Notice of Violation from Insp on 880216-0331.Violation Noted:Licensee Failed to Implement Rev 16 to Plant Procedure Pp 1102.10 by Not Venting Steam Generators During Fill to Prevent Pressurization W/Main Steam Isolation Valves Closed
ML20151X906
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 04/27/1988
From: Knop R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To:
Shared Package
ML20151X901 List:
References
50-346-88-07, 50-346-88-7, NUDOCS 8805040285
Download: ML20151X906 (1)


Text

-. -_ _ -

e NOTICE OF VIOLATION Toledo Edison Company Docket No. 50-346 As a result of the inspection conducted on February 16, through March 31, 1988, and in accordance with the "General Policy and Procedures for NRC Enforcement Actions," 10 CFR Part 2, Appendix C (1985), the following violation was identified:

Technical Specification 6.8.1.a. requires that written procedures shall be l established, implemented and maintained for activities listed in Appendix "A" of Regulatory Guide 1.33, November 1972. Appendix "A" Section 3.c. of Regulatory Guide 1.33 lists filling and venting the main steam system as an activity.

Contrary to the above on March 11, 1988, the licensee failed to implement Plant Procedure PP 1102.10, Revision 16, dated July 21, 1986, "Plant Shutdown and Cooldown", in that it did not vent the steam generators during fill to prevent pressurization with the main steam isolation valves closed.

This is a Severity Level IV violation (Supplement I).

Pursuant to the provisions of 10 CFR 2.201, you are required to submit to this office within thirty days of the date of this Notice a written statement or explanation in reply, including for each violation: (1) corrective action taken and the results achieved; (2) corrective action to be taken to avoid further violations; and (3) the date when full compliance will be achieved. '

Consideration may be given to extending your response time for good cause -

shown.

Dated

!APR 2 71989

((

R. C. Knop, Chief V Reactor Projects Branch 3 r

i i

8805040285 DR 880427 ^

ADOCK 05000346 DCD