999 Submits Record of 990430 Telcon Re Nondestructive Exam ISI Issues,Including Increased Sensitivity of UT Exam Performed After Electrosleeve Installation Versus Eddy Current Test Performed Prior to Sleeve Installation ML20207C3391999-05-26026 May 1999 Forwards NRC Approved Operator Licensing Exam Facility Outline & Initial Exam Submittal for Retake Exam Administered on 990416 ML20207A7321999-05-20020 May 1999 Submits Record of 990429 Telcon with Union Electric Personnel Re Electrosleeve Amend Application for Callaway Plant,Unit 1.Info Provided by Ue Included in Attachments 1 & 2.List of Personnel That Participated in Telcon Encl ML20205R8791999-04-20020 April 1999 Notification of 990422 Meeting with Util in Rockville,Md to Discuss NRC Staff Review of Util Amend Application Requesting Approval of Electrosleeve Steam Generator Tube Repair ML20205K5601999-04-0707 April 1999 Notification of 990422 Meeting with Util in Rockville,Md to Discuss NRC Draft Safety Evaluation for Union Electric Co Amend Application Requesting Approval of Electrosleeve SG Tube Repair ML20204B3001999-03-15015 March 1999 Notification of Licensee Meeting with Util in Steedman,Mo on 990401 to Discuss Results of Plant Performance Review Completed on 990211.Meeting Open to Public ML20207K3401999-03-11011 March 1999 Notification of 990325 Meeting with Util to Discuss Results of Plant Performance Review Completed on 990211 ML20196F7121998-12-0101 December 1998 Notification of 981203 Meeting with Util to Discuss Spent Fuel Pool Structural Evaluations Performed by Wolf Creek Nuclear Operating Corp & Union Electric Co in Support of Increasing Spent Fuel Pool Capacity at Plants ML20154B7031998-09-29029 September 1998 Notification of 981014-15 Meeting with Utils in Rockville,Md to Discuss Wolf Creek & Union Electric Co Proposed TS Amends to Support Mod to Increase SFP Capacity at Wolf Creek & Callaway Plants ML20236T2791998-07-23023 July 1998 Notification of 980806 Meeting W/Util in Rockville,Md to Discuss Util Planned Revs to Plant Radiological Emergency Response Plan ML20249C1321998-06-23023 June 1998 Notification of 980707 Meeting W/Union Electric Co in Rockville,Md to Discuss Status of NRC Review of Util Proposed Amend to Allow Use of Framatome Electrosleeve in Callaway Plant Sg,As Outlined in from NRC ML20248J6191998-06-0303 June 1998 Notification of 980615 Meeting W/Util in Region IV Ofc to Discuss Update on Maint Rule Program Changes & Improvements. Agenda Attached ML20248J0741998-06-0303 June 1998 Notification of 980611 Meeting W/Union Electric Co in Rockville,Maryland to Discuss Status of NRC Review of Ue Proposed Amend to Allow Use of Framatome Electrosleeves in Callaway Sgs,As Outlined in from NRC to Ue ML20248M0741998-06-0303 June 1998 Notification of Cancellation of 980611 Meeting W/Util in Rockville,Md to Discuss Status of NRC Review of Ue Proposed Amend to Allow Use of Framatome Electrosleeves in Callaway SG as Outlined in from NRC to Ue ML20248F6311998-05-29029 May 1998 Notification of Significant Licensee Meeting W/Util on 980616 in Arlington,Tx to Discuss Licensee Performance IR 05000482/19983011998-05-20020 May 1998 Forwards Exam Rept 50-482/98-301 Administered on 980217, Along W/Facility Initial License Exam Comments,Final Written Exam & Answer Key ML20247M6331998-05-20020 May 1998 Forwards NRC Approved Operator Licensing Exam,Facility Outline & Initial Exam Submittal & as-given Operating Exam for Tests Administered on 980217 ML20216C9281998-05-13013 May 1998 Notification of 980617 Meeting W/Util in New Strawn,Kansas to Discuss Latest Systematic Assessment of Licensee Performance Results ML20217Q6011998-04-29029 April 1998 Notification of 980513 Meeting W/Wolf Creek Nuclear Operating Corp & Union Electric Co to Discuss Proposed TS Amends to Support Mod to Increase Spent Fuel Pool Capacity at Wolf Creek & Callaway ML20217F9511998-03-30030 March 1998 Notification of 980402 Meeting W/Util in Rockville,Md to Discuss NRC Staff Questions Re Changes Made to Callaway Emergency Plans ML20236N6081998-03-11011 March 1998 Responds to Task Interface Agreement Re Callaway Performance of During Shutdown Surveillance Test Requirements W/Unit at-power ML20202J0881998-02-18018 February 1998 Notification of 980306 Mgt Meeting W/Licensee in Arlington, Tx to Discuss Plant Design & Licensing Bases Fidelity ML20199C1531998-01-16016 January 1998 Notification of 980129 Meeting W/Util in Rockville,Md to Discuss NRC Staff Questions Re Licensee Interpretation of TS Required Shutdown Surveillance Testing ML20198C3801998-01-0202 January 1998 Notification of Licensee Meeting W/Util on 980121 to Discuss Radiation Protection Activities ML20198A1671997-12-31031 December 1997 Notification of Meeting W/Licensee on 980209-10 in Arlington,Tx to Review Exam for Operator Licensing.Meeting Not Open to General Public,Due to Subj Matter & Nature of Meeting ML20198A6581997-12-31031 December 1997 Notification of 980122-23 Licensee Meeting W/Util in Arlington,Tx to Review Exam for Operator Licensing ML20198B3021997-12-19019 December 1997 Forwards AEOD 6th Yr Engineering Evaluation NPP Cold Weather Problems & Protective Measures. Evaluation Initiated as Result of 960130 Event at WCGS Re Icing of Cold Water Intake Trash Racks & Other Complications ML20203E6261997-12-11011 December 1997 Notification of 971216 Meeting W/Licensee in Arlington,Tx to Discuss Recent Exam Results.Meeting Cancelled ML20203E7141997-12-11011 December 1997 Notification of 971222 Meeting W/Licensee in Arlington,Tx to Review Exam Preparation for Operator License Exams ML20203C4321997-12-0505 December 1997 Notification of 971209 Meeting W/Util to Discuss NRC Staff Questions Re Recent Licensee Submittals Associated W/Use of Framatome Electrosleeves ML20202B1181997-11-25025 November 1997 Notification of 971216 Meeting W/Util in Arlington,Texas to Discuss Recent Exam Results ML20202B0711997-11-21021 November 1997 Notification of 980106 Meeting W/Util in Arlington,Texas to Discuss EP Plan Activities ML20199F5021997-11-14014 November 1997 Notification of 971120 Meeting W/Union Electric Co & Framatome Technologies in Rockville,Maryland to Discuss NRC Staff Questions Re Recent Licensee Submittals Associated W/Use of Framatome Electrosleeves ML20212E8361997-10-30030 October 1997 Notification of Licensee Meeting W/Util on 971110 to Discuss Emergency Preparedness Plan Activities ML20212F5871997-10-30030 October 1997 Notification of Licensee Meeting W/Util on 971113 to Discuss Root Causes & Corrective Actions from Recent Initial License Class Failures ML20211J9411997-10-0606 October 1997 Forwards Operator Licensing Exam Rept Administered on 970825-29 ML20217E0951997-09-26026 September 1997 Notification of 971007 & 08 Meeting W/Une in Monroeville,Pa to Discuss Shutdown Margin & Other Calculations Affected by Axial Offset Anomaly Being Experienced by Plant ML20211D7881997-09-18018 September 1997 Notification of 970924 Meeting W/Wolf Creek Nuclear Operating Corp to Discuss Status & Activities Associated W/ Generic Ltr 96-06, Assurance of Equipment Operability & Containment Integrity During Design-Basis Accident IA-97-480, Forwards Excerpts from Recent Plant Insp Rept,Which Addresses Part of Area Questioned Re Overtime1997-09-0404 September 1997 Forwards Excerpts from Recent Plant Insp Rept,Which Addresses Part of Area Questioned Re Overtime ML20202E9561997-09-0404 September 1997 Forwards Excerpts from Recent Plant Insp Rept,Which Addresses Part of Area Questioned Re Overtime IR 05000483/19973011997-08-20020 August 1997 Forwards NRC Operator Licensing Exam Rept 50-483/97-301 (Including Completed & Graded Tests) for Tests Administered on 970627 ML20217M0911997-08-15015 August 1997 Notification of Significant Licensee Meeting W/Util on 970829 to Discuss Status of SALP Followup Actions ML20217H4351997-08-0101 August 1997 Notification of 970813 Meeting W/Listed Participants in Rockville,Md to Discuss NRC Questions Re Recent Licensee Submittals Associated W/Use of Framatome Electrosleeves ML20196H3371997-07-22022 July 1997 Responds to GL-96-06, Assurance of Equipment Operability & Containment Integrity During Design-Basis Accident Conditions, W/List of Attendees & Handouts Encl ML20149G1891997-07-17017 July 1997 Forwards NRC Approved Operator Licensing Exam Facility Outline & Initial Exam Submittal & as-given Operating Exam for Tests Administered on 970415-16 ML20149G1521997-07-17017 July 1997 Forwards NRC Operator Licensing Exam Rept (Including Completed & Graded Tests) for Tests Administered on 970415-16 1999-09-08
[Table view] Category:MEMORANDUMS-CORRESPONDENCE
MONTHYEARML20212H0351999-09-27027 September 1999 Revised Notification of 991007 Meeting with Util to Discuss Status of Radiation Protection Program ML20211P1801999-09-0808 September 1999 Notification of 991007 Meeting with Util at DD Eisenhower Learning Ctr to Discuss Status of Radiation Protection Program ML20211H4441999-08-27027 August 1999 Notification of Significant Meeting with Util on 990916 & 17 in Arlington,Tx to Improve Utility & NRC Understanding of Industry & Regulatory Perspectives on Current Issues ML20196G1291999-06-26026 June 1999 Notification of 990727-28 Meeting with Util to Discuss Licensee Use of Risk Info in Low Power & Shutdown Operations at Wolf Creek Generating Station.Meeting Held in Burlington,Ks ML20195J8301999-06-18018 June 1999 Staff Requirements Memo Re 990618 Affirmation Session for SECY-99-133, Final Rev to 10CFR50.65 to Require Licensees to Perform Assessments Before Performing Maint & SECY-99-145 Re Antitrust Issues for Wolf Creek Unit 1 ML20195G0011999-06-11011 June 1999 Submits Record of 990430 Telcon Re Nondestructive Exam ISI Issues,Including Increased Sensitivity of UT Exam Performed After Electrosleeve Installation Versus Eddy Current Test Performed Prior to Sleeve Installation ML20207C3391999-05-26026 May 1999 Forwards NRC Approved Operator Licensing Exam Facility Outline & Initial Exam Submittal for Retake Exam Administered on 990416 ML20207A7321999-05-20020 May 1999 Submits Record of 990429 Telcon with Union Electric Personnel Re Electrosleeve Amend Application for Callaway Plant,Unit 1.Info Provided by Ue Included in Attachments 1 & 2.List of Personnel That Participated in Telcon Encl ML20205R8791999-04-20020 April 1999 Notification of 990422 Meeting with Util in Rockville,Md to Discuss NRC Staff Review of Util Amend Application Requesting Approval of Electrosleeve Steam Generator Tube Repair ML20205K5601999-04-0707 April 1999 Notification of 990422 Meeting with Util in Rockville,Md to Discuss NRC Draft Safety Evaluation for Union Electric Co Amend Application Requesting Approval of Electrosleeve SG Tube Repair ML20204B3001999-03-15015 March 1999 Notification of Licensee Meeting with Util in Steedman,Mo on 990401 to Discuss Results of Plant Performance Review Completed on 990211.Meeting Open to Public ML20207K3401999-03-11011 March 1999 Notification of 990325 Meeting with Util to Discuss Results of Plant Performance Review Completed on 990211 ML20196F7121998-12-0101 December 1998 Notification of 981203 Meeting with Util to Discuss Spent Fuel Pool Structural Evaluations Performed by Wolf Creek Nuclear Operating Corp & Union Electric Co in Support of Increasing Spent Fuel Pool Capacity at Plants ML20154B7031998-09-29029 September 1998 Notification of 981014-15 Meeting with Utils in Rockville,Md to Discuss Wolf Creek & Union Electric Co Proposed TS Amends to Support Mod to Increase SFP Capacity at Wolf Creek & Callaway Plants ML20236T2791998-07-23023 July 1998 Notification of 980806 Meeting W/Util in Rockville,Md to Discuss Util Planned Revs to Plant Radiological Emergency Response Plan ML20249C1321998-06-23023 June 1998 Notification of 980707 Meeting W/Union Electric Co in Rockville,Md to Discuss Status of NRC Review of Util Proposed Amend to Allow Use of Framatome Electrosleeve in Callaway Plant Sg,As Outlined in from NRC ML20248J0741998-06-0303 June 1998 Notification of 980611 Meeting W/Union Electric Co in Rockville,Maryland to Discuss Status of NRC Review of Ue Proposed Amend to Allow Use of Framatome Electrosleeves in Callaway Sgs,As Outlined in from NRC to Ue ML20248J6191998-06-0303 June 1998 Notification of 980615 Meeting W/Util in Region IV Ofc to Discuss Update on Maint Rule Program Changes & Improvements. Agenda Attached ML20248M0741998-06-0303 June 1998 Notification of Cancellation of 980611 Meeting W/Util in Rockville,Md to Discuss Status of NRC Review of Ue Proposed Amend to Allow Use of Framatome Electrosleeves in Callaway SG as Outlined in from NRC to Ue ML20248F6311998-05-29029 May 1998 Notification of Significant Licensee Meeting W/Util on 980616 in Arlington,Tx to Discuss Licensee Performance IR 05000482/19983011998-05-20020 May 1998 Forwards Exam Rept 50-482/98-301 Administered on 980217, Along W/Facility Initial License Exam Comments,Final Written Exam & Answer Key ML20247M6331998-05-20020 May 1998 Forwards NRC Approved Operator Licensing Exam,Facility Outline & Initial Exam Submittal & as-given Operating Exam for Tests Administered on 980217 ML20216C9281998-05-13013 May 1998 Notification of 980617 Meeting W/Util in New Strawn,Kansas to Discuss Latest Systematic Assessment of Licensee Performance Results ML20217Q6011998-04-29029 April 1998 Notification of 980513 Meeting W/Wolf Creek Nuclear Operating Corp & Union Electric Co to Discuss Proposed TS Amends to Support Mod to Increase Spent Fuel Pool Capacity at Wolf Creek & Callaway ML20217F9511998-03-30030 March 1998 Notification of 980402 Meeting W/Util in Rockville,Md to Discuss NRC Staff Questions Re Changes Made to Callaway Emergency Plans ML20236N6081998-03-11011 March 1998 Responds to Task Interface Agreement Re Callaway Performance of During Shutdown Surveillance Test Requirements W/Unit at-power ML20202J0881998-02-18018 February 1998 Notification of 980306 Mgt Meeting W/Licensee in Arlington, Tx to Discuss Plant Design & Licensing Bases Fidelity ML20199C1531998-01-16016 January 1998 Notification of 980129 Meeting W/Util in Rockville,Md to Discuss NRC Staff Questions Re Licensee Interpretation of TS Required Shutdown Surveillance Testing ML20198C3801998-01-0202 January 1998 Notification of Licensee Meeting W/Util on 980121 to Discuss Radiation Protection Activities ML20198A6581997-12-31031 December 1997 Notification of 980122-23 Licensee Meeting W/Util in Arlington,Tx to Review Exam for Operator Licensing ML20198A1671997-12-31031 December 1997 Notification of Meeting W/Licensee on 980209-10 in Arlington,Tx to Review Exam for Operator Licensing.Meeting Not Open to General Public,Due to Subj Matter & Nature of Meeting ML20198B3021997-12-19019 December 1997 Forwards AEOD 6th Yr Engineering Evaluation NPP Cold Weather Problems & Protective Measures. Evaluation Initiated as Result of 960130 Event at WCGS Re Icing of Cold Water Intake Trash Racks & Other Complications ML20203E7141997-12-11011 December 1997 Notification of 971222 Meeting W/Licensee in Arlington,Tx to Review Exam Preparation for Operator License Exams ML20203E6261997-12-11011 December 1997 Notification of 971216 Meeting W/Licensee in Arlington,Tx to Discuss Recent Exam Results.Meeting Cancelled ML20203C4321997-12-0505 December 1997 Notification of 971209 Meeting W/Util to Discuss NRC Staff Questions Re Recent Licensee Submittals Associated W/Use of Framatome Electrosleeves ML20202B1181997-11-25025 November 1997 Notification of 971216 Meeting W/Util in Arlington,Texas to Discuss Recent Exam Results ML20202B0711997-11-21021 November 1997 Notification of 980106 Meeting W/Util in Arlington,Texas to Discuss EP Plan Activities ML20199F5021997-11-14014 November 1997 Notification of 971120 Meeting W/Union Electric Co & Framatome Technologies in Rockville,Maryland to Discuss NRC Staff Questions Re Recent Licensee Submittals Associated W/Use of Framatome Electrosleeves ML20212F5871997-10-30030 October 1997 Notification of Licensee Meeting W/Util on 971113 to Discuss Root Causes & Corrective Actions from Recent Initial License Class Failures ML20212E8361997-10-30030 October 1997 Notification of Licensee Meeting W/Util on 971110 to Discuss Emergency Preparedness Plan Activities ML20211J9411997-10-0606 October 1997 Forwards Operator Licensing Exam Rept Administered on 970825-29 ML20217E0951997-09-26026 September 1997 Notification of 971007 & 08 Meeting W/Une in Monroeville,Pa to Discuss Shutdown Margin & Other Calculations Affected by Axial Offset Anomaly Being Experienced by Plant ML20211D7881997-09-18018 September 1997 Notification of 970924 Meeting W/Wolf Creek Nuclear Operating Corp to Discuss Status & Activities Associated W/ Generic Ltr 96-06, Assurance of Equipment Operability & Containment Integrity During Design-Basis Accident IA-97-480, Forwards Excerpts from Recent Plant Insp Rept,Which Addresses Part of Area Questioned Re Overtime1997-09-0404 September 1997 Forwards Excerpts from Recent Plant Insp Rept,Which Addresses Part of Area Questioned Re Overtime ML20202E9561997-09-0404 September 1997 Forwards Excerpts from Recent Plant Insp Rept,Which Addresses Part of Area Questioned Re Overtime IR 05000483/19973011997-08-20020 August 1997 Forwards NRC Operator Licensing Exam Rept 50-483/97-301 (Including Completed & Graded Tests) for Tests Administered on 970627 ML20217M0911997-08-15015 August 1997 Notification of Significant Licensee Meeting W/Util on 970829 to Discuss Status of SALP Followup Actions ML20217H4351997-08-0101 August 1997 Notification of 970813 Meeting W/Listed Participants in Rockville,Md to Discuss NRC Questions Re Recent Licensee Submittals Associated W/Use of Framatome Electrosleeves ML20196H3371997-07-22022 July 1997 Responds to GL-96-06, Assurance of Equipment Operability & Containment Integrity During Design-Basis Accident Conditions, W/List of Attendees & Handouts Encl ML20149G1891997-07-17017 July 1997 Forwards NRC Approved Operator Licensing Exam Facility Outline & Initial Exam Submittal & as-given Operating Exam for Tests Administered on 970415-16 1999-09-08
[Table view] |
See also: IR 05000482/1985003
Text
._. _ -_
op y4 - Il-II4
'
APR 2 S 1985
MEMORANDUM FOR: Allegation File
FROM: R. P. Mullikin, Reactor Inspector, RPB2
SUBJECT: BACKGROUND INFORMATION FOR ALLEGATION 4-84-A-114
This memo is intended to give the background information on the closure of
'
Allegation 4-84-A-114 in NRC Inspection Report 50-482/85-03 (paragraph 3.b).
- The part of the allegation that was found to be substantiated was that some
in-process QC inspections of penetration seals were not being performed.
JL 100 percent documentation review by KG&E of B&B Insulation, Inc., penetration
seals discovered that, during the period from March to June 1984, twelve
flexible fire-radiation boot seals were installed without the necessary QC
inspections. This type of seal is used around pipes penetrating a structure
where movement of the pipe is needed. A metal sleeve is extended from each
side of the penetration so a flexible boot can be attached to it and to the
pipe. The sealant material is contained within the boot, so that a post
installation inspection of the traceability of the sleeve material is
impossible without removing the boot. Subsequently, four nonconformance
reports were issued to remove the boots, inspect the seal, and record the
.
sleeve fabrication number. This has been completed.
l
Also, mentioned in the inspection report was the problem that was discovered
at Callaway in their cable tray wall penetration seals. In this type of seal,
depending on the size of the penetration, fire resistant damming material
(ceraboard) is permanently installed on both sides of the wall to stop the
leakage of the foam sealant. Holes are drilled in the board so the foam can be
pumped in. This makes the in-process inspection very difficult. At Callaway,
voids in some seals were found when the dams were removed. According to KG&E,
the wall penetrations at Wolf Creek were not installed in the same manner, but
were installed in layers so the seals could be inspected in-process to
eliminate voids. However, due to the Callaway problem KG&E QA initiated a
reinspection of a sample of the wall penetration seals (approximately 55
percent of the total population) in March 1984. This effort consisted of
removing the ceraboard dam and inspecting the seal. This reinspection resulted
in no unacceptable seals.
Based upon the Quality First effort, the reinspection by KG&E, and randomly
selected seals inspected by the NRC there appears to be no concern for the
quality of the penetration seals at Wolf Creek.
'
RPB2 RPB DRS&P E0
RPMullikin:gb LM n RPDenjse TWesterman
)[ /n/85 ////85 g /p/85
/f/85
l
62 6 860618 )
STEPHEN 85-594 PDR pg
gg,Q )
^ - - - - - - _ - _-_
y
u.s. NuctIsa KEtut&T3av Couutssione
_
sk
" ' " ' ALLEGATION DATA INPUT
s
f\ fr
@ .
'? I Id'
h Pad
A. RECEIVING OF FICE
haus #40ta.,.reensJ =Me oOCaref Nuustm
=aut (40 cne,. rwa gg , g
ta =a' .veta
,,,. ". . . . , . -
.,,,,,
.Niooo4#%r.ir1 1dminimi leMM"-iMal isfrinMriaW I I I l I 1 1 I I I alIilIl11 IIIIIIIIIIIIIlIIllIIllIIIIIIIIIIIIIIIII
'l ! I , !!! 11ll1lllllllllI11111llllllll111lIl1ll11 4llIlllli 111111lllllllllllIll111ll1llltillllllli
'2 TYPE OF REGULATED ACTIVITY (Chece atto.aphcable bonest
e ofwin
e sapgGuapos (sen,a,s
g . at Af wa a wan.oon s. uaT E miats tso sa .<uwa
I*
! 3 uaTi n.at LICENSE
" " *' ' " '55 I I I I II I I I I I II I I I I I I I I I II I I I I I I I I I I lI II I I I i 1 l l
- 4. FUNCTroNAL ARE A45)(Chece att apphcef>tes
l l
. y,v
C8"*5
-
l l l
a s.s ecuanos
. una.:-o%s g n const auctio= _
att a os.. ,,
_
. i .vo. .v o=
, suance cve..... o ess . o~sive
!
_
. ,o,i,. ,a. .a. <s,.,.,..,, ,,,,,,,,,,,,,,,,,,,,,,,,,,,, , , , , , , , , , , , , , , , , , , , , p ;o g 9
. o..s vi - .61 a o sae erv , ., ,
,
o .m__, ,,se w,, 1.a ., a pp,,m, a w . .,, , y y _ ga,_7,,,,,. _ _ ,
,=ns erres;w,,.w E.Ta- + a2~N - n- - ~ a u n --- n - ~ --mara- L .gra" - g - L > o. 1 - - , ,,,: _
.
,. .". - -- arv rm-.Das ni n5.nu e r n,y- . S'-w- ,. ,
" m,_,.y . m>
1 -cJA&w n e ur' h e _ de r= m, r
&rell #^ =>= e w_~I* S = ~ ' ->w Au ste_
-
E / f- = > - ~-1 en=>r -tra -..as- ,
' unanxA/s.w-'_ -e as x *7 SCIURCE (Cfece ones
, vis
. a=o=vuous l$8[* ;'*[ '~,"'", 71 , , , ,, , , , , , , , , , , , , ,
. . -.n oanwio,es
A . .o.uin co=va.cron ewtone
. = =s us oiA
_
' * ' ' , ,* ' ' ' " " X
-~
.. =o
. . . i nto.ru 3
~
-
! I I I I I I I I I I I I I I I I I I I I I I I I . suetin o
. ~* ~ . .ce = sin iwton s 6 enivari civira= . ovasa rs .e,s
.
oav *io EuPLovEE RECEIV NG ALLEGATION (rest t o usetasis,isst sweel l* " oct at ca ev.
!3 ,26 j,ina uo=1
! 'O'c T Igr.51ol3lo l7 T F himsreRMAN INidl"' l"I ~i
l
8. ACTION OFFICE
- 3 CONT ACT S TELEPHONE *e SAf E T Y SIGNIFICANCE 5 goano noio icat,oy
- 2. CONT ACT tearse s=o saerseis ssst ru**8 aiCorn =t o
l,
....
a . . . .o. uu... _
. v,s g.u=.=o,=
FmS 7121FI-IPl/lolo *o l * "5 lbl " w
iRII:Vi ;- K15 -lal-lolol415 -T A. MMH 8 7 ALLEGATION W As suRST ANTIATED 8 ALLEGE 53 PwOll51EO
7 N *6 STATUS MMM@
]
'
vtan uo=1 o., i
b Ctosto 8DATE vtan teoNTH . ves paaveatt,
DATE
I i l i loav
-
bvEs Ile
- '
Ir:5lal5l/i5 =o
.
c'o5'o I
W!ETu'tfo~ -
9 a 6 v.' J. . 3 o ce,,,c recs use e.,etd>=@egr ea g
!
) _
i
i
'
l it. ol aE PonT.Nuus E n
, g , , ; , g g g g , g 9 l
n. c . - -- ..
l la vts lM b HO
.. . . .. s i. i t s
- - .- . -. . _- - - _ - -
s
4 -y+ A- ( L -
-:
-
I 'A' - i a l .. li g w. %n
j ?W f s ^ ANSAS G4S ArD ELECTRIC COMPANY
'
-
j +} **
f ""SE_E C'.!PPINGS TRANSM m
,,,
Report
f ,,_^, M .,
l
,_
i
l KG&E FoesCite !
l
,'
Of CovertP
TOPEKA - An engineer investigating huge cost in-
,
,h7,,",I, ,,Ugg*h,$,",,,7 [ l
creases during construction of the Wolf Creek nuclear witness in the rate hearings so he could
reports,0f unis*pow- explain how the complaints were dealt
cr planW supervisors of 6._ .~,47
Inanagesaget. @ - ~
~ with.The KCC won't decide whether to do
4
.
.
.
that until it can review all the files.
,
h-p.
'
The engineer's allegation is contained in V ON SATURDAY. Halnea attacked Eye
]' was for obtaining the confidential files, which
and Electric Co. file that N 8I "'*"'" 8380
b maw public by an attorney for a 'P ===L the KG&E iswyer said could undermine
l Wichita-based consumer group nicased by ALERT, shows that me workers' trust in the Qua!!ty First pro-
[ " Y,,7N,. f
the Alliance for Livable Electric ( ,,,
Kates. The group is fighting rate. KG&E' General Counsel Ralph Foster be- "At some point along the way," Maines
l hikes proposed to pay for the 33
,
. cause of "gotential lesal concerna." Fos- said,"there has been some impropriety in
billion plant near Burlington. ( ter declined Saturday to comment after obtaining me (Quauty FM documents."
,
1he complaint is part of KG&E's ;
j ( discussions with other KG&E officials. Wilson Cadman, KG&E chief executive
!
" Quality First" program to inter- I officer, said be considered Eye's actions
view departing workers to see ROBERT EYE, a Topeka attorney for "a whcuon on my penonal Wegrity,
wriether they had any concerns
about the plant s safety. The pro- ALERT - a group of small and medium- because when I approved this program
J
gram was started *
in October 1983.
- * sized busmesses - said Saturday that, if (Quality First),I assured confidentiality."
l . the engineer's charge is true, it casts Cadmaa spent his third day on the wit-
THE ENGINEER - who is not doubt on the cost explanations provided to ness stand Saturday, answering questions
!
idrntified - said in the complaint the.KCC by KG&E, builder of Wolf Creek, from attomeys for groups intervening in
that employees 'of Bechtel Power _
,
corn.. MO&E's architect eaniamar ; f and its two coewners in th'ethe
The KCC has until Sept. 30 to set new
missioners
Wolf Creek rate case and from com
venture- 1Annen and Keith Henley.'
-
~for wo f creek.
tntauon of some dutroved docu <
d*< ion channes, rates for KG&EN.1.-and its Wolf Creek part-
l m
ners, Kansas City Power and Ught Co. HENLEY PROMPTED Cadman to re-
~ ould
w not allow him and others to
and Kansas Electric Power Cooperatives peat earlier statements that anything less
j cne managemem, cesian or ware. than the five-year phased-in rate increase
1
er productmry in jusurying bisher_ I"C- of 95 percent that KG&E has requested
costs and actually rewrote some Eye said the allegation may contradict might force the company first to appeal
l
'
' reports the findings of a July 1984 " Reconciliation the KCC's decision and then to file
The enoineer made his com. Management Summary" given to the KCC. Chapter 11 reorganization.
l Without the fullincrease Cadman said,
ments toGobert Jonega KG&E That sur:stary says that new federal regu-
I lations, not mismanagement, forced most " service would suffer, our customers
' employee who concucted inter.
views with departing workers. of the cost overruns for Wolf Creek. Wolf would suffer - it would cause large lay-
Jones, recording the interview, Creek costs jumped from a 1976 "defini-
said the engineer felt Bechtel's ac.
hons were_ " mon a whhwash uve estimate" of $1.1 billion to an estimat.
,
than a cover-up ed 83 billion this year.
"I think its somemMg he commW
KG&E SPOKESMAN Lyle ought to be apprised of" he said. ,It's a
i
Vnerner said Saturday that the pretty serious allegation.
l
j 6pt. 29.198) allegations were D15CUS$10N OF the confidential file,
3nvaenomeo and found to lig- and of a similar file Eye has that relates
l
f m ain as inv igate * to how workers were scheduled at Wolf
Creek, created a brief fury during rate ,
j Koerper said be wasn't given a detalle hearings Saturday.
KCC Chairman Michael L_ ennen asked
,
f explanation, James una to aiv t
He said further explanation wouldn't be K.S&E suorne I
j
' appropriate because the complaint le con- "O**W'"8 D" hich _
I
fidential and because the Kansas Corpora-
tion Commission has yet to rule on wheth- _The KCCn will review them to see w- H an - co. ce
,
er to consider the complaint in deciding -
Wolf Creek ra
- y
.
8 -79
& f G.
,
L