MONTHYEARML20217B9061999-10-0101 October 1999 Proposed Tech Specs Re Control Rod Block Instrumentation ML20212H5261999-09-27027 September 1999 Proposed Tech Specs Pages,Revising TS Re Loss of Power Setpoints for 4 Kv Emergency Buses ML20210N0801999-08-0606 August 1999 Proposed Tech Specs Incorporating Note Which Will Permit one-time Exemption Until 990930,from 90 F Limit Stated in SR 3.7.2.2 ML20210E6001999-07-21021 July 1999 Proposed Tech Specs,Deleting Requirement for Refuel Platform Fuel Grapple Fully Retracted Position Interlock Currently Required by TS Surveillance Requirement 3.9.1.1 ML20209F7751999-07-12012 July 1999 Proposed Tech Specs Sections 2.1.1.2 & 5.6.5,incorporating Revised SLMCPR Due to Use of Cycle Specific Analysis & Deleting Previously Added Footnotes Which Are No Longer Necessary ML20209D9861999-07-0808 July 1999 Proposed Final Tech Spec Pages Correcting Minor Administrative Errors in Figure Showing Site & Exclusion Boundaries & Two SRs ML20209B9211999-07-0101 July 1999 Proposed Tech Specs,Reflecting Change in Corporate Structure ML20196A5441999-06-14014 June 1999 Proposed Final Tech Spec Pages for License Change Request ECR 98-01802 Re Installation of Digital Power Range Neutron Monitoring (Prnm) Sys & Incorporation of long-term thermal- Hydraulic Stability Solution Hardware ML20195B8271999-05-25025 May 1999 Proposed Final Tech Specs Pages for License Change Application ECR 96-01511 Re Rev to Loss of Power Setpoints for 4 Kv Emergency Buses ML20205F6391999-03-29029 March 1999 Proposed Tech Specs Pages,Deleting Requirement for Refuel Platform Fuel Grapple Fully Retracted Position Interlock Currently Required by TS Surveillance Requirement 3.9.1.1 ML20207E2551999-03-0101 March 1999 Proposed Tech Specs Supporting PBAPS Mod P00507 Which Will Install Power Range Neutron Monitoring Sys Incorporate long-term T/H Stability Solution Hardware ML20198N2531998-12-24024 December 1998 Proposed Tech Specs Revising Setpoints & Limits of Allowable Values for LOP Instrumentation for 4kV Emergency Buses Contained in TS Table 3.3.8.1-1, LOP Instrumentation ML20154C8271998-09-29029 September 1998 Proposed Tech Specs SR 3.6.4.1.2,revising Wording to Maintain Requirement That Secondary Containment Is Not Breached at Any Time When Secondary Containment Is Required ML20151Y3841998-09-14014 September 1998 Revised Proposed Final TS Pages for License Change Application ECR 97-02809,incorporating end-of-cycle Recirculation Pump Trip Sys at Units 2 & 3 ML20151Y3711998-09-11011 September 1998 Proposed Final TS Pages for License Change Application ECR 98-01403,revising SLMCPRs for Unit 2 ML20151Y3651998-09-11011 September 1998 Proposed Final TS Pages for License Change Applications ECR 96-02324 & 98-00499,revising MSIV Leakage & Safety Relief Valve Surveillance Testing ML20151T0421998-08-31031 August 1998 Proposed Final Tech Specs Pages for License Change Application ECR 97-02809,incorporating end-of-cycle Recirculation Pump Trip Sys at Plant ML20236W2201998-07-29029 July 1998 Proposed Tech Specs,Supporting Installation of Mod P00271 for Unit 2 Re Replacement of Source Range & Intermediate Range Monitors W/New Wide Range Neutron Monitoring Sys ML20236R3121998-07-10010 July 1998 Proposed Tech Specs Pages for License Change Application ECR 98-01403,revising TS Section 2.0.W/non-proprietary Addl Info Re 1.10 Cycle Specific SLMCPR Cycle 13 ML20236P7531998-07-0909 July 1998 Proposed Tech Specs Supporting Installation of Mod P00271, for Unit 2 Re Facility Operating License Change Request 93-18 ML20247C2611998-05-0101 May 1998 Proposed Tech Specs Deleting Requirements for Functional Testing of SRVs During Each Unit Startup ML20217K3651998-04-28028 April 1998 Proposed Tech Specs Bases Through Unit 2 Bases Rev 17 & Unit 3 Bases Rev 19 ML20217G7531998-03-20020 March 1998 Proposed Tech Specs Re end-of-cycle Recirculation Pump Trip Sys at Plant ML20217Q4711998-03-0202 March 1998 Proposed Tech Specs Adding Requirements to Achieve Compliance w/10CFR50.36a, TS on Effluents from Nuclear Power Reactors ML20202F4201998-02-0404 February 1998 Proposed Tech Specs Revising SR 3.6.4.1.2 & Associated Bases to Reflect Changes in Requirements for Secondary Containment Doors ML20211H9281997-09-26026 September 1997 Proposed Tech Specs,Replacing Page 2.0-1 & Adding Page 5.0-21 for Unit 3 ML20211F4001997-09-22022 September 1997 Proposed Tech Specs Replacing Source Range & Intermediate Range Monitors W/New Wide Range Neutron Monitoring Sys ML20141G4871997-06-30030 June 1997 Proposed Tech Specs,Revising TS Section 2.0, Safety Limits to Incorporate Revised SLMCPRs Due to Use of GE13 Fuel Product Line & cycle-specific Analysis Performed by GE ML20140D8601997-06-0404 June 1997 Proposed Tech Specs,Revising Section 3.8.2.1 to Eliminate Inconsistency Between Requirements for ECCS Operability & auto-start & Trip Bypass of of EDGs on ECCS Initiation Signal During Listed Events in Application ML20141L0111997-05-23023 May 1997 Proposed Tech Specs Revising Section 5.5.12 to Exclude Measured Main Steam Isolation Valves Leakage from Total Type B & C Local Leak Rate Test Results ML20141E0801997-05-0909 May 1997 Proposed Tech Specs 3.6.1.3.16,replacing Frequency of Primary Containment Purge & Exhaust Valve Inflatable Seals ML20137P7561997-03-31031 March 1997 Proposed Tech Specs,Extending Surveillance Interval for Calibr of Average Power Range Monitor Flow Bias Instrumentation from 18 Months to 24 Months ML20134F6121996-10-30030 October 1996 Proposed Tech Specs,Section 2.0,revising Slmcprs Due to GE Determination That Previous Calculation Is Nonconservative ML20117L2891996-09-0606 September 1996 Proposed Tech Specs 3.3.5.1, ECCS Instrumentation, & 3.8.1, AC Sources-Operating ML20117F9471996-08-27027 August 1996 Proposed Tech Specs Re CRD Charging Water Header Pressure for Shutdown Margin Test ML20117H6761996-08-23023 August 1996 Proposed Tech Specs 2.0 Re Safety Limits ML20117M7041996-06-13013 June 1996 Proposed Tech Specs,Sr 3.3.1.1.12,for APRM Flow Biased High Scram Function,Allowing SR to Be Performed W/O Entering Associated Conditions & Required Actions for Up to Six H Provided Core Flow at or Above 82% ML20101K8131996-03-25025 March 1996 Proposed Tech Specs Section 2.0 Re Safety Limits ML20100J7591996-02-15015 February 1996 Proposed Tech Specs Re Implementation of 10CFR50,App J, Option B ML20096F1481996-01-16016 January 1996 Proposed Tech Specs Base Changes Re Implementation of Main Stack & Vent Stack Radiation Monitoring Sytems ML20095L0231995-12-22022 December 1995 Proposed Improved TS & Bases,Allowing Flexibility to Install Main Stack Rms (Mod 5386) W/O Need for Addl Licensing Actions & Addressing Annotations to Reflect pre- & post-mod Scenarios,Respectively ML20095J1321995-12-21021 December 1995 Proposed Tech Specs,Consisting of Change Request 95-08, Eliminating Outdated Matl from FOLs & Making FOL for Unit 2, Consistent W/Fol for Unit 3 ML20095J7011995-12-19019 December 1995 Proposed Tech Specs Re Administrative Change to Ventilation Filter Testing Program ML20095A1731995-11-30030 November 1995 Proposed Tech Specs,Changing Minimum Allowable Control Rod Scram Accumulator Pressure & Charging Water Header Pressure from Value of 955 Psig to Value of 940 Psig ML20094R2971995-11-22022 November 1995 Revised,Proposed TS Pages 147,157 & 158 Re Early Implementation of Improved TS Section 3.4.3 ML20094Q6801995-11-21021 November 1995 Proposed Tech Specs Re SR for High Pressure Test of HPCI & B 3.5-14 & B 3.5-28.Administrative Change Proposed to Eliminate Ref to Section Previously Eliminated ML20092A2141995-09-0101 September 1995 Proposed Tech Specs,Consisting of Change Request 95-07, Deleting License Condition 2.C ML20092A2841995-08-30030 August 1995 Proposed Tech Specs,Requesting Enforcement Discretion from Portion of FOL Condition 2.C ML20092B9871995-08-28028 August 1995 Proposed Improved Tech Specs ML20087E8881995-08-0404 August 1995 Proposed Tech Specs Re Implementation of New SR Associated W/Conversion to TS 1999-09-27
[Table view] Category:TECHNICAL SPECIFICATIONS & TEST REPORTS
MONTHYEARML20217B9061999-10-0101 October 1999 Proposed Tech Specs Re Control Rod Block Instrumentation ML20212H5261999-09-27027 September 1999 Proposed Tech Specs Pages,Revising TS Re Loss of Power Setpoints for 4 Kv Emergency Buses ML20210N0801999-08-0606 August 1999 Proposed Tech Specs Incorporating Note Which Will Permit one-time Exemption Until 990930,from 90 F Limit Stated in SR 3.7.2.2 ML20210E6001999-07-21021 July 1999 Proposed Tech Specs,Deleting Requirement for Refuel Platform Fuel Grapple Fully Retracted Position Interlock Currently Required by TS Surveillance Requirement 3.9.1.1 ML20209F7751999-07-12012 July 1999 Proposed Tech Specs Sections 2.1.1.2 & 5.6.5,incorporating Revised SLMCPR Due to Use of Cycle Specific Analysis & Deleting Previously Added Footnotes Which Are No Longer Necessary ML20209D9861999-07-0808 July 1999 Proposed Final Tech Spec Pages Correcting Minor Administrative Errors in Figure Showing Site & Exclusion Boundaries & Two SRs ML20209B9211999-07-0101 July 1999 Proposed Tech Specs,Reflecting Change in Corporate Structure ML20196A5441999-06-14014 June 1999 Proposed Final Tech Spec Pages for License Change Request ECR 98-01802 Re Installation of Digital Power Range Neutron Monitoring (Prnm) Sys & Incorporation of long-term thermal- Hydraulic Stability Solution Hardware ML20195B8271999-05-25025 May 1999 Proposed Final Tech Specs Pages for License Change Application ECR 96-01511 Re Rev to Loss of Power Setpoints for 4 Kv Emergency Buses ML20206C5821999-04-20020 April 1999 Rev 4 to RW-C-100, Solid Radwaste Sys Process Control Program (Pcp) ML20205F6391999-03-29029 March 1999 Proposed Tech Specs Pages,Deleting Requirement for Refuel Platform Fuel Grapple Fully Retracted Position Interlock Currently Required by TS Surveillance Requirement 3.9.1.1 ML20207E2551999-03-0101 March 1999 Proposed Tech Specs Supporting PBAPS Mod P00507 Which Will Install Power Range Neutron Monitoring Sys Incorporate long-term T/H Stability Solution Hardware ML20202E6251998-12-31031 December 1998 PBAPS Unit 2 Cycle 13 Startup Rept. with ML20198N2531998-12-24024 December 1998 Proposed Tech Specs Revising Setpoints & Limits of Allowable Values for LOP Instrumentation for 4kV Emergency Buses Contained in TS Table 3.3.8.1-1, LOP Instrumentation ML20195J1651998-11-16016 November 1998 Rev D to LGS Emergency Preparedness NUMARC Eals ML20195J1541998-11-16016 November 1998 Rev D to PBAPS Emergency Preparedness NUMARC Eals ML20154C8271998-09-29029 September 1998 Proposed Tech Specs SR 3.6.4.1.2,revising Wording to Maintain Requirement That Secondary Containment Is Not Breached at Any Time When Secondary Containment Is Required ML20151Y3841998-09-14014 September 1998 Revised Proposed Final TS Pages for License Change Application ECR 97-02809,incorporating end-of-cycle Recirculation Pump Trip Sys at Units 2 & 3 ML20151Y3711998-09-11011 September 1998 Proposed Final TS Pages for License Change Application ECR 98-01403,revising SLMCPRs for Unit 2 ML20151Y3651998-09-11011 September 1998 Proposed Final TS Pages for License Change Applications ECR 96-02324 & 98-00499,revising MSIV Leakage & Safety Relief Valve Surveillance Testing ML20151T0421998-08-31031 August 1998 Proposed Final Tech Specs Pages for License Change Application ECR 97-02809,incorporating end-of-cycle Recirculation Pump Trip Sys at Plant ML20236W2201998-07-29029 July 1998 Proposed Tech Specs,Supporting Installation of Mod P00271 for Unit 2 Re Replacement of Source Range & Intermediate Range Monitors W/New Wide Range Neutron Monitoring Sys ML20236R3121998-07-10010 July 1998 Proposed Tech Specs Pages for License Change Application ECR 98-01403,revising TS Section 2.0.W/non-proprietary Addl Info Re 1.10 Cycle Specific SLMCPR Cycle 13 ML20236P7531998-07-0909 July 1998 Proposed Tech Specs Supporting Installation of Mod P00271, for Unit 2 Re Facility Operating License Change Request 93-18 ML20247C2611998-05-0101 May 1998 Proposed Tech Specs Deleting Requirements for Functional Testing of SRVs During Each Unit Startup ML20217K3651998-04-28028 April 1998 Proposed Tech Specs Bases Through Unit 2 Bases Rev 17 & Unit 3 Bases Rev 19 ML20206C5711998-04-16016 April 1998 Rev 11 to ODCM for Pbaps,Units 1 & 2 ML20217G7531998-03-20020 March 1998 Proposed Tech Specs Re end-of-cycle Recirculation Pump Trip Sys at Plant ML20217Q4711998-03-0202 March 1998 Proposed Tech Specs Adding Requirements to Achieve Compliance w/10CFR50.36a, TS on Effluents from Nuclear Power Reactors ML20202F4201998-02-0404 February 1998 Proposed Tech Specs Revising SR 3.6.4.1.2 & Associated Bases to Reflect Changes in Requirements for Secondary Containment Doors ML20202H4141998-01-31031 January 1998 Cycle 12 Startup Rept Unit 3 ML20211H9281997-09-26026 September 1997 Proposed Tech Specs,Replacing Page 2.0-1 & Adding Page 5.0-21 for Unit 3 ML20211F4001997-09-22022 September 1997 Proposed Tech Specs Replacing Source Range & Intermediate Range Monitors W/New Wide Range Neutron Monitoring Sys ML20141G4871997-06-30030 June 1997 Proposed Tech Specs,Revising TS Section 2.0, Safety Limits to Incorporate Revised SLMCPRs Due to Use of GE13 Fuel Product Line & cycle-specific Analysis Performed by GE ML20140D8601997-06-0404 June 1997 Proposed Tech Specs,Revising Section 3.8.2.1 to Eliminate Inconsistency Between Requirements for ECCS Operability & auto-start & Trip Bypass of of EDGs on ECCS Initiation Signal During Listed Events in Application ML20141L0111997-05-23023 May 1997 Proposed Tech Specs Revising Section 5.5.12 to Exclude Measured Main Steam Isolation Valves Leakage from Total Type B & C Local Leak Rate Test Results ML20141E0801997-05-0909 May 1997 Proposed Tech Specs 3.6.1.3.16,replacing Frequency of Primary Containment Purge & Exhaust Valve Inflatable Seals ML20141J0311997-05-0808 May 1997 Rev 7 to Pump & Valve IST Program Third Ten Yr Interval ML20137P7561997-03-31031 March 1997 Proposed Tech Specs,Extending Surveillance Interval for Calibr of Average Power Range Monitor Flow Bias Instrumentation from 18 Months to 24 Months ML20217M8301997-01-30030 January 1997 Rev 10 to ODCM, for Peach Bottom Atomic Power Station Units 1 & 2 ML20134A6751997-01-24024 January 1997 Cycle 12 Startup Rept Unit 2 ML20134F6121996-10-30030 October 1996 Proposed Tech Specs,Section 2.0,revising Slmcprs Due to GE Determination That Previous Calculation Is Nonconservative ML20138B0081996-09-27027 September 1996 Rev 3 to Solid Radwaste Sys Process Control Program (Pcp) ML20117L2891996-09-0606 September 1996 Proposed Tech Specs 3.3.5.1, ECCS Instrumentation, & 3.8.1, AC Sources-Operating ML20117F9471996-08-27027 August 1996 Proposed Tech Specs Re CRD Charging Water Header Pressure for Shutdown Margin Test ML20117H6761996-08-23023 August 1996 Proposed Tech Specs 2.0 Re Safety Limits ML20117M7041996-06-13013 June 1996 Proposed Tech Specs,Sr 3.3.1.1.12,for APRM Flow Biased High Scram Function,Allowing SR to Be Performed W/O Entering Associated Conditions & Required Actions for Up to Six H Provided Core Flow at or Above 82% ML20101K8131996-03-25025 March 1996 Proposed Tech Specs Section 2.0 Re Safety Limits ML20100J7591996-02-15015 February 1996 Proposed Tech Specs Re Implementation of 10CFR50,App J, Option B ML20096F1481996-01-16016 January 1996 Proposed Tech Specs Base Changes Re Implementation of Main Stack & Vent Stack Radiation Monitoring Sytems 1999-09-27
[Table view] |
Text
a -
Unit 2 l L - 6.2.3= Independent Safety Engineerino Group'(ISEGF
.g 4 .,
-Function-
=6.2.3;1 The ISEG shall function to responsively and proactively examine unit-
' operating characteristics, NRC issuances, industry advisories. Licensee Event Reports, and'other sources of unit design and operating experience information, including' units of-similar design, which may indicate areas for improving unit safety.; The ISEG shall make detailed recommendations for 1 revised procedures, equipment modifications, maintenance activities, operations activities, or other means of. improving unit safety. Such !
recomendations shall be submitted through the General Manager, Nuclear Quality Assurance to the Executive Vice President-Nuclear.
Composition
-6.2.3.2 The Peach Bottom ISEC'shall be composed of at least five dedicated, full-
= time engineers,: including the ISEG Superintendent, located onsite. The
. Peach Bottom ISEG shall meet all of.the following qualification requirements:-
- a. Each member shall have a bachelor's degree in engineering or related I science.
b._ The ISEG. Superintendent shall have-at least six years of full-time
-commercial nuclear. experience, 4
- c. Each of.the members shall have at least two years of full-time q comercial nuclear experience.- .
d.-- 'Not-more than one of the members shall have less than three years of
-full-time. commercial nuclear experience, e . -- . Excluding the experience of the Superintendent, the members collectively shall have at least 16 years of. full-time commercial- _
nuclear experience,
- f. The_lSEG-'(Superintendent included) collectively shall have the broad-rangelof knowledge and experience necessary to perform:the functions
'and responsibilities specified:in 6.2.3.1 and 6.2.3~.3.
Responsibilities !
6.2.3.3-1TheilSEG;shall be-responsible for maintaining surveillance of unit-activities to provide independent verification
- that these activities are
_ performed correctly and that human errors are reduced.as much as practical.:
q Authority 6.2.3.4J TheilSEG reports to the General Manager, Nuclear Quality Assurance. If any significant; nuclear quality concern identified by the ISEG is not adequately resolved,-the General; Manager, Nuclear Quality Assurance shall notify the:
-Nuclear Review Board, the Executive Vice President-Nuclear,'the President,
,or the Nuclear-Committee of-the Board. .- If the ISEG is not satisfied with-the resolution of any significant nuclear quality concern by the General Manager, Nuclear Quality Assurance, the ISEG shall notify the Nuclear Review-
- Board =of that concern.
Records- i 6.2.3.5 Records:of_ activities performed by.the ISEG shall be prepared,-maintained, andeforwarded each calendar month to the General Manager, Nuclear Quality' Assurance.
- Not responsible for sign-off function j 9102190135 910213 '
PDR ADOCK 05000277 -245b-P= PDR
Unit 35 .
,-6.2.3 Independent: Safety Engineer [ng Group (ISEGF I- t Function-J (6.2.3.1L l The ISEGL shall function to responsively and proactively examine unit 7 operating characteristics, NRC issuances, industry advisories Licensee
. Event Reports. and other sources of unit. design and operating experience
~
'i information,~:includingiunits of simila' design, which may-indicate areas for improving ~ unit safety.L The ISEG:shall make detailed recommendations for:
-revised. procedures,fequipment modifications, maintenance activities, )
-operations activities, or other means of improving unit safety. .Such i
~r ecommendations shall be submitted through the General Manager, Nuclear- '
-Quality Assurance to the Executive Vice President-Nuclear.
7 Composition
~
6.2.3.2 The Peach-Bottom ISEG'shall be composed of at least five dedicated, full-time engineers, including the ISEG Superintendent, located onsite.1 The. -
Peach Bottom ISEG shall' meet all of the following qualification
.~ requirements::
a.- Each member shall have a bachelor's degree in engineering or related
. science. . ;
- b. The ISEG' Superintendent shall have at least six years of-full-time f commercialf nuclear-experience. j
- c. Each of the members shall-have at least two_ years of full-time r
> commercial nuclear exper_ience, d.. 'Not more than'one'of the members shall have .less than_three years of-
-full-time commercial nuclear experience. _.
- e. Excluding the experience of the Superintendent, the members' collectively ~shall have at-least 16 years of full-time commercial nucleari e~xperience.~
- f. - The ISEG (Superintendent included)' collectively shall have the broad J range of knowledge and experience necessary to perform 4the functicns -
, 'and responsibilities:specifiedlin 6'.2.3.1 and 6.2.3.3- 4 t
~ Responsibilities t6.2.-3.3 The ISEG shall be responsible for maintaining surveillance of unit-
- activities'.to: provide' independent verification
- that;these activities are -
performed correctly and that human. errors:are' reduced as much as practical...
-Authority 6.2.3 A TheDISEG reports tolthe General Manager, Nuclear . Quality Assurance. -If-any q significant nuclear quality'; concern _-identified by the.ISEG is not adequately-
- resolved, the General; Hanager, Nuclear Quality Assurance'shall- notify the-Nuclear-Review Board, the Executive Vice President-Nuclear,ethezPresident,
'or the Nuclear Committee of the-Board. If~the ISEG is not satisfied'with.
theiresolution of'any signif' cant nuclear quality. concern by the General.
- Manager,L H uclear Quality Assurance, the'ISEG-shall notify the Nuclear' Review-
. Board of that concern.
Records-6.2.~3.5 Records.of, activities performed.by the ISEG shall be prepared, maint'ained -
.and forwarded each calendar month to the General Manager, Nuclear Quality Assurance.
- Not responsible for sign-off function l
q
-245b- ">
. . - . -, - . , - . . . - . .. -