Amend to Emergency Plan Implementing Procedures Deleting Procedure EPIP-2.05, Transmittal of Core Damage Data. Revised Index Included
ML20207J141
Person / Time
Site: Surry  Dominion icon.png
Issue date: 12/23/1986
From: Stewart W
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To: Grace J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
86-815, EPIP-2.05, NUDOCS 8701080314
Download: ML20207J141 (4)


Text

.

VIRGINIA ELECTRIC AND POWER COMPANY DELETION TO SURRY POWER STATION EMERGENCY PLAN IMPLEMENTING PROCEDURES The procedure listed below has been deleted from the Surry Power Station Eme Jency Plan Implementing Procedures. This deletion was approved by the Station Nuclear ' Safety and Operating Committee,- November 25, 1986. Please take the following actions in order to keep your manual updated.

Remove and Destroy Insert Index Page 2 Index Page 2 EPIP-2.05 ~ TRANSMITTAL 0F CORE DAMAGE DATA Remove and Destroy Insert Entire procedure N/A dated 01-02-86 5

i 8701030314 861223 0 i PDR ADOCK 0500 F

' REB /jmj/LM7-269

~16Y Ye

EMERGENCY PLAN IMPLEMENTING PROCEDURES INDEX LATEST EPIP NUMBER TITLE REVISION DATE EPIP-1.01 Emergency Manager Controlling Procedure 09-29-86 EPIP-1.02- Responus to Notification of Unusual Event 04-18-86 1 EPIP-1.03 Response to Alert 05-21-85 EPIP-1.04 Response to Site Area Emergency 04-16-85 EPIP-1.05 Response to General Emergency 12-31-85 EPIP-2.01 Notification of State and Local Governments 09-23-86 EPIP-2.02 Notification of NRC 09-23-86 EPIP-2.03 Reports of Offsite Agencies 04-16-85 EPIP-2.04 Transmittal of Plant Status and Core Assessment Data 01-02-86 EPIP-3.01 Callout of Emergency Response Personnel 09-03-86 EPIP-3.02 Activation of Technical Support Center 09-29-86 EPIP-3.03 Activation of Operational Support Center 04-03-86 EPIP-3.04 Activation of Local Emergency Operations Facility 09-19-86 EPIP-4.01 Radiological Assessment Director Controlling Procedure 08-13-85 EPIP-4.02 Radiation Protection Supervisor Controlling Procedure 10-23-84 EPIP-4.03 Dose Assessment Controlling Procedure 04-03-86 EPIP-4.04 Emergency Personnel Radiation Exposure 12-03-85 EPIP-4.05 Respiratory Protection 05-21-85 EPIP-4.06 Personnel Monitoring and Decontamination 07-29-82 EPIP-4.07 Protective Measures 09-10-85 EPIP-4.08 Initial Offsite Release Asuessment 10-01-85 EPIP-4.09 Source Term Assessment 10-01-85 EPIP-4.10 Determination of X/Q 07-29-82 O

.. - - , _ _ - .- - - - - . _ -~ -_ - - - . _

3 , EMERGENCY PLAN IMPLEMENTING PROCEDURES INDEX

[ LATEST EPIP NUMBER TITLE REVISION DATE EPIP-1.01 Emergency Manager Controlling Procedure 09-29-86 4

EPIP-1.02. Response to Notification of Unusual Event 04-18-86 i

! EPIP-1.03 Pesponse to Alert 05-21-85 EPIP-1.04 Response to Site Area Emergency 04-16-85 EPIP-1.05 Response to General Emergency 12-31-85 EPIP-2.01 Notification of State and Local Governments 09-23-86 EPIP-2.02 Notification of NRC 09-23-86 EPIP-2.03 Reports of Offsite Agencies 04-16-85

! EPIP-2.04 Transmittal of Plant Status and Core Assessment Data 01-02-86

! EPIP-3.01 Callout-of Emergency Response Personnel 09-03-86 1

EPIP-3.02 Activation of Technical Support Center 09-29-86 EPIP-3.03 Acthation of Operational ort Center 04-03-86 4

~k EPIP-3.04 Activation of Local Emergency Operations Facility 09-19-86

EPIP-4.01 Radiological Assessment Director Controlling Procedure 08-13-85

, EPIP-4.02 Radiation Protection Supervisor Controlling 10-23-84 Procedure EPIP-4.03 Dose Assessment Controlling Procedure 04-03-86 EPIP-4.04 Emergency Personnel Radiation Exposure 12-03-85

. EPIP-4.05 Respiratory _ Protection 05-21-85 EPIP-4.06 Personnel Monitoring and Deconta'nination 07-29-82 EPIP-4.07 Protective Measures 09-10-85 EPIP-4.08 Initial Offsite Release Assessment 10-01-85 EPIP-4.09 Source. Term Assessment 10-01-85 EPIP-4.10 Determination of X/Q 07-29-82 i

i

)

VINGINIA ELECTRIC AND Powen CoxIwNY HICHMOND,VINGINIA 2!)2 G1

- 7 J AM ?. P l: ?9 W.L.STHWANT wSE."o")."f" . December 23, 1986 Dr. J. Nelson Grace Serial No.86-815 Regional Administrator N0/ REB /jmj/LM7-269 U.S. Nuclear Regulatory Comission Docket Nos. 50-280 Region II 50-281 101 Marietta Street, Suite 2900 License Nos. DPR-32 Atlanta, Georgia 30323 DPR-37

Dear Dr. Grace:

VIRGINIA ELECTRIC AND POWE4 COMPANY SURRY P0hER STATION UNIT NOS. 1 AND 2 AMENDMENT TO EMERGENCY PLAN IMPLEMENTING PROCEDURES Pursuant to 10 CFR 50.54(q), an amendment to the Surry Power Station Emergency Plan Implementing Procedures is submitted. This amendment, which involves the deletion of a procedure, doer not decrease the effectiveness of our Emergency Plan, and the plan, as amended, continues to meet the standards of 10 CFR 50.47(b). Please update your manual by performing the actions described in the enclosed tabulation of changes.

Very truly yours,

(

W. L. tewart Enclosures cc: Document Control Desk (2) s Mr. Lester S. Rubenstein, Director - (w/o enclosures)

PWR Project Directorate #2 Division of PWR Licensing-A Mr. Chandu P. Patel (w/o enclosures)