ML20066G445

From kanterella
Revision as of 12:04, 21 December 2020 by StriderTol (talk | contribs) (StriderTol Bot change)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Proposed Tech Specs Revising 900226 Submittal by Adding Title of President to Tech Spec 6.2.3.4
ML20066G445
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 02/13/1991
From:
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To:
Shared Package
ML20066G443 List:
References
NUDOCS 9102190135
Download: ML20066G445 (2)


Text

a -

Unit 2 l L - 6.2.3= Independent Safety Engineerino Group'(ISEGF

.g 4 .,

-Function-

=6.2.3;1 The ISEG shall function to responsively and proactively examine unit-

' operating characteristics, NRC issuances, industry advisories. Licensee Event Reports, and'other sources of unit design and operating experience information, including' units of-similar design, which may indicate areas for improving unit safety.; The ISEG shall make detailed recommendations for 1 revised procedures, equipment modifications, maintenance activities, operations activities, or other means of. improving unit safety. Such  !

recomendations shall be submitted through the General Manager, Nuclear Quality Assurance to the Executive Vice President-Nuclear.

Composition

-6.2.3.2 The Peach Bottom ISEC'shall be composed of at least five dedicated, full-

= time engineers,: including the ISEG Superintendent, located onsite. The

. Peach Bottom ISEG shall meet all of.the following qualification requirements:-

a. Each member shall have a bachelor's degree in engineering or related I science.

b._ The ISEG. Superintendent shall have-at least six years of full-time

-commercial nuclear. experience, 4

c. Each of.the members shall have at least two years of full-time q comercial nuclear experience.- .

d.-- 'Not-more than one of the members shall have less than three years of

-full-time. commercial nuclear experience, e . -- . Excluding the experience of the Superintendent, the members collectively shall have at least 16 years of. full-time commercial- _

nuclear experience,

f. The_lSEG-'(Superintendent included) collectively shall have the broad-rangelof knowledge and experience necessary to perform:the functions

'and responsibilities specified:in 6.2.3.1 and 6.2.3~.3.

Responsibilities  !

6.2.3.3-1TheilSEG;shall be-responsible for maintaining surveillance of unit-activities to provide independent verification

  • that these activities are

_ performed correctly and that human errors are reduced.as much as practical.:

q Authority 6.2.3.4J TheilSEG reports to the General Manager, Nuclear Quality Assurance. If any significant; nuclear quality concern identified by the ISEG is not adequately resolved,-the General; Manager, Nuclear Quality Assurance shall notify the:

-Nuclear Review Board, the Executive Vice President-Nuclear,'the President,

,or the Nuclear-Committee of-the Board. .- If the ISEG is not satisfied with-the resolution of any significant nuclear quality concern by the General Manager, Nuclear Quality Assurance, the ISEG shall notify the Nuclear Review-

Board =of that concern.

Records- i 6.2.3.5 Records:of_ activities performed by.the ISEG shall be prepared,-maintained, andeforwarded each calendar month to the General Manager, Nuclear Quality' Assurance.

  • Not responsible for sign-off function j 9102190135 910213 '

PDR ADOCK 05000277 -245b-P= PDR

Unit 35 .

,-6.2.3 Independent: Safety Engineer [ng Group (ISEGF I- t Function-J (6.2.3.1L l The ISEGL shall function to responsively and proactively examine unit 7 operating characteristics, NRC issuances, industry advisories Licensee

. Event Reports. and other sources of unit. design and operating experience

~

'i information,~:includingiunits of simila' design, which may-indicate areas for improving ~ unit safety.L The ISEG:shall make detailed recommendations for:

-revised. procedures,fequipment modifications, maintenance activities, )

-operations activities, or other means of improving unit safety. .Such i

~r ecommendations shall be submitted through the General Manager, Nuclear- '

-Quality Assurance to the Executive Vice President-Nuclear.

7 Composition

~

6.2.3.2 The Peach-Bottom ISEG'shall be composed of at least five dedicated, full-time engineers, including the ISEG Superintendent, located onsite.1 The. -

Peach Bottom ISEG shall' meet all of the following qualification

.~ requirements::

a.- Each member shall have a bachelor's degree in engineering or related

. science. .  ;

b. The ISEG' Superintendent shall have at least six years of-full-time f commercialf nuclear-experience. j
c. Each of the members shall-have at least two_ years of full-time r

> commercial nuclear exper_ience, d.. 'Not more than'one'of the members shall have .less than_three years of-

-full-time commercial nuclear experience. _.

e. Excluding the experience of the Superintendent, the members' collectively ~shall have at-least 16 years of full-time commercial nucleari e~xperience.~
f. - The ISEG (Superintendent included)' collectively shall have the broad J range of knowledge and experience necessary to perform 4the functicns -

, 'and responsibilities:specifiedlin 6'.2.3.1 and 6.2.3.3- 4 t

~ Responsibilities t6.2.-3.3 The ISEG shall be responsible for maintaining surveillance of unit-

activities'.to: provide' independent verification
  • that;these activities are -

performed correctly and that human. errors:are' reduced as much as practical...

-Authority 6.2.3 A TheDISEG reports tolthe General Manager, Nuclear . Quality Assurance. -If-any q significant nuclear quality'; concern _-identified by the.ISEG is not adequately-

resolved, the General; Hanager, Nuclear Quality Assurance'shall- notify the-Nuclear-Review Board, the Executive Vice President-Nuclear,ethezPresident,

'or the Nuclear Committee of the-Board. If~the ISEG is not satisfied'with.

theiresolution of'any signif' cant nuclear quality. concern by the General.

Manager,L H uclear Quality Assurance, the'ISEG-shall notify the Nuclear' Review-

. Board of that concern.

Records-6.2.~3.5 Records.of, activities performed.by the ISEG shall be prepared, maint'ained -

.and forwarded each calendar month to the General Manager, Nuclear Quality Assurance.

  • Not responsible for sign-off function l

q

-245b- ">

. . - . -, - . , - . . . - . .. -