ML20205F663
From kanterella
ML20205F663 | |
Person / Time | |
---|---|
Site: | Vermont Yankee ![]() |
Issue date: | 03/04/1999 |
From: | Gmyrek M, Goodwin E, Hsieh J DUKE ENGINEERING & SERVICES |
To: | |
Shared Package | |
ML20205F577 | List: |
References | |
VY9123-TD01, VY9123-TD01-R00, VY9123-TD1, VY9123-TD1-R, NUDOCS 9904060352 | |
Download: ML20205F663 (5) | |
Similar Documents at Vermont Yankee | |
---|---|
Category:GENERAL EXTERNAL TECHNICAL REPORTS
MONTHYEARML20196G5071999-06-23023 June 1999
[Table view]Vynp Assessment of On-Site Disposal of Contaminated Soil by Land Spreading ML20205S4211999-04-16016 April 1999 Non-proprietary Version of Revised Page 4-3 of HI-981932 Technical Rept for Vermont Yankee Spent Fuel Pool Storage Expansion ML20205F6631999-03-0404 March 1999 Jet Pump Riser Weld Leakage Evaluation ML20151U0361998-08-28028 August 1998 Non-proprietary Rev 1 to Holtec Rept HI-981932, Vermont Yankee Nuclear Power Station Spent Storage Expansion Project ML20205F6491998-07-31031 July 1998 Rev 1 to GE-NE-B13-01935-02, Jet Pump Assembly Welds Flaw Evaluation Handbook for Vermont Yankee ML20236G0011998-06-30030 June 1998 Individual Plant Exam External Events ML20247J8341998-05-31031 May 1998 Peak Suppression Pool Temp Analyses for Large Break LOCA Scenarios, for May 1998 ML20247E6521998-04-30030 April 1998 Rev 0 to GE-NE-B13-01935-01, Jet Pump Riser Welds for RS-1 Indications Evaluation Rept for Vermont Yankee ML20247E6351998-04-30030 April 1998 Rev 1 to GE-NE-B13-01935-LTR, Jet Pump Riser Welds Allowable Flaw Sizes Ltr Rept for Vermont Yankee ML20247E6221998-04-30030 April 1998 Final Rept of Rev 0 to 1HQXE, Vynp Unit 1 Recirculation Inlet Riser Ultrasonic Exam A34600, Hydrodynamic Mass & Acceleration Drag Vol of Vermont Yankee ECCS Strainers1998-03-13013 March 1998 Hydrodynamic Mass & Acceleration Drag Vol of Vermont Yankee ECCS Strainers ML20210T5551997-09-10010 September 1997 Addl Benchmarking of BWR Using CASMO-3/SIMULATE-3 ML20210H1111997-07-0707 July 1997 Consequence Evaluation of Vynp Class 1 Piping in Support of ASME Code Case N-560 ML20148D8581997-05-0707 May 1997 Advanced Offgas Follow-up Rept ML20138H3351997-04-28028 April 1997 Tech Specs for Offsite Power ML20138H3081997-04-28028 April 1997 Compliance W/Sbo Regulation ML20107D5951996-04-30030 April 1996 Rev 0 to Vermont Yankee Nuclear Power Station Core Shroud Repair Summary ML20094D8351995-09-22022 September 1995 Method for Power/Flow Exclusion Region Calculation Using LAPUR5 Computer Code ML20086S3141995-07-20020 July 1995 Vynp 1995 Summary Rept for Repairs & Replacements 931001- 950505 ML20086K4581995-06-20020 June 1995 Inside Surface Ultrasonic Technique Capabilities as Demonstrated for Insp of FW Nozzles Final Rept ML20106G5451995-01-17017 January 1995 Investigation of Certain Anonymous Allegations Re Advanced Off-Gas Sys at Vermont Yankee Nuclear Power Station ML20097A5281992-05-29029 May 1992 Rev 1 to Decommissioning Funding Assurance Rept & Certification Submitted Per 10CFR50.33(k)(2),10CFR30.35 & 10CFR50.75,Vermont Yankee Nuclear Power Station ML20101S1261992-05-15015 May 1992 Application to Dispose in Place Contaminated Soil ML20086G4141991-11-0606 November 1991 Emergency Response Exercise Manual 1991 ML20091B2281991-01-31031 January 1991 Simulator Certification Rept,Vermont Yankee Training Dept Jan 1991 ML20247G9901989-06-30030 June 1989 Rev 0 to Vermont Yankee Cycle 14 Core Operating Limits Rept ML20245L1821989-06-30030 June 1989 Method for Generation of One-Dimensional Kinetics Data for RETRAN-02 ML20247G2531989-03-21021 March 1989 Rev 3 to Vermont Yankee Procedure Generation Package ML20151E0111988-07-15015 July 1988 Impact of Alternate Testing on Component & Sys Availability ML20151H9581988-04-30030 April 1988 CASMO-3G Validation ML20154K3351988-04-29029 April 1988 Rept on Containment Safety at Vermont Yankee ML20147G3371988-02-29029 February 1988 Justification for Long-Term Operation for Vermont Yankee Core Spray Nozzle Weld Overlays ML20153H0451987-12-31031 December 1987 Shutdown Assessment of Vermont Yankee Nuclear Power Facility, Interim Rept to State of Vt General Assembly ML20216J6571987-06-25025 June 1987 Dcrdr Summary Rept Suppl for Vermont Yankee Nuclear Power Plant ML20234D8131987-05-31031 May 1987 Cycle 13 Core Performance Analysis ML20206H7331987-03-31031 March 1987 Thermal Effects on Precoat Matl for Spent Fuel Pool Filter/ Demineralizers,Vermont Yankee Nuclear Power Station ML20205Q5421987-03-31031 March 1987 Evaluation of Matl Performance Suitability of New Vermont Yankee Spent Fuel Storage Rack Design ML20207Q3461987-01-12012 January 1987 Justification for Multi-Cycle Operation for Vermont Yankee Core Spray Nozzle Weld Overlays ML20214K6871986-08-31031 August 1986 Vols 1 & 2 to Dcrdr Implementation Task Team Final Rept, Supplementary NRC Matl. W/Two Oversize Encls ML20212Q2731986-08-31031 August 1986 Containment Safety Study ML20204F6001986-07-30030 July 1986 Revised SAR for Vermont Yankee Spds ML20210S2391986-06-25025 June 1986 High Risk:Ge Mark I Pressure-Suppression Design. Public Citizen Press Release Re Natl Coalition of Citizen Groups Petitions NRC to Revoke CPs for New Nuclear Plants Encl ML20203K8191986-04-30030 April 1986 Spent Fuel Storage Rack Replacement Rept ML20204G7371986-04-22022 April 1986 IHSI Weld Package for Vermont Yankee Nuclear Power Station ML20128E4131985-07-0101 July 1985 Dcrdr Summary Rept for Vermont Yankee Nuclear Power Plant ML20128P0891985-05-21021 May 1985 Rept of Investigation Carried Out by Ropes & Gray of Apparent False Documentation of Results of Receipt Insps at Vermont Yankee Nuclear Power Station ML20117A1071985-04-0808 April 1985 Safe Shutdown Capability Analysis ML20154N4811985-01-31031 January 1985 Rev 0 to Mark I Wetwell to Drywell Differential Pressure Load & Vacuum Breaker Response for Vermont Yankee Generation Station ML20101S8291985-01-31031 January 1985 Functional SPDS Sar ML20094M9991984-08-10010 August 1984 Rev 2 to Environ Qualification Master Equipment List 1999-06-23 Category:TEXT-SAFETY REPORT MONTHYEARML20217L8831999-10-21021 October 1999
[Table view]Safety Evaluation Supporting Proposed Alternatives to Code Requirements Described in RR-V17 & RR-V18 ML20217G2041999-10-13013 October 1999 Safety Evaluation Supporting Amend 179 to License DPR-28 BVY-99-127, Monthly Operating Rept for Sept 1999 for Vermont Yankee Nuclear Power Station.With1999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for Vermont Yankee Nuclear Power Station.With ML20212C2551999-09-17017 September 1999 Safety Evaluation Supporting Amend 175 to License DPR-28 BVY-99-112, Monthly Operating Rept for Aug 1999 for Vermont Yankee.With1999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Vermont Yankee.With BVY-99-109, Ro:On 990812,stack Ng Effluent Instrumentation for PAM Was Declared Oos.Caused by Instrument Drift Due to Electronic Components Based on Insps by Instrumentation & Controls Dept.Detector & Preamplifier Will Be Replaced on 9908311999-08-19019 August 1999 Ro:On 990812,stack Ng Effluent Instrumentation for PAM Was Declared Oos.Caused by Instrument Drift Due to Electronic Components Based on Insps by Instrumentation & Controls Dept.Detector & Preamplifier Will Be Replaced on 990831 BVY-99-102, Monthly Operating Rept for July 1999 for Vermont Yankee. with1999-07-31031 July 1999 Monthly Operating Rept for July 1999 for Vermont Yankee. with ML20209J0081999-07-14014 July 1999 Special Rept:On 990615,diesel Driven Fire Pump Failed to Achieve Rated Flow of 2500 Gallons Per Minute.Pump Was Inoperable for Greater than 7 Days.Corrective Maint Was Performed to Reset Pump Lift Setting BVY-99-090, Monthly Operating Rept for June 1999 for Vermont Yankee Nuclear Power Station.With1999-06-30030 June 1999 Monthly Operating Rept for June 1999 for Vermont Yankee Nuclear Power Station.With ML20196G5071999-06-23023 June 1999 Vynp Assessment of On-Site Disposal of Contaminated Soil by Land Spreading BVY-99-077, Monthly Operating Rept for May 1999 for Vermont Yankee Nuclear Power Station.With1999-05-31031 May 1999 Monthly Operating Rept for May 1999 for Vermont Yankee Nuclear Power Station.With BVY-99-068, Monthly Operating Rept for Apr 1999 for Vynp.With1999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for Vynp.With ML20206E8741999-04-29029 April 1999 SER Determined That Flaw Evaluation Meets Rules of ASME Code & Assumed Crack Growth Rate Adequate for Application ML20206D9301999-04-27027 April 1999 1999 Emergency Preparedness Exercise 990427 Exercise Manual (Plume Portion) ML20205S4211999-04-16016 April 1999 Non-proprietary Version of Revised Page 4-3 of HI-981932 Technical Rept for Vermont Yankee Spent Fuel Pool Storage Expansion ML20205K7581999-04-0707 April 1999 Safety Evaluation Supporting Alternative Proposal for Reexamination of Circumferential Welds with Detected Flaw Indications in Plant RPV BVY-99-046, Monthly Operating Rept for Mar 1999 for Vermont Yankee Nuclear Power Station.With1999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for Vermont Yankee Nuclear Power Station.With ML20205F6631999-03-0404 March 1999 Jet Pump Riser Weld Leakage Evaluation BVY-99-035, Monthly Operating Rept for Feb 1999 for Vermont Yankee Nuclear Station.With1999-02-28028 February 1999 Monthly Operating Rept for Feb 1999 for Vermont Yankee Nuclear Station.With ML20205P8241999-02-28028 February 1999 Rev 2 to Vermont Yankee Cycle 20 Colr ML20203H9881999-02-18018 February 1999 SER Accepting Alternative to 10CFR50.55a(g)(6)(ii)(A) Augmented Reactor Vessel Exam at Vermont Yankee Nuclear Power Station.Technical Ltr Rept Encl ML20203A6951999-02-0404 February 1999 Revised Rev 2,App B to Vermont Yankee Operational QA Manual (Voqam) ML20199K7151999-01-21021 January 1999 Corrected Safety Evaluation Supporting Amend 163 Issued to FOL DPR-28.Pages 2 & 3 Required Correction & Clarification ML20199K6991999-01-20020 January 1999 Safety Evaluation Concluding That Request to Use YAEC-1339, Yankee Atomic Electric Co Application of FIBWR2 Core Hydraulics Code to BWR Reload Analysis, at Vermont Yankee Acceptable ML20199L5951999-01-14014 January 1999 Safety Evaluation Accepting Licensee Proposed Alternative to Code Requirement,Described in Rev 2 to Pump Relief Request RR-P10 Pursuant to 10CFR50.55a(a)(3)(i) BVY-99-071, Corp 1998 Annual Rept. with1998-12-31031 December 1998 Corp 1998 Annual Rept. with BVY-99-001, Monthly Operating Rept for Dec 1998 for Vermont Yankee Nuclear Power Station1998-12-31031 December 1998 Monthly Operating Rept for Dec 1998 for Vermont Yankee Nuclear Power Station ML20198H5481998-12-23023 December 1998 Rev 2 to Vermont Operational QA Manual,Voqam ML20196H8641998-12-0101 December 1998 Cycle 19 Operating Rept BVY-98-163, Monthly Operating Rept for Nov 1998 for Vermont Yankee Nuclear Power Station.With1998-11-30030 November 1998 Monthly Operating Rept for Nov 1998 for Vermont Yankee Nuclear Power Station.With ML20195C4161998-11-0909 November 1998 SER Accepting Request That NRC Approve ASME Code Case N-560, Alternative Exam Requirement for Class 1,Category B-J Piping Welds BVY-98-154, Monthly Operating Rept for Oct 1998 for Vermont Yankee Nuclear Power Station.With1998-10-31031 October 1998 Monthly Operating Rept for Oct 1998 for Vermont Yankee Nuclear Power Station.With ML20155B6471998-10-26026 October 1998 Safety Evaluation Accepting Jet Pump Riser Insp Results & Flaw Evaluation,Conducted During 1998 Refueling Outage ML20154N0891998-10-16016 October 1998 Rev 1 to Vermont Operational QA Program Manual (Voqam) ML20154B6951998-10-0101 October 1998 SER Re Licensee Response to GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves, for Vermont Yankee Nuclear Power Station BVY-98-149, Monthly Operating Rept for Sept 1998 for Vermont Yankee Nuclear Power Station.With1998-09-30030 September 1998 Monthly Operating Rept for Sept 1998 for Vermont Yankee Nuclear Power Station.With ML20239A1361998-09-0202 September 1998 SER Re License Request for NRC Review & Concurrence W/Changes to NRC-approved Fire Protection Program BVY-98-135, Monthly Operating Rept for Aug 1998 for Vermont Yankee Nuclear Power Station.With1998-08-31031 August 1998 Monthly Operating Rept for Aug 1998 for Vermont Yankee Nuclear Power Station.With ML20151U0361998-08-28028 August 1998 Non-proprietary Rev 1 to Holtec Rept HI-981932, Vermont Yankee Nuclear Power Station Spent Storage Expansion Project ML20237E9221998-08-20020 August 1998 Vynp 1998 Form NIS-1 Owners Summary Rept for ISI, 961103-980603 BVY-98-122, Monthly Operating Rept for July 1998 for Vermont Yankee Nuclear Power Station1998-07-31031 July 1998 Monthly Operating Rept for July 1998 for Vermont Yankee Nuclear Power Station ML20205F6491998-07-31031 July 1998 Rev 1 to GE-NE-B13-01935-02, Jet Pump Assembly Welds Flaw Evaluation Handbook for Vermont Yankee ML20236G0011998-06-30030 June 1998 Individual Plant Exam External Events BVY-98-098, Monthly Operating Rept for June 1998 for Vermont Yankee Nuclear Power Station1998-06-30030 June 1998 Monthly Operating Rept for June 1998 for Vermont Yankee Nuclear Power Station ML20248C5081998-05-31031 May 1998 Rev 2 to 24A5416, Supplemental Reload Licensing Rept for Vermont Yankee Nuclear Power Station Reload 19 Cycle 20 ML20248C4951998-05-31031 May 1998 Rev 1 to Vermont Yankee Nuclear Power Station Cycle 20 Colr BVY-98-081, Monthly Operating Rept for May 1998 for Vermont Yankee Nuclear Power Station1998-05-31031 May 1998 Monthly Operating Rept for May 1998 for Vermont Yankee Nuclear Power Station ML20247J8341998-05-31031 May 1998 Peak Suppression Pool Temp Analyses for Large Break LOCA Scenarios, for May 1998 ML20247G4001998-05-12012 May 1998 Interview Rept of Ej Massey ML20247E6351998-04-30030 April 1998 Rev 1 to GE-NE-B13-01935-LTR, Jet Pump Riser Welds Allowable Flaw Sizes Ltr Rept for Vermont Yankee 1999-09-30 |
Text
Retrieved from "https://kanterella.com/w/index.php?title=ML20205F663&oldid=3022586"