MONTHYEARIR 05000324/19970991997-06-30030 June 1997 SALP Repts 50-324/97-99 & 50-325/97-99 for 950514-970524 IR 05000324/19930441993-12-0606 December 1993 SALP Repts 50-324/93-44 & 50-325/93-44 for Period of 931101-06.Overall Level of Safety Performance at Facility Significantly Improved IR 05000324/19920301992-12-30030 December 1992 Initial SALP Repts 50-324/92-30 & 50-325/92-30 for Period 911103 - 921031 IR 05000400/19870241987-09-23023 September 1987 SALP Rept 50-400/87-24 for Aug 1986 - June 1987 IR 05000324/19870191987-09-23023 September 1987 SALP Repts 50-324/87-19 & 50-325/87-19 for Nov 1985 - June 1987 ML20062H5051982-08-0606 August 1982 Comments on 820720 Meeting Re Util Comments on Systematic Assessment of Licensee Performance & Status of Missed Surveillance Test Issue.Meeting Beneficial & Provided Better Understanding of Util Position 1997-06-30
[Table view] Category:TEXT-INSPECTION & AUDIT & I&E CIRCULARS
MONTHYEARPNO-II-99-045, on 991018,Hurricane Irene Was Located Approx 105 Miles East of Cape Hatteras,Nc.Ctr of Hurricane Was Estimated Near Latitude 35.6 North & Longitude 73.8 West. Storm Was Moving Northeast at 35 Mph1999-10-18018 October 1999 PNO-II-99-045:on 991018,Hurricane Irene Was Located Approx 105 Miles East of Cape Hatteras,Nc.Ctr of Hurricane Was Estimated Near Latitude 35.6 North & Longitude 73.8 West. Storm Was Moving Northeast at 35 Mph IR 05000324/19990061999-10-0606 October 1999 Insp Repts 50-324/99-06 & 50-325/99-06 on 990801-0911.No Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support PNO-II-99-037D, on 990915,Hurricane Floyd Was Located Approx 380 Miles Southeast of Wilmington,Nc.Ctr of Hurricane Was Estimated Near Latitude 28.8 North & Longitude 78.8 West. Storm Was Moving Northwest at 14 Mph.Max Winds Were 140 Mph1999-09-15015 September 1999 PNO-II-99-037D:on 990915,Hurricane Floyd Was Located Approx 380 Miles Southeast of Wilmington,Nc.Ctr of Hurricane Was Estimated Near Latitude 28.8 North & Longitude 78.8 West. Storm Was Moving Northwest at 14 Mph.Max Winds Were 140 Mph PNO-II-99-037E, on 990915,Hurricane Floyd Was Located Approx 380 Miles Southeast of Wilmington,Nc.Ctr of Hurricane Was Estimated Near Latitude 29.3 North & Longitude 78.8 West. Storm Was Moving north-northwest at 14 Mph1999-09-15015 September 1999 PNO-II-99-037E:on 990915,Hurricane Floyd Was Located Approx 380 Miles Southeast of Wilmington,Nc.Ctr of Hurricane Was Estimated Near Latitude 29.3 North & Longitude 78.8 West. Storm Was Moving north-northwest at 14 Mph PNO-II-99-037F, on 990915,Hurricane Floyd Was Located Approx 350 Miles Southeast of Wilmington,Nc.Ctr of Hurricane Was Estimated Near Latitude 29.9 North & Longitude 79.0 West. Storm Was Moving north-northwest at 14 Mph1999-09-15015 September 1999 PNO-II-99-037F:on 990915,Hurricane Floyd Was Located Approx 350 Miles Southeast of Wilmington,Nc.Ctr of Hurricane Was Estimated Near Latitude 29.9 North & Longitude 79.0 West. Storm Was Moving north-northwest at 14 Mph PNO-II-99-037H, on 990915,Hurricane Floyd Was Located Approx 168 Miles Southeast of Bsep.Ctr of Hurricane Was Estimated Near Latitude 31.3 North & Longitude 79.0 West.Storm Was Moving North at 17 Mph with Max Winds at 115 Mph1999-09-15015 September 1999 PNO-II-99-037H:on 990915,Hurricane Floyd Was Located Approx 168 Miles Southeast of Bsep.Ctr of Hurricane Was Estimated Near Latitude 31.3 North & Longitude 79.0 West.Storm Was Moving North at 17 Mph with Max Winds at 115 Mph PNO-II-99-037G, on 990915,Hurricane Floyd Was Located Approx 216 Miles Southeast of Bsep.Ctr of Hurricane Was Estimated Near Latitude 30.6 North & Longitude 79.1 West.Storm Was Moving north-northwest at 14 Mph with Max Winds at 125 Mph1999-09-15015 September 1999 PNO-II-99-037G:on 990915,Hurricane Floyd Was Located Approx 216 Miles Southeast of Bsep.Ctr of Hurricane Was Estimated Near Latitude 30.6 North & Longitude 79.1 West.Storm Was Moving north-northwest at 14 Mph with Max Winds at 125 Mph PNO-II-99-035, on 990830,util Secured from Notification of Unusual Event After Hurricane Warning Lifted for Area.Plant Had Been Placed in Hot Shutdown Due to Predicted Hurricane Track.Unit 2 Commenced Restart on 9908311999-08-31031 August 1999 PNO-II-99-035:on 990830,util Secured from Notification of Unusual Event After Hurricane Warning Lifted for Area.Plant Had Been Placed in Hot Shutdown Due to Predicted Hurricane Track.Unit 2 Commenced Restart on 990831 PNO-II-99-033, on 990830,Hurricane Dennis Was Located Approx 72 Miles Southeast of Bsep.No Significant Damage Has Been Sustained at Site.Ge Facility Suspended Fuel Fabrication Processes & No Significant Damage Was Sustained1999-08-30030 August 1999 PNO-II-99-033:on 990830,Hurricane Dennis Was Located Approx 72 Miles Southeast of Bsep.No Significant Damage Has Been Sustained at Site.Ge Facility Suspended Fuel Fabrication Processes & No Significant Damage Was Sustained IR 05000324/19990051999-08-27027 August 1999 Insp Repts 50-324/99-05 & 50-325/99-05 on 990620-0731.Two Violations Noted Being Treated as Ncv.Major Areas Inspected: Operations,Maint & Plant Support IR 05000324/19990041999-07-19019 July 1999 Insp Repts 50-324/99-04 & 50-325/99-04 on 990509-0619. Non-cited Violations Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support.Includes Results of Y2K Readiness Program Review IR 05000324/19990031999-06-0707 June 1999 Insp Repts 50-324/99-03 & 50-325/99-03 on 990328-0508.Two Violations Noted & Being Treated as non-cited Violations. Major Areas Inspected:Aspects of Licensee Operations,Maint, Engineering & Plant Support IR 05000324/19990021999-04-26026 April 1999 Forwards Insp Repts 50-324/99-02 & 50-325/99-02 on 990214-0327.No Violations Noted.Major Areas Inspected: Licensee Operation,Engineering,Maint & Plant Support IR 05000324/19980141999-03-18018 March 1999 Insp Repts 50-324/98-14 & 50-325/98-14 on 990111-15,25 & 29. No Violations Noted.Major Areas Inspected:Licensee Calculations,Analysis,Performance Test Procedures & Other Engineering Activities IR 05000324/19990011999-03-15015 March 1999 Insp Repts 50-324/99-01 & 50-325/99-01 on 990103-0213.No Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support IR 05000324/19980111999-01-28028 January 1999 Insp Repts 50-324/98-11 & 50-325/98-11 on 981122-990102.No Violations Noted.Major Areas Inspected:Licensee Operations, Maint & Plant Support ML20198P0261998-12-21021 December 1998 Notice of Violation from Insp on 981011-1121.Violation Noted:On 981030,licensee Failed to Correctly Shutdown & Verify That Unit 1 Standby Gas Treatment Sys in Standby Alignment Per Section 7.1 of Procedure 1OP-10 IR 05000324/19980101998-12-21021 December 1998 Insp Repts 50-324/98-10 & 50-325/98-10 on 981011-1121. Violations Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support.Also Includes Results of Engineering & Health Physics Insp PNO-II-98-050, on 981123,licensee Declared Notification of Unusual Event,Due to Release of Chlorine Gas from Svc Water Injection Sys in Chlorination Bldg.Personnel Were Moved to Alternate Locations Away from Gas Leak,As Precautionary1998-11-24024 November 1998 PNO-II-98-050:on 981123,licensee Declared Notification of Unusual Event,Due to Release of Chlorine Gas from Svc Water Injection Sys in Chlorination Bldg.Personnel Were Moved to Alternate Locations Away from Gas Leak,As Precautionary IR 05000324/19980131998-11-24024 November 1998 Partially Withheld Insp Repts 50-324/98-13 & 50-325/98-13 on 981026-30 (Ref 10CFR73.21).No Violations Noted.Major Areas Inspected:Aspects of Licensee Plant Support IR 05000324/19980091998-11-0909 November 1998 Insp Repts 50-324/98-09 & 50-325/98-09 on 980830-1010. Violations Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support ML20195G4191998-11-0909 November 1998 Notice of Violation from Insp on 980830-1010.Violation Noted:On 980916,licensee Failed to Perform Section 7.1.5 of Procedure OMST-RHR-28Q as Required When Returning Flow Transmitter E11-FT-3338 to Service IR 05000324/19980081998-09-28028 September 1998 Insp Repts 50-324/98-08 & 50-325/98-08 on 980719-0829.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support PNO-II-98-039D, on 980827,update on Hurricane Bonnie Made. Walkdowns Confirmed,No Significant Damage to Security Barriers.Licensee Preparations for Plant Restart Continuing, Including Restoration of Warning Sirens1998-08-27027 August 1998 PNO-II-98-039D:on 980827,update on Hurricane Bonnie Made. Walkdowns Confirmed,No Significant Damage to Security Barriers.Licensee Preparations for Plant Restart Continuing, Including Restoration of Warning Sirens PNO-II-98-039C, on 980827,update on Hurricane Bonnie Made. No Significant Damage Has Occurred at Brunswick Plant or GE Fuel Fabrication Facility.Licensee Continues to Staff Technical Support Ctr & Emergency Operations Facility1998-08-27027 August 1998 PNO-II-98-039C:on 980827,update on Hurricane Bonnie Made. No Significant Damage Has Occurred at Brunswick Plant or GE Fuel Fabrication Facility.Licensee Continues to Staff Technical Support Ctr & Emergency Operations Facility PNO-II-98-039B, on 980826,update on Hurricane Bonnie Made. Hurricane Force Winds Have Been Experienced at Site,But No Significant Damage Has Occurred.Licensee Continues to Staff Emergency Facilities.No Other Damage Has Been Reported1998-08-26026 August 1998 PNO-II-98-039B:on 980826,update on Hurricane Bonnie Made. Hurricane Force Winds Have Been Experienced at Site,But No Significant Damage Has Occurred.Licensee Continues to Staff Emergency Facilities.No Other Damage Has Been Reported PNO-II-98-039A, on 980826,update on Hurricane Bonnie Made. Brunswick Resident Inspectors & One Regional Inspector Remain on Site to Monitor Licensee Activities.Region II State Liaison Officer Arrived in Raleigh Area1998-08-26026 August 1998 PNO-II-98-039A:on 980826,update on Hurricane Bonnie Made. Brunswick Resident Inspectors & One Regional Inspector Remain on Site to Monitor Licensee Activities.Region II State Liaison Officer Arrived in Raleigh Area PNO-II-98-039, on 980525,preparations for Hurricane Bonnie Made.Licensee Monitoring Progress of Hurricane in Order to Have Both Units in Cold Shutdown Three H Prior to Arrival of Hurricane Force Winds on Site1998-08-25025 August 1998 PNO-II-98-039:on 980525,preparations for Hurricane Bonnie Made.Licensee Monitoring Progress of Hurricane in Order to Have Both Units in Cold Shutdown Three H Prior to Arrival of Hurricane Force Winds on Site IR 05000324/19980071998-08-11011 August 1998 Insp Repts 50-324/98-07 & 50-325/98-07 on 980607-0718. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20237B9211998-08-11011 August 1998 Notice of Violation from Insp on 980607-0718.Violation Noted:Licensee Failed to Accomplish Activities Affecting Quality in Accordance W/Documented Instructions in Procedures for Listed Examples IR 05000324/19980061998-07-0606 July 1998 Insp Repts 50-324/98-06 & 50-325/98-06 on 980426-0606. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20236N9451998-07-0606 July 1998 Notice of Violations from Insp on 980426-0606.Violations Noted:On 980521,licensee Made Temporary Procedure Change That Altered Intent of Maint Surveillance Test 1MST-DG11R, DG-1 Loading Test,By Substituting 25 for 50 Horsepower Load IR 05000324/19983001998-06-15015 June 1998 NRC Operator Licensing Exam Repts 50-324/98-300 & 50-325/98-300 on 980508-15.Six SRO & Four RO Candidates Tested.All Passed Exam.One Candidate Identified as Having Some Performance Weaknesses ML20249A2191998-06-0101 June 1998 Notice of Violation from Insp on 980315-0425.Violation Noted:On 980331 Licensee Failed to Accomplish Scaffolding Erection Activities in Accordance W/Documented Procedure OMMM-022 IR 05000324/19980051998-06-0101 June 1998 Insp Repts 50-324/98-05 & 50-325/98-05 on 980315-0425. Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support ML20216H4431998-04-16016 April 1998 Insp Repts 50-324/98-04 & 50-325/98-04 on 980209-13,0309-12 & 16-20.Violations Noted.Major Areas inspected:follow-up on Licensee Corrective Actions for Electrical Equipment Environ Qualification & Review of Instrument Response Time Testing ML20216H4341998-04-16016 April 1998 Notice of Violation from Insp on 980209-13,0309-12 & 16-20. Violation Noted:On 970603,licensee Failed to Accomplish Activities Affecting Quality in Accordance W/Procedure EGR-NGGC-0005 IR 05000324/19980031998-04-13013 April 1998 Insp Repts 50-324/98-03 & 50-325/98-03 on 980201-0314.No Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support.Also Includes Results of Health Physics Insp by Regional Inspectors ML20217C8011998-03-16016 March 1998 Notice of Violation from Insp on 980126-30.Violation Noted: Rev 46 to Licensee Emergency Plan Decreased Effectiveness of Plan That Adopted Regulatory Provision for Biennial Exercise ML20217C8061998-03-16016 March 1998 Insp Repts 50-324/98-01 & 50-325/98-01 on 980126-30. Violations Noted.Major Areas Inspected:Emergency Preparedness Exercise ML20216B1741998-03-0202 March 1998 Insp Repts 50-324/97-15 & 50-325/97-15 on 971228-980131. Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support ML20216B1621998-03-0202 March 1998 Notice of Violation from Insp on 971228-980131.Violation Noted:On 971203 & 971230,for Unit 1 & 971203,971210 & 971220 & 980104 for Unit 2,Condition Repts Were Not Initiated to Address Repetitive Failures of Plant Computer ML20202D3161998-02-0505 February 1998 Omitted Page 42 to Insp Repts 50-324/97-13 & 50-325/97-13 Transmitted on 980123 IR 07100109/20120271998-01-23023 January 1998 Notice of Violation from Insp on 971109-1227.Violation Noted:On 971209,inspector Determined That Licensee Had Not Maintained Data Sheets or Logs for Equipment Alignment ML20199G7501998-01-23023 January 1998 Insp Repts 50-324/97-13 & 50-325/97-13 on 971109-1227. Violations Noted.Major Areas Inspected:Operations, Engineering,Maint & Plant Support.Includes Results of Maint, Engineering & FP Insps ML20198N6461997-12-30030 December 1997 Notice of Violation from Insp on 971209-12.Violation Noted: on 971118,locked High Radiation Area Was Left Unattended & Entrance Was Not Secured W/Designated Special cal-core Locks Prior to Leaving Area Unguarded ML20198N6561997-12-30030 December 1997 Insp Repts 50-324/97-14 & 50-325/97-14 on 971209-12. Violations Noted.Major Areas Inspected:Radiation Protection & Chemistry Controls,Miscellaneous Radiation Protection & Chemistry Issues & Mgt Meetings IR 05000324/19970141997-12-30030 December 1997 Insp Repts 50-324/97-14 & 50-325/97-14 on 971209-12. Violations Noted.Major Areas Inspected:Radiation Protection & Chemistry Controls,Miscellaneous Radiation Protection & Chemistry Issues & Mgt Meetings ML20198P0561997-12-23023 December 1997 NOV from Insp Completed on 971113.Violation Noted:Licensee Failed to Promptly Correct Condition Adverse to Quality Re Unit 1 High Drywell Temp Condition ML20197H1691997-12-0808 December 1997 Notice of Violation from Insp on 970928-1108.Violation Noted:On 970923,torus Master clearance,2-97-555 Was Not Adequate to Prevent Draining of Water Into Unit 2 Torus 1999-09-15
[Table view] |
Text
.. . - . -. ..
.
'
4 SYSTEMATIC ASSESSMENT M LICENSEE PERFORMANCE REPORT l BRUNSWICK STEAM EL'ICTRIC PLANT UNITS 1 AND 2 50-325/97-99 AND 50-324/97-99 l BACKGROUND l u The SALP. board convened on June 11, 1997, to assess the nuclear safety performance of the Brunswick Electric Plant, Units 1 and 2 for the period May 14, 1995, through May 24, ~997. The board was conducted in accordance with Management Directive 8.6 " Systematic Assessment of Licensee Performance." Board Members were Johns P. Jaudon, Director, Division of Reactor Safety (Board Chairperson), Bruce S. Hallett, Acting )
Deputy Regional Administrator, Richard V. Crlenjak, Acting Deputy l Director, Division of Reactor Projects, and F. Mark Reinhart, Acting l Director, Project Directorate II 1, Office of Nuclear Reactor !
, Regulation. This assessment was reviewed and approved by the Regional Administrator.
'
I PLANT OPERATIONS This functional area assesses the control and execution of activities directly related to operating the plant. It includes activities such as {
plant startup, power operation, and response to transients. It also includes initial and requalification training programs for licensed operator The previous SALP noted superior overall performance and a challenge with configuration control problems. Superior performance was ,
characterized by safe and reliable operations, a well trained staff with oversight from a strong management team, and clear expectations set and !
effectively communicated.
- During this SALP period, performance in the area of Operations was superior with the overall quality of plant operations maintaining the i level of performance established in the previous assessment perio :
Strong management oversight and safety focus led to only a few reactor I trips during the first half of th;s SALP period. No plant trips occurred as a result of operator error, and there were no trips during l the last half of this assessment period. The operators' response to these trips and to transients and off normal events was excellent, which further demonstrated operations' superior performance in this are l Although configuration control problems, which could adversely affect l
plant operations, have been significantly reduced during this period,
! some configuration problems remain. Continued, isolated problems with
! equipment tagouts and procedural errors resulting from a lack of operator attention to detail require additional management attention.
l Management's use of self assessments and implementation of corrective
actions were used to ensure a good safety focus and were noted as strengths. The Plant Nuclear Safety Committee has maintained an appropriate safety focus in conducting their reviews.
! 9707230378 970630 PDR l- ADOCK 05000324 G PM l
.
.
Operator training and requalification presented a challenge, and weak performance in these related areas demonstrated a need for active management involvement. Several operators failed their requalification examinations. Although successfully remediated, the operators' poor performance indicated a weakness in the effectiveness of the re ualification trainin Problems were also noted in the licensee's im lementation of the Initial Licensed Operator Training progra The Plant Operations area is rated Category III. MAIN 1ENANCE This functional area assesses activities associated with diagnosti predictive, preventive, and corrective maintenance of plant structures, systems and components; maintenance of physical condition of the plant; and training of the maintenance staff. It also assesses surveillance
,
'
testing. inservice inspection and testing, instrument calibration, operability testing, post maintenance testing, post outage testing, containment leak rate testing, and special testin A high level of maintenance effectiveness and quality was normally demonstrated over the period by the high availability of risk-significant components and record setting plant availability. NRC observations of maintenance activities identified some strengths in the control and conduct of maintenance activities. Refueling outage times decreased, and units restarted following outage with only minimal ;
problem l Backlogs for preventive maintenance, operator work arounds related to maintenance, and corrective maintenance were low, indicating well focused and effective use of resources. The licensee has successfully used the "Fix It-Now" team to achieve expedited resolution of a large percentage of maintenance problem Risk insights have usually been incorporated into the planning and i scheduling of maintenance activities. Emphasis has been placed in the outage planning area on capturing and implementing the lessons learned from previous outages, which contributed to the licensee's success over ,
the assessment period in progressively reducing the length of refueling outage The Inservice Inspection (ISI) program implemented at the facility was wel' organized and supported, and it employed the latest technology 7 .ilable. The licensee has stayed abreast of changes in ISI requirements. Areas where strong performance was evident included both reactor vessel and core shroud inspection An excellent training facility utilizing high quality training aids has been arovided for maintenance. Of particular note were system mockups and t1e ability to video tape training activities for enhanced feedback to students.
-
.
.
Performance in the area of self-identification and correction of deficiencies was a challenge. Full advantage was not always taken of opportunities to identify component >erformance and material condition problems.,and the effectiveness of t1e preventive maintenance program in identifying such problems was occasionally limited. . At times, corrective action for known deficiencies was slow. When manage. ment attention was given to 3roblems, corrective action was normally timely with good follow throug Progress has been made in implementing improved maintenance procedures. -
However, a challenge remain to sustain improvements with compliance and procedural controls in maintenanc . . ._The Maintenance area is rated Category i I ENGIEERING The functional area assesses activities associated with the design of plant modifications and engineering support for operations, maintenance, surveillance, and licensing activitie Engineering performance had numerous problems with a variety of modifications during this assessment period. Although some of the problems identified had occurred prior to this assessment period, the resulting errors affected risk significant systems. One of these problems required all nuclear service water pumps to be declared
- ino)erable, and this resulted in a dual unit shutdown. Many other .
pro)lems, some self revealing and others NRC identified, of varying !
safety significance, were noted in the modifications area. The number i i of modification issues and the fact that no sustained improving trend !
'
j was found, indicated that this is a problem requiring management t attention. There were reorganizations and management changes in
! engineering. This instability delayed the rapid recognition and
- correction of some emerging issues.
1 Engineering performance on the power up rate project was mixed. The .
- original licensee submittal contained several errors, which were !
i
'
subsequently identified by the licensee prior to actual implementation !
of the power up rate. While the licensee was very responsive in correcting the errors, the late self identification of the problems
. resulted in a significant delay in actual implementation of the power up rate. Correction of the errors required an in depth review of work performed by the licensee and its principal contractor in supporting the 7 power up rate. The root causes of the problems were the licensee's
'.
failure to define adequately the calculation inputs and acceptance criteria and the failure to detect errors in material developed by the
,^
contractor. The licensee's performance with res)ect to evaluations under 10 CFR 50.59 was adequate. Only minor )ro)lems with evaluations were found. Other licensee correspondence su)mitted to the staff was
- usually characterized as good.
N
- ~ , - ,,
, - - - - - - - . - . . - - - . - _ - - - - _ . - . _ - . -
l
.,
.
The licensee's self assessments were generally effective in identifying problems;. however, implementation of the licensee's corrective action program within engineering has not always been fully effectiv Trending of technical areas did not serve to highlight and then cause )
[ . correction of the areas in which increased management attention was I i warranted. The problems with the Environmental Qualification program )
l did not receive effective management support until after regulatory I
- intervention. In this instance, the corrective action eventually
!
undertaken was comprehensive. Other examples of inadequate corrective action continued to be identified throughout the assessment period.
) \
l Engineering support to operations was strong this assessment perio !
The Rapid Response Team provided effective proactive support I
. The ability to implement effective corrective actions is a challeng l l
The Engineering area is rated Category 2.
! PLANT SUPPORT This functional area assesses activities related to the plant support function, including radiological controls, radioactive effluents and waste, chemistry, emergency preparedness, security, fire protection and housekeeping programs.
!- Radioactive waste program controls were superior and contributed significantly to minimal releases of radioactive materials to the
,
environment. Actions by management and staff caused the elimination of i several problems with systems that had previously caused surface contamination challenges for radiological controls.
l Attention to maintenance of emergency preparedness equipment and i facilities resulted in a superior level of performance of these during ,
exercises and actual events. The licensee was proactive in providing !
training to individuals to assure technically sound response capabilities. Actual response to emergency events was prompt and thorough with some 3roblems in communication and delay in classification ,
during an exercise 1 eld early in the period. Problem identification and '
correction in the emergency preparedness area was thoroug As in the previous assessment period, the control of external radiation sources had some deficiencies. This resulted in high values for collective radiation dose at the site. Radiation dose control programs were successful in reducing the cumulative dose achieved from one outage to the next. Radiation doses to individuals were controlled to levels well below limits in NRC regulations.
! Control of radioactive contamination in the plant was effective in :
l providing access to most areas during operations and limiting the spread
- to uncontaminated areas. The problems in the control of personnel i contamination events noted in the previous assessment, continued during !
! this period. The licensee was not effective in limiting these even in i i areas designated as " clean" throughout the assessment period. Proactive :
I
_ _ _ _ _ _ . _ _ _ _ . _ _ _ . _ _ _ . _ _ . . . __ , - _ . - . _ _ . _ . . , . - . . _ . .._,...,...m.._ ,
__ _ . _ _ . _ _ _ _ _ - ._- __ -
'
,.
l
steps taken during the last six months of the period were effective in significantly reducing these type events during operation Programs cnd )rocedures for carrying out radiation practices were excellent. Tiere were several instances identified by the licensee and the NRC, wherein poor practices or failure to follow procedures, were noted as the result of inattention. Self assessments in the i radiological controls area had a low threshold for identifying problems:
and the assessments and corrective actions were thorough.
,
Fire protection performance was assessed as very good. The fire protection program exhibited some deficiencies in implementation, but brigade responses to events and during drills were timely and thoroug .
i Security operations continued to be implemented in an excellent manner with management and staff focus on a high level of wrformance.
, Response to events and challenges was excellent. Tiere were thorough
'
audits and timely attention to corrective actions. The licensee
! identified significant deficiencies in the fitness for duty and access authorization programs, which were corrected during the latter part of
,
the assessment period.
l Housekee)ing had some problems noted during certain work conducted l during t1e assessment period. Management and staff attention
- significantly improved performance in these areas once problems were noted. The licensee continued to be aggressive in pursuit of cleaning .
up targeted area I The Plant Support area is rated Category !
i l i
,
!
l i l i
i i