Notice of Violation from Insp on 890123-0206.Violation Noted:Semiannual Radioactive Effluent Release Rept for Jan-June 1988 Did Not Identify & Quantify Abnormal Gaseous Release Event on 880120
ML20245J077
Person / Time
Site: Davis Besse 
Issue date: 02/24/1989
From: Greger L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To:
Shared Package
ML20245J072 List:
References
50-346-89-04, 50-346-89-4, NUDOCS 8903060160
Download: ML20245J077 (1)


Text

-

p f.,

r

~

l I

NOTICE OF VIOLATION.

x

-l L

Toledo Edison Company Docket No. 50-346 l

As'a result of the inspection conducted during the period January 23 through February.6, 1989,-and in accordance with 10 CFR Part 2,. Appendix C - General Statement of Policy and Procedure for NRC Enforcement Actions (1988), the following violation was identified:

j 1

Technical Specification 6.9.1.11 requires that the Semiannual Radioactive-1 Effluent Release Report include a summary of radioactive liquid and gaseous effluents and solid waste released from the unit'as specified in Regulatory 1

Guide 1.21,' Revision 1, June 1974.

Appendix B,'Section A.6 of the aforementioned regulatory guide specifies the. identification of abnormal liquid and gaseous radioactive releases to the environment, including quantification of the total curies of radioactive material released.

Contrary to the above, the Semiannual ~ Radioactive Effluent Release Report for

.the period from January 1 through' June 30, 1938, did not identify and quantify an abnormal gaseous release which occurred on January 20, 1988.

{

l This is a Severity Level"IV violation (Supplement IV).

Pursuant to the provisions of 10 CFR 2.201, you are required to submit

'l to this office within thirty days of the date of this Notice a written statement or explanation in reply, including for each violation: -(1) the 1

corrective actions that'have been taken and the results achieved; (2) the.

corrective actions that wil1~be taken to avoid further violations; and (3) the date when full compliance will be achieved.

Consideration may l

be given to extending your response time for good cause shown.

l

%9 -W-89 Y

2q w Dated L. Robe W Grege'r, Chief I

Reactor Programs Branch 1

i 8903060160 890224 j

PDR ADOCK 05000346 G

PNU j

)