Notice of Violation from Insp on 881201-890115.Violation Noted:Procedure DB-PN-00007 Not Implemented When Maint Planner Failed to Review Necessary Drawings for safety- Related Groups 3 & 4 CRD Programmer Drawer
ML20245E064
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 02/24/1989
From: Greenman E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To:
Shared Package
ML20245E055 List:
References
50-346-88-37, NUDOCS 8905020006
Download: ML20245E064 (1)


Text

'.

(~

(

~

w.

r

~

NOTICE OF VIOLATION

- i Docket No. 50-346 Toledo Edison Company As a' result of the inspection conducted on December 1,.1988 through January 15, 1989, and in accordance.with the " General Policy'and Procedures for NRC l

Enforcement Actions," 10 CFR Part 2, Appendix C (1988), the following violation was identified:

Technical Specification 6.8.1.a requires that written procedure; be established, implemented and maintained covering the applicable procedures

.i recommended in Appendix A of Regulatory. Guide 1.33 (November 1972).

One section of the regulatory guide requires that maintenance that can affect i

the. performance of safety-related equipment should be properly planned and performed in accordance with. procedures or drawings appropriate to the circumstances. Licensee administrative procedure DB-PN-00007, " Control of Work," Section 6.4.1 requires the planner to review the P& ids, drawings and vendor manuals to identify corrective actions and necessary documentation l

for the maintenance task.

Contrary to the above, on December 18, 1988, procedure DB-PN-00007, Section 6.4.1, was not implemented when the maintenance planner failed to review the necessary drawings for the safety-related Group 3 and 4 control rod drive programmer drawer and therefore was not able to identify the proper corrective actions for the maintenance work, i

This is a Severity Level IV Violation (Supplement I).

j Pursuant to the provisions of 10 CFR 2.201, you are required to submit to this office within thirty days of the date of this Notice a written statement or explanation in reply, including for each violation:

(1) corrective action taken and the results achieved; (2) corrective-action to be taken to avoid further violations; and (3) the date when full compliance will be achieved. Consideration may be given to extending your I

response time for good cause shown.

B 2 4 mag

(

Dated e L"dsard G. GrednMan, DirecQ$

J Division of Reactor Projects s

8905020006 890421 gDR ADOCK0500g6