MONTHYEARML20095A6001992-04-13013 April 1992 NPDES Noncompliance Notification:On 920306,daily Max Total Residual Chlorine Effluent Limitation Exceeded.Caused by Malfunction of Chlorination Pump Stroke Adjustment Control. Maint Work Request Initiated to Repair Pump Control ML20100R7611992-04-13013 April 1992 NPDES Noncompliance Notification:On 920219,daily Max Total Residual Chlorine Effluent Exceeded.Caused by Lack of Dechlorination Dilution Water Flow.Chemistry Analytical Methods & Procedures Changed ML20090J5851992-03-0606 March 1992 NPDES Noncompliance Notification:On 920304,daily Max Total Residual Chlorine Effluent Limitation Was Exceeded. Investigation Into Incident Commenced.Ltr Outlining Results of Investigation & Corrective Actions,If Any,Will Be Sent ML20092K3961992-02-19019 February 1992 NPDES Noncompliance Notification:On 920214,daily Max Total Residual Chlorine Effluent Limitation Exceeded at Outfall 002.Investigation Underway ML20248C6381989-09-29029 September 1989 NPDES Noncompliance Notification:On 890718,24 & 0804,total Residual Chlorine Limitation Exceeded.Storage Tank & Containment Dike Repaired & Personnel Counseled ML20245G8601989-08-0808 August 1989 NPDES Noncompliance Notification:On 890804,daily Max Total Residual Chlorine Effluent Limitation in Cooling Water Discharge (Outfall 002) Exceeded.Investigation Underway. Results of Investigation Will Be Submitted ML20245F5041989-08-0404 August 1989 NPDES Noncompliance Notification:On 890718 & 24,daily Max Total Residual Chlorine Effluent Limitation Was Exceeded. Investigation Into Events Commenced ML20155E2681988-06-0303 June 1988 NPDES Noncompliance Notification:On 880525,daily Max Total Residual Chlorine Limitation Exceeded.Caused by Failure of Temporary Dechlorinating Sys to Provide Adequate Vol of Sodium Bisulfate.Permanent Flowmeter Will Be Installed ML20214L5941987-05-22022 May 1987 NPDES Noncompliance Notification:On 870428 & 29,daily Max Total Residual Chlorine (TRC) Limitation Exceeded.Caused by Sodium Bisulfate Pump Failure During Chlorination.Personnel Counseled Re Correct TRC Limitation ML20077P0761983-09-0606 September 1983 NPDES Noncompliance Notification:On 830824,daily Max Ph Effluent Limitation Exceeded.Cause Unknown.Investigation Underway ML20072J2941983-06-23023 June 1983 NPDES Noncompliance Notification:On 830525,pH of Retention Pord Discharge Exceeded Limits.Caused by Leaks in Retaining Board Used to Siphon Sludge from Pond to Discharge.Leaks Repaired on 830526 ML20023D8651983-05-27027 May 1983 NPDES Noncompliance:On 830525,daily Max Ph Effluent Limit Exceeded.Util Commenced Investigation of Incident.Ltr to Be Sent to Dept of Natural Resources Outlining Results & Corrective Action ML20071G7931983-05-18018 May 1983 NPDES Noncompliance Notification:On 830429,pH of Retention Pond Discharge Found Above Limit.Caused by Demineralized Makeup Water Treatment Sys Problems Re Undissolved Line Carrying Through to Pressure Filter Sys ML20023D0981983-05-12012 May 1983 Followup to 830331 NPDES Noncompliance Notification. on 830316 & 17,retention Pond Discharge (Sample Point 501) Exceeded Ph Limit.Caused by Carryover of Lime from Water Treatment Sys ML20074A4261983-05-0505 May 1983 NPDES Noncompliance Notification:On 830429,daily Max Ph Effluent Limit Exceeded.Investigation Will Include Review of Sampling & Analysis Techniques,Insp of Treatment Equipment & Review of Operator Logs ML20073G4451983-04-12012 April 1983 NPDES Noncompliance Notification:On 830406,retention Pond Max Ph Effluent Limitation Exceeded.Investigation in Progress ML20069H9161983-03-31031 March 1983 NPDES Noncompliance Notification:On 830316 & 17,daily Max Ph Effluent Limitation Exceeded Allowable Limits.Cause Under Investigation 1992-04-13
[Table view] Category:TEXT-ENVIRONMENTAL REPORTS
MONTHYEARML20209B5091998-12-31031 December 1998 Errata to Pbnp 1998 Annual Monitoring Rept ML20206E2551998-12-31031 December 1998 Annual Monitoring Rept for 1998, for Pbnps Units 1 & 2 L-98-302, Number of Personnel & Rem by Work & Job Function for 19971997-12-31031 December 1997 Number of Personnel & Rem by Work & Job Function for 1997 NPL-98-0302, Number of Personnel & Rem by Work & Job Function for 19971997-12-31031 December 1997 Number of Personnel & Rem by Work & Job Function for 1997 ML20217P2761997-12-31031 December 1997 Annual Monitoring Rept for 1997, for Point Beach Nuclear Plant ML20138B1691997-02-0505 February 1997 Radiological Environ Monitoring Program for Palisades Nuclear Generating Plant,Jan-Dec 1996 ML20138E0371996-12-31031 December 1996 Revised, Annual Monitoring Rept for Jan-Dec 1996 ML20138B1521996-12-31031 December 1996 Annual Monitoring Rept for Jan 1996 Through Dec 1996 ML20138B2691996-12-31031 December 1996 Revised, Annual Monitoring Rept for Jan 1996 - Dec 1996 NPL-97-0181, Annual Monitoring Rept for Jan-Dec 19961996-12-31031 December 1996 Annual Monitoring Rept for Jan-Dec 1996 ML20107L6091995-12-31031 December 1995 Annual Monitoring Rept 1995 NPL-96-0055, 1995 Annual Results & Data Rept, for Point Beach Nuclear Plant Units 1 & 21995-12-31031 December 1995 1995 Annual Results & Data Rept, for Point Beach Nuclear Plant Units 1 & 2 ML20080K2631994-12-31031 December 1994 Semiannual Monitoring Rept Jul-Dec 1994 ML20072P1021994-06-30030 June 1994 Semiannual Monitoring Rept Jan-June 1994 ML20067C8031993-12-31031 December 1993 Semiannual Monitoring Rept Jul-Dec 1993 for Point Beach Nuclear Plant Units 1 & 2 ML20056F8081993-06-30030 June 1993 Semiannual Monitoring Rept,Jan-June 1993 for Pbnp,Units 1 & 2 ML20114D3851992-06-30030 June 1992 Semiannual Monitoring Rept for Jan-June 1992 for Point Beach Nuclear Plant Units 1 & 2 ML20095A6001992-04-13013 April 1992 NPDES Noncompliance Notification:On 920306,daily Max Total Residual Chlorine Effluent Limitation Exceeded.Caused by Malfunction of Chlorination Pump Stroke Adjustment Control. Maint Work Request Initiated to Repair Pump Control ML20100R7611992-04-13013 April 1992 NPDES Noncompliance Notification:On 920219,daily Max Total Residual Chlorine Effluent Exceeded.Caused by Lack of Dechlorination Dilution Water Flow.Chemistry Analytical Methods & Procedures Changed ML20090J5851992-03-0606 March 1992 NPDES Noncompliance Notification:On 920304,daily Max Total Residual Chlorine Effluent Limitation Was Exceeded. Investigation Into Incident Commenced.Ltr Outlining Results of Investigation & Corrective Actions,If Any,Will Be Sent ML20092K3961992-02-19019 February 1992 NPDES Noncompliance Notification:On 920214,daily Max Total Residual Chlorine Effluent Limitation Exceeded at Outfall 002.Investigation Underway ML20094N9571991-12-31031 December 1991 Environ Radiological Monitoring Program for Point Beach Nuclear Plant Two Rivers,WI,1991, Final Monthly Progress Rept ML20090B9981991-12-31031 December 1991 Semiannual Monitoring Rept, Jul-Dec 1991 ML20118B1961991-12-31031 December 1991 State of Wi 1991 Point Beach Environ Radioactivity Survey ML20082K8521991-06-30030 June 1991 Semiannual Monitoring Rept for 910101-0630 ML20073H9611990-12-31031 December 1990 Environ Radiological Monitoring Program for Point Beach Nuclear Plant for Jan-Dec 1990 ML20064A4731990-06-30030 June 1990 Semiannual Monitoring Rept,Jan-June 1990 ML20012B7281989-12-31031 December 1989 Personnel Exposure & Monitoring CY89. W/900308 Ltr ML20248C6381989-09-29029 September 1989 NPDES Noncompliance Notification:On 890718,24 & 0804,total Residual Chlorine Limitation Exceeded.Storage Tank & Containment Dike Repaired & Personnel Counseled ML20245G8601989-08-0808 August 1989 NPDES Noncompliance Notification:On 890804,daily Max Total Residual Chlorine Effluent Limitation in Cooling Water Discharge (Outfall 002) Exceeded.Investigation Underway. Results of Investigation Will Be Submitted ML20245F5041989-08-0404 August 1989 NPDES Noncompliance Notification:On 890718 & 24,daily Max Total Residual Chlorine Effluent Limitation Was Exceeded. Investigation Into Events Commenced ML20246F4821989-06-30030 June 1989 Semiannual Monitoring Rept,Jan-June 1989 ML20235S9601988-12-31031 December 1988 Personnel Exposure & Monitoring,Cy 1988 ML20235R9331988-12-31031 December 1988 Semiannual Monitoring Rept,Jul-Dec 1988 ML20153B9231988-06-30030 June 1988 Semiannual Monitoring Rept,Jan-June 1988 ML20155E2681988-06-0303 June 1988 NPDES Noncompliance Notification:On 880525,daily Max Total Residual Chlorine Limitation Exceeded.Caused by Failure of Temporary Dechlorinating Sys to Provide Adequate Vol of Sodium Bisulfate.Permanent Flowmeter Will Be Installed ML20149N1091987-12-31031 December 1987 Semiannual Monitoring Rept,Jul-Dec 1987 ML20153D7031987-12-31031 December 1987 1987 La Crosse BWR Environ Radioactivity Survey ML20153D7081987-12-31031 December 1987 1987 Point Beach Environ Radioactivity Survey ML20196E4681987-12-31031 December 1987 Personnel Exposure & Monitoring Rept for 1987 ML20237K4381987-06-30030 June 1987 Semiannual Monitoring Rept,Jan-June 1987 ML20214L5941987-05-22022 May 1987 NPDES Noncompliance Notification:On 870428 & 29,daily Max Total Residual Chlorine (TRC) Limitation Exceeded.Caused by Sodium Bisulfate Pump Failure During Chlorination.Personnel Counseled Re Correct TRC Limitation ML20211Q7151986-12-31031 December 1986 Semiannual Monitoring Rept for Jul-Dec 1986 ML20211Q7231986-12-31031 December 1986 Annual Results & Data Rept 1986 ML20209C7461986-06-30030 June 1986 Semiannual Monitoring Rept for Jan-June 1986 ML20137Z7551985-12-31031 December 1985 Semiannual Monitoring Rept,Jul-Dec 1985 ML20154G3661985-12-31031 December 1985 State of Wi 1985 Point Beach Environ Radioactivity Survey ML20134N1271985-06-30030 June 1985 Semiannual Monitoring Rept,Jan-June 1985 ML20127N4531985-05-14014 May 1985 Notice of Environ Assessment & Finding of No Significant Impact Re Requests for Exemption from 10CFR50,App R Requirements ML20126L7791984-12-31031 December 1984 State of Wi 1984 LACBWR Environ Radioactivity Survey 1998-12-31
[Table view] |
Text
s. , e Wisconsin Electnc POWER COMPANY 231 W Meh.ocn PO. Box 2046. NWoukee wi 53201 (.1W) 2212345 June 3, 1988 VPNPD-88-316 Wisconsin Department of Natural Resources WPDES Permit Section P. O. Box 7921 Madison, WI 53707 Gentlemen:
WPDES PERMIT N0. WI-D000957-3 POINT BEACH NUCLEAR PLANT On May 25, 1988, the company notified the Department that the daily maximum total residual chlorine (TRC) limitation was exceeded at the Point Beach Nuclear Plant. The TRC concentration in the Unit I discharge (sample point 001) was 0.37 mg/l on May 25, 1988. The following summarizes the results of our investigation. -
The exceedance was due to the failure of the temporary dechlorinating system to provide an adequate volume of sodium bisulfite to dechlorinate the Unit I discharge. The sodium bisulfite is drawn by vacuum suction from the sodium bisulfite tank to Unit 1. A temporary blockage in the sodium bisulfite discharge line allowed chlorinated water to be discharged without dechlorina-tion. This discharge occurred for approximately 24 minutes. Although the company had orderad a flowmeter for that line, it was on backorder and had not been received at the time of the incident. A temporary flow indicator has been installed in the sodium bisulfite line and the permanent flowmeter, which is still on backorder, will be installed as soon as it arrives. In the future, operating personnel will check the flow sensor to verify that the sodium bisulfite feed system is cperating prior to beginning the chlorination.
Very truly yours, e