ML20258A099

From kanterella
Revision as of 23:35, 24 September 2020 by StriderTol (talk | contribs) (StriderTol Bot change)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Initial Operator Licensing Written Examination Approval
ML20258A099
Person / Time
Site: Millstone Dominion icon.png
Issue date: 09/14/2020
From: Diane Jackson
Operations Branch I
To: Stoddard D
Dominion Energy
Jackson D
References
Download: ML20258A099 (3)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 2100 RENAISSANCE BLVD., Suite 100 KING OF PRUSSIA, PA 19406-2713 September 14, 2020 Mr. Daniel G. Stoddard Senior Vice President and Chief Nuclear Officer Innsbrook Technical Center 5000 Dominion Blvd.

Glen Allen, VA 23060-6711

SUBJECT:

MILLSTONE POWER STATION, UNIT 2 - INITIAL OPERATOR LICENSING WRITTEN EXAMINATION APPROVAL

Dear Mr. Stoddard:

The purpose of this letter is to confirm the final arrangements for the upcoming operator licensing written examination at Millstone Power Station, Unit 2. Please note that operating test approval will be communicated under separate correspondence.

The U.S. Nuclear Regulatory Commission (NRC) has completed its review of the operator license applications submitted in connection with this examination and separately provided a list of approved applicants to Ms. Crystal Walsh, Site Training Director. Note that any examination waivers and application denials have been addressed in separate correspondence.

The NRC has approved the subject written examinations in accordance with NUREG-1021, Operator Licensing Examination Standards for Power Reactors, Revision 11. Your staff will administer the written examinations on the week of September 28, 2020. This examination has undergone extensive review by my staff and representatives responsible for licensed operator training at your facility. Based on this review, I have concluded that the examination meets the guidelines of NUREG-1021 for content, operational, and discrimination validity.

By administering this examination, you also agree that it meets NUREG-1021 guidelines and is appropriate for measuring the qualifications of licensed operator applicants at your facility. If you determine that this written examination is not appropriate for licensing operators at your facility, do not administer the examination and contact me at (610) 337-5306.

D. Stoddard 2 Please contact your Chief Examiner, Mr. David Silk at (610) 337-5372, if you have any questions or identify any errors or changes in the license level Reactor Operator (RO) or Senior Reactor Operator (SRO) or type of examination (partial or complete written examination) specified for each applicant.

Sincerely, X /RA/

Signed by: Donald E. Jackson Donald E. Jackson, Chief Operations Branch Division of Reactor Safety Docket No. 50-336 License No. DPR-65 cc: Distribution via ListServ

D. Stoddard 3

SUBJECT:

MILLSTONE POWER STATION, UNIT 2 - INITIAL OPERATOR LICENSING WRITTEN EXAMINATION APPROVAL DATED SEPTEMBER 14, 2020 DISTRIBUTION:

DLew, RA (R1ORAMAIL Resource)

RLorson, DRA (R1ORAMAIL Resource)

DCollins, DRP (R1DRPMAIL Resource)

JYerokun, DRS (R1DRSMAIL Resource)

PKrohn, DRS (R1DRSMAIL Resource)

DSchroeder, DRP MDraxton, DRP LGrimes, DRP JFuller, DRP, SRI CHighley, DRP, RI EAllen, DRP, RI ARancourt, DRP, AA EBurket, RI OEDO RidsNrrPMMillstone Resource RidsNrrDorlLpl1 Resource DOCUMENT NAME: G:\DRS\Operations Branch\SILK\Exam FY20-Millstone 2 Sept 21\Millstone22020ExamApproval-W-Ltr-FINAL.docx ADAMS PKG: ML19105A205 ADAMS ACCESSION NO.: ML20258A099 SUNSI Review Non-Sensitive Publicly Available OFFICE RI/DRS RI/DRS NAME DSilk/ DEJ for DJackson/ DEJ DATE 9/14/20 9/14/20 OFFICIAL RECORD COPY