Notice of Violation from Insp on 880912-16 & 1011.Violation Noted:Determined That on Four Occasions,Persons Performing Continuous Fire Watch Duties Found Sleeping or Dozing & Continous Fire Watches Not Established within 1 H
ML20204J299
Person / Time
Site: Davis Besse 
Issue date: 10/19/1988
From: Miller H
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To:
Shared Package
ML20204J297 List:
References
50-346-88-28, NUDOCS 8810250084
Download: ML20204J299 (1)


Text

_

. ~ - _ _ _ _ -.. - _

i NOTICE OF VIOLATION i

Toledo Edison Company Docket No. 50-346 l

Toledo, Ohio License No. NPF-3 l

i As a result of the inspection conducted on September 12-16 and October 11, 1988, and in accordance with the "General Policy and Procedures for NRC i

Enforcement Actions}" 10 CFR Part 2, Appendix C (1988), the following violation was ident fied:

l l

Technical Specification Section 3.7.10.a Action Statement requires that with oneormoreoftherequIredfirebarrierpenetrationsnon-functional,within.

one hour either establish a continuous fire watch on at least one side of the affected penetration, or verify the operability of fire detectors on at least one side of the non-functional fire barrier and establish an hourly fire watch patrol.

i Contrary to the above requirements, it was determined that on four occasions e

persons performing continuous fire watch duties were found inattentive i

(sleeping or dozing). On three occasions fire watch personnel had either left their areas of responsibility prior to being relieved or were relieved j

incorrectly; or hourly fire watch patrols had missed patrolling their required areas.

Further, on four additional occisions, due to personnel error, 1

continuous fire watches had nct been established within one hour as required.

This is a Severity Level IV violation (Supplement I).

l t

.With respect to this item, the inspection showed that actions had been taken

[

to correct the identified violation and to prevent recurrence.

Consequently,

[

i no reply to this violation is required and we have no further questions regarding this matter.

I l

i l

/*/n/v Dated HubertvJ. Miller, Director l

Division of Reactor Safety l

t i

f i

i 8910250094 881019 l

J gon Aoocn 0 9 3 '