Notice of Violation from Insp on 871116-1231.Violations Noted:Licensee Replaced 75 Ft Fire Hose Section w/50 Ft Hose Section on Fire Hose Station HCS-30
ML20196A594
Person / Time
Site: Davis Besse, 07100116 Cleveland Electric icon.png
Issue date: 01/29/1988
From: Guldemond W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To:
Shared Package
ML20196A589 List:
References
NUDOCS 8802050103
Download: ML20196A594 (1)


Text

- __

.

~

NOTICE OF VIOLATION Toledo Edison Company Docket No. 50-346 As a result of the inspection conducted on November 16, 1987, through December 31, 1987, and in accordance with the "General Policy and Procedures for NRC Enforcement Actions," 10 CFR Part 2, Appendix C (1987), the following violation was identified:

Technical Specification 3.7.9.3.a requires that with one or more fire hose stations in Table 3.7-4 inoperable, an additional equivalent fire hose shall be routed to the unprotected area from an operable hose station within one hour. Fire hose station HCS-30 is listed in Table 3.7- Contrary to the above, on October 26, 1987, the licensee replaced a 75 foot hose section with a 50 ft. hose section on fire hose station HCS-30. The shorter hose rendered fire hose station HCS-30 inoperable because it was unable to reach all of the equipment important to safety in Room 515. The shift supervisor was notified of this condition at 9:57 a.m. on October 26, 1987. The shift supervisor directed that an additional length of hose be added to fire hose station HCS-30, which made it operable. Fire hose station HCS-30 was inoperable for approximately four day Inis is a Severity Level IV violation (Supplement I).

Pursuant to the provisions of 10 CFR 2.201, you are required to submit to this office within thirty days of the date of this Notice a written statement or  ;

l explanation in reply, including for each violation: (1) corrective action '

taken and the results achieved; (2) corrective action to be taken to avoid further violations; and (3) the date when full compliance will be achieve Consideration may be given to extending your response time for good cause show JAN 2 91939 /-

Dated V.' G. Guld%mond, Chief Reactor Projects Branch 2

.

{

!