MONTHYEARML20062J4701993-09-17017 September 1993 Forwards Response to NRC Questions on Testing Program for Alternate Ac Machine for Placement in PDR & Central Files ML20055C3521990-02-26026 February 1990 Notification of 900305 Meeting W/Util in Rockville,Md to Discuss Status of Licensing Activities for Facility ML20248E9391989-09-29029 September 1989 Forwards AEOD Technical Review Rept on Debris in Containment Recirculation Pumps.No Occurrences Found to Involve Actual Accumulation of Debris in Containment Sumps.Immediate Corrective Actions Completed ML20248C8311989-09-20020 September 1989 Request for Hearing by Alchemie.* Forwards Response & Request for Hearing,In Response to NRC 890818 Order Modifying License & Order to Show Cause Why Licenses Should Not Be Revoked,For Appropriate Action ML20247H9261989-09-0909 September 1989 Advises That SALP Meeting for Facilities Scheduled for 891115.Assessment Input Should Be Submitted by 891016 ML20245E8501989-08-0707 August 1989 Advises of Reassignments in Project Mgt Duties Due to Recent Reorganization of Standardization & Life Extension Project Directorate ML20245H6451989-08-0404 August 1989 Requests Closure of Outstanding Action Item 87-0198,per 870617 Request Re Review & Evaluation of Acceptability of Fairbanks-Morse Diesel Generator Bearings.Action Completed W/Submittal of Transfer of Lead Responsibility to NRR ML20248D1431989-07-27027 July 1989 Forwards Proposed Generic Ltr Requesting Voluntary Licensee Participation in ERDS & Requests That Proposed Generic Ltr Be Sent to All Licensees of Power Reactors,Except for Participants & Licensees of Listed Plants ML20247B7541989-07-19019 July 1989 Confirms That Licensee 880711,890221 & 0630 Responses to NRC Bulletin 88-004, Potential Safety-Related Pump Loss, Acceptable.Licensing Action for TACs 69886,69887,69893 & 69894 Considered Complete ML20247E6721989-07-17017 July 1989 Proposes Closeout of Plant Correspondence Control Ticket Re Environ Conservation Organization Request for Notification Whenever License Amend Requests Result in Impairment of Plant Operability.Intervenor Will Be Placed on Svc List ML20246K5991989-07-12012 July 1989 Notification of 890725 Meeting W/Util in Birmingham,Al to Discuss Status of Current Licensing Activities & Corporate Initiatives for Plants.Meeting Agenda Encl ML20246L6801989-07-10010 July 1989 Notification of Significant Licensee Meeting 89-101 W/Util on 890718 in King of Prussia,Pa to Discuss Util Engineering Reorganization ML20247A9561989-07-0606 July 1989 Notification of 890717 Meeting W/Lead Plant Utils in Rockville,Md to Discuss Implementation of Revised STS ML20246H3771989-05-12012 May 1989 ALAB-913.* Advises That Time Provided within Which Commission May Act to Review Aslab Decision ALAB-913 Expired.Commission Declined Review.Decision Became Final on 890501.W/Certificate of Svc.Served on 890512 ML20246P9601989-05-10010 May 1989 Discusses 890413 Meeting W/Rosemount & Industry Re Malfunctions of Rosemount Transmitters.List of Attendess, Agenda,Nrc Info Notice 89-042 & Viewgraphs Encl ML20245E9781989-04-17017 April 1989 Forwards Regulatory History AC83-2 Re Licensee Action During Natl Security emergency,10CFR50 (54FR7178) ML20245B7501989-04-15015 April 1989 Forwards Engineering Evaluation Rept on BWR Overfill Events Resulting in Flooding of Steam Lines.Potential for Equipment Damage Believed to Exist & Any Damage Occurring Should Be Fixed Prior to Restart ML20245B6531989-04-15015 April 1989 Forwards Evaluation Rept on BWR Overfill Events Resulting in Flooding of Steam Lines.Events Determined to Involve Deficiencies in Control Sys ML20245B6421989-04-15015 April 1989 Forwards Engineering Evaluation Rept on BWR Overfill Events Resulting in Steam Line Flooding.Though Little Actual Damage Experienced,Potential for Equipment Damage Believed to Exist & Any Damage Occurring Should Be Fixed Prior to Restart ML20245B6191989-04-15015 April 1989 Forwards Evaluation Rept Re BWR Overfill Events Resulting in Steam Line Flooding.All Events Included Reactor Depressurization Followed by Uncontrolled Condensate or Condensate Booster Pumps Injection or Both ML20244E2681989-04-12012 April 1989 Summary of Operating Reactors Events Meeting 89-015 on 890412.Discussion of Events,List of Attendees & Three Significant Items Identified for Input Into NRC Performance Indicator Program & Summary of Reactor Scrams Also Encl ML20244A5571989-04-10010 April 1989 Notification of 890502 Meeting W/Util in Rockville,Md to Discuss Nonlinear Piping Analysis to Remove Snubbers & Pipe Supports ML20244A5461989-04-10010 April 1989 Notification of 890503 Meeting W/Util in Rockville,Md to Discuss Using Leak Before Break Methodology on Lines Connected to RCS ML20247B7351989-03-24024 March 1989 Notification of 890503 Meeting W/B&W,Inel & Util in Rockville,Md to Discuss Licensing Submittals for Plants ML20236A9721989-03-0707 March 1989 Forwards Feb 1989 Status Rept Re Current Review Milestones for Each Std Plant Project ML20235S6271989-02-28028 February 1989 Notification of 890307 Meeting W/Bwr Owners Group in Rockville,Md to Discuss Items of Current Interest.Agenda Encl ML20246N3171989-02-23023 February 1989 Notification of 890313 Meeting w/C-E in Rockville,Md to Discuss Results of Salem Project & Licensing of Future C-E Projects ML20245E9441989-01-31031 January 1989 Forwards Proposed plant-specific Backfit for Improved Auxiliary Feedwater Sys Reliability Analyses for Required Improvement in Secondary DHR Capability at Plant ML20196C2701988-12-0202 December 1988 Notification of 881207 Meeting W/Util in Rockville,Md to Discuss Dcrdr Submittal of 880825 ML20196B6081988-11-29029 November 1988 Forwards Status Rept for Nov 1988 Re Std Plant Design Technical Reviews ML20206M9231988-11-23023 November 1988 Lists Questions Raised by Board Study of Licensee Environ Repts on Facilities,For Responses & Comments.Served on 881125 ML20195J0141988-11-22022 November 1988 Notification of 881214 Meeting W/Util in Rockville,Md to Discuss Licensing Actions at Plants ML20206J6441988-11-16016 November 1988 Requests Responses to Listed Questions Re Proceeding, Including Explanation of Environ Consequences Caused by Movement of Centrifuges from State of Oh to State of Tn. Served on 881117 ML20206E6361988-11-14014 November 1988 Forwards Fr Notice Re Applications for Amends to Licenses DPR-51,NPF-6 & NPF-38,authorizing Addition of Sys Energy Resources,Inc as Licensee & Requests Comments on Antitrust Issues ML20206J5741988-11-10010 November 1988 Forwards H Thompson as Balance of NRC Response to State of Tn Re Enrichment of Naturally Occurring Radionuclides in Proposed Facilities,Per NRC ML20206J5571988-11-0909 November 1988 Forwards NRC Review & Evaluation of Facilities Security Plans Discussing Equipment & Procedures Used by Applicant to Meet Requirements in 10CFR95.W/o Encl ML20195G2581988-11-0808 November 1988 Partially Deleted Memo Re Commissioner Carr 880113-15 Visit to Plant,Meeting W/State of Mo Officials & Visit to Mallinckrodt,Inc ML20205T6491988-11-0707 November 1988 Ack Receipt of to Chairman Zech Re Alchemie Applications to Operate Facility for Separation of Stable Isotopes at Oak Ridge,Tn & Construct Similar Facility at Oliver Springs,Tn ML20205T5821988-11-0707 November 1988 Notification of 881115 Meeting W/Devonrue & Util in Rockville,Md to Discuss Proposed Std Alternate AC Design to Meet Station Blackout Rule ML20205R6731988-11-0404 November 1988 Forwards NRC Testimony of Jj Swift Addressing ASLB Inquiries of 881018 & Two Attachments.Related Correspondence ML20205N3691988-10-28028 October 1988 Advises That ASLB Tentatively Calling for Telcon on 881109 W/Parties & State of Tn to Discuss Need for Further Prehearing Conference & Other Scheduling Matters,Per 881026 Request.Served on 881031 ML20206B2481988-10-27027 October 1988 Notice of Significant Licensee Meeting 88-174 on 881118 in King of Prussia,Pa to Discuss Configuration Mgt ML20205K3321988-10-26026 October 1988 Forwards SER Re Const Mod & Licensing of & Application for CP for Facilities.Nrc Review of Safeguards/Security Plans for Two Proposed Facilities Sent to Board & Applicant.Telcon to Discuss Scheduling Matters Requested.W/O Encls ML20195B6131988-10-26026 October 1988 Forwards Status Rept on Std Plant Design Technical Reviews ML20155H3621988-10-18018 October 1988 Requests Addl Info Re NRC Environ Assessments Submitted on 880914 for Uncontested Proceedings,To Complete Review of Adequacy of NEPA Assessments.Served on 881018 ML20204G0741988-10-17017 October 1988 Forwards Mh Mobley from State of Tn to NRC Not Received Until 881014.NRC Will Address Matters in Ltr in SER ML20205L2281988-10-12012 October 1988 Forwards AEOD/e807, Pump Damage Due to Low Flow Cavitation, in Response to Action Item 5 Assigned by EDO in 880406 Memo Re Diagnostic Evaluation Team Rept for Plant. NRR Issued Bulletin 88-004 Addressing Recirculation Problem ML20204J5841988-10-12012 October 1988 Forwards AEOD/E807, Pump Damage Due to Low Flow Cavitation, in Response to Item 5 of Actions Directed by EDO to Respond to Diagnostic Evaluation Team Rept.Nrr Issued Bulletin 88-004 Addressing Low Flow Problem ML20155C6941988-10-0505 October 1988 Advises That Review Briefing for Listed Plants Scheduled for 881013.Viewgraphs Encl ML20205Q4941988-10-0303 October 1988 Discusses Concerns Raised by State of Tn Re Abundance of Naturally Occurring Radioactivity in Alchemie Processing. Enrichment of Naturally Occurring Radioisotopes Will Not Pose Significant Health Hazard 1993-09-17
[Table view] Category:MEMORANDUMS-CORRESPONDENCE
MONTHYEARML20062J4701993-09-17017 September 1993 Forwards Response to NRC Questions on Testing Program for Alternate Ac Machine for Placement in PDR & Central Files ML20055C3521990-02-26026 February 1990 Notification of 900305 Meeting W/Util in Rockville,Md to Discuss Status of Licensing Activities for Facility ML20248E9391989-09-29029 September 1989 Forwards AEOD Technical Review Rept on Debris in Containment Recirculation Pumps.No Occurrences Found to Involve Actual Accumulation of Debris in Containment Sumps.Immediate Corrective Actions Completed ML20248C8311989-09-20020 September 1989 Request for Hearing by Alchemie.* Forwards Response & Request for Hearing,In Response to NRC 890818 Order Modifying License & Order to Show Cause Why Licenses Should Not Be Revoked,For Appropriate Action ML20247H9261989-09-0909 September 1989 Advises That SALP Meeting for Facilities Scheduled for 891115.Assessment Input Should Be Submitted by 891016 ML20245E8501989-08-0707 August 1989 Advises of Reassignments in Project Mgt Duties Due to Recent Reorganization of Standardization & Life Extension Project Directorate ML20245H6451989-08-0404 August 1989 Requests Closure of Outstanding Action Item 87-0198,per 870617 Request Re Review & Evaluation of Acceptability of Fairbanks-Morse Diesel Generator Bearings.Action Completed W/Submittal of Transfer of Lead Responsibility to NRR ML20248D1431989-07-27027 July 1989 Forwards Proposed Generic Ltr Requesting Voluntary Licensee Participation in ERDS & Requests That Proposed Generic Ltr Be Sent to All Licensees of Power Reactors,Except for Participants & Licensees of Listed Plants ML20247B7541989-07-19019 July 1989 Confirms That Licensee 880711,890221 & 0630 Responses to NRC Bulletin 88-004, Potential Safety-Related Pump Loss, Acceptable.Licensing Action for TACs 69886,69887,69893 & 69894 Considered Complete ML20247E6721989-07-17017 July 1989 Proposes Closeout of Plant Correspondence Control Ticket Re Environ Conservation Organization Request for Notification Whenever License Amend Requests Result in Impairment of Plant Operability.Intervenor Will Be Placed on Svc List ML20246K5991989-07-12012 July 1989 Notification of 890725 Meeting W/Util in Birmingham,Al to Discuss Status of Current Licensing Activities & Corporate Initiatives for Plants.Meeting Agenda Encl ML20246L6801989-07-10010 July 1989 Notification of Significant Licensee Meeting 89-101 W/Util on 890718 in King of Prussia,Pa to Discuss Util Engineering Reorganization ML20247A9561989-07-0606 July 1989 Notification of 890717 Meeting W/Lead Plant Utils in Rockville,Md to Discuss Implementation of Revised STS ML20246D8841989-06-19019 June 1989 Staff Requirements Memo Re 890601 Briefing on Operating Reactors & Fuel Facilities in Rockville,Md.Commission Expressed Disappointment in Long Term Operating Performance of Turkey Point Nuclear Power Plant ML20246H3771989-05-12012 May 1989 ALAB-913.* Advises That Time Provided within Which Commission May Act to Review Aslab Decision ALAB-913 Expired.Commission Declined Review.Decision Became Final on 890501.W/Certificate of Svc.Served on 890512 ML20246P9601989-05-10010 May 1989 Discusses 890413 Meeting W/Rosemount & Industry Re Malfunctions of Rosemount Transmitters.List of Attendess, Agenda,Nrc Info Notice 89-042 & Viewgraphs Encl NUREG-1353, Board Notification 89-003:forwards Listed Documents Re Spent Fuel Pool Accidents for Resolution of Generic Issue 82, Beyond DBA in Spent Fuel Pools, Including NUREG-13531989-05-0202 May 1989 Board Notification 89-003:forwards Listed Documents Re Spent Fuel Pool Accidents for Resolution of Generic Issue 82, Beyond DBA in Spent Fuel Pools, Including NUREG-1353 ML20245E9781989-04-17017 April 1989 Forwards Regulatory History AC83-2 Re Licensee Action During Natl Security emergency,10CFR50 (54FR7178) ML20245B6191989-04-15015 April 1989 Forwards Evaluation Rept Re BWR Overfill Events Resulting in Steam Line Flooding.All Events Included Reactor Depressurization Followed by Uncontrolled Condensate or Condensate Booster Pumps Injection or Both ML20245B6421989-04-15015 April 1989 Forwards Engineering Evaluation Rept on BWR Overfill Events Resulting in Steam Line Flooding.Though Little Actual Damage Experienced,Potential for Equipment Damage Believed to Exist & Any Damage Occurring Should Be Fixed Prior to Restart ML20245B6531989-04-15015 April 1989 Forwards Evaluation Rept on BWR Overfill Events Resulting in Flooding of Steam Lines.Events Determined to Involve Deficiencies in Control Sys ML20245B7501989-04-15015 April 1989 Forwards Engineering Evaluation Rept on BWR Overfill Events Resulting in Flooding of Steam Lines.Potential for Equipment Damage Believed to Exist & Any Damage Occurring Should Be Fixed Prior to Restart ML20244E2681989-04-12012 April 1989 Summary of Operating Reactors Events Meeting 89-015 on 890412.Discussion of Events,List of Attendees & Three Significant Items Identified for Input Into NRC Performance Indicator Program & Summary of Reactor Scrams Also Encl ML20244A5461989-04-10010 April 1989 Notification of 890503 Meeting W/Util in Rockville,Md to Discuss Using Leak Before Break Methodology on Lines Connected to RCS ML20244A5571989-04-10010 April 1989 Notification of 890502 Meeting W/Util in Rockville,Md to Discuss Nonlinear Piping Analysis to Remove Snubbers & Pipe Supports ML20247B7351989-03-24024 March 1989 Notification of 890503 Meeting W/B&W,Inel & Util in Rockville,Md to Discuss Licensing Submittals for Plants ML20236A9721989-03-0707 March 1989 Forwards Feb 1989 Status Rept Re Current Review Milestones for Each Std Plant Project ML20235S6271989-02-28028 February 1989 Notification of 890307 Meeting W/Bwr Owners Group in Rockville,Md to Discuss Items of Current Interest.Agenda Encl ML20246N3171989-02-23023 February 1989 Notification of 890313 Meeting w/C-E in Rockville,Md to Discuss Results of Salem Project & Licensing of Future C-E Projects NUREG/CR-5176, Updated Board Notification 89-01 Re Lll NUREG/CR-5176, Seismic Failure & Cask Drop Analyses of Spent Fuel Pools at Two Representative Nuclear Power Plants1989-02-14014 February 1989 Updated Board Notification 89-01 Re Lll NUREG/CR-5176, Seismic Failure & Cask Drop Analyses of Spent Fuel Pools at Two Representative Nuclear Power Plants ML20245E9441989-01-31031 January 1989 Forwards Proposed plant-specific Backfit for Improved Auxiliary Feedwater Sys Reliability Analyses for Required Improvement in Secondary DHR Capability at Plant ML20196C2701988-12-0202 December 1988 Notification of 881207 Meeting W/Util in Rockville,Md to Discuss Dcrdr Submittal of 880825 ML20196B6081988-11-29029 November 1988 Forwards Status Rept for Nov 1988 Re Std Plant Design Technical Reviews ML20206M9231988-11-23023 November 1988 Lists Questions Raised by Board Study of Licensee Environ Repts on Facilities,For Responses & Comments.Served on 881125 ML20195J0141988-11-22022 November 1988 Notification of 881214 Meeting W/Util in Rockville,Md to Discuss Licensing Actions at Plants ML20206J6441988-11-16016 November 1988 Requests Responses to Listed Questions Re Proceeding, Including Explanation of Environ Consequences Caused by Movement of Centrifuges from State of Oh to State of Tn. Served on 881117 ML20206E6361988-11-14014 November 1988 Forwards Fr Notice Re Applications for Amends to Licenses DPR-51,NPF-6 & NPF-38,authorizing Addition of Sys Energy Resources,Inc as Licensee & Requests Comments on Antitrust Issues ML20206J5741988-11-10010 November 1988 Forwards H Thompson as Balance of NRC Response to State of Tn Re Enrichment of Naturally Occurring Radionuclides in Proposed Facilities,Per NRC ML20206J5571988-11-0909 November 1988 Forwards NRC Review & Evaluation of Facilities Security Plans Discussing Equipment & Procedures Used by Applicant to Meet Requirements in 10CFR95.W/o Encl ML20195G2581988-11-0808 November 1988 Partially Deleted Memo Re Commissioner Carr 880113-15 Visit to Plant,Meeting W/State of Mo Officials & Visit to Mallinckrodt,Inc ML20205T6491988-11-0707 November 1988 Ack Receipt of to Chairman Zech Re Alchemie Applications to Operate Facility for Separation of Stable Isotopes at Oak Ridge,Tn & Construct Similar Facility at Oliver Springs,Tn ML20205T5821988-11-0707 November 1988 Notification of 881115 Meeting W/Devonrue & Util in Rockville,Md to Discuss Proposed Std Alternate AC Design to Meet Station Blackout Rule ML20205R6731988-11-0404 November 1988 Forwards NRC Testimony of Jj Swift Addressing ASLB Inquiries of 881018 & Two Attachments.Related Correspondence ML20205N3691988-10-28028 October 1988 Advises That ASLB Tentatively Calling for Telcon on 881109 W/Parties & State of Tn to Discuss Need for Further Prehearing Conference & Other Scheduling Matters,Per 881026 Request.Served on 881031 ML20206B2481988-10-27027 October 1988 Notice of Significant Licensee Meeting 88-174 on 881118 in King of Prussia,Pa to Discuss Configuration Mgt ML20195B6131988-10-26026 October 1988 Forwards Status Rept on Std Plant Design Technical Reviews ML20205K3321988-10-26026 October 1988 Forwards SER Re Const Mod & Licensing of & Application for CP for Facilities.Nrc Review of Safeguards/Security Plans for Two Proposed Facilities Sent to Board & Applicant.Telcon to Discuss Scheduling Matters Requested.W/O Encls ML20155H3621988-10-18018 October 1988 Requests Addl Info Re NRC Environ Assessments Submitted on 880914 for Uncontested Proceedings,To Complete Review of Adequacy of NEPA Assessments.Served on 881018 ML20204G0741988-10-17017 October 1988 Forwards Mh Mobley from State of Tn to NRC Not Received Until 881014.NRC Will Address Matters in Ltr in SER ML20204J5841988-10-12012 October 1988 Forwards AEOD/E807, Pump Damage Due to Low Flow Cavitation, in Response to Item 5 of Actions Directed by EDO to Respond to Diagnostic Evaluation Team Rept.Nrr Issued Bulletin 88-004 Addressing Low Flow Problem 1993-09-17
[Table view] |
Text
e I, *
[ ' ;",,(I[hi NUCLEAR 'REGULATORY COMMISSION W ASHINGTON, 0. C. 20555 d"%% ,'
[/ #E !
March 5,1984 MEMORANDUM FOR: William J. 'Dircks -
Executive Director for Operations Guy H. Cunningham, III FROM:
Executive Legal Director
SUBJECT:
LEGAL GUIDANCE ON NRC ACTIONS IN THE EVENT UTILITIES SEEK TO WITHDRAW THEIR APPLICATIONS TO CONSTRUCT AND TO OPERATE THE ZIMMER AND MARBLE HILL NUCLEAR PLANTS This responds to your request for guidance on this subject in the following areas: Atomic Energy Act of 1954; NEPA; and presence of NRC inspectors at the plant sites.
The guidance is presented-in the outline which is attached. A summary of its essential points follows:
Atomic Eneray Act
- 1. Unless it can be demonstrated that a nuclear plant is not a utiliza-tion facility as defined in the Atomic Energy Act, the utility will need a facility license to possess the facility. Issuance of a license to possess the reactor is the approach typically taken in the past when completed reactors were decommissioned but not dismantled. If the utility decides to " disable" the plant softhat, to NRC's satisfaction, it no longer falls within the definition o'f utilization facility, no facility license is needed, after such dis'abling. There are no existing criteria and no known past experience on the degree of dis-abling deemed necessary to remove a nuclear reactor from the definition of utilization facility. That determination is essentially technical.
In making that determination, however, it should be understood that the utilities' intentions regarding the reactors and a prohibition on loading fuel in them are not controlling under the definition of utilization facility. The definition focuses instead on the capability of the facility to make use of special nuclear material.
- 2. CG&E also has a SNM to possess fuel at the Zimmer site and fuel is stored there now. This material will have to be transferred from the
- site in a manner which satisfies NRC's requirements.
(There is no similar SNM license for Marble Hill.)
- 3. CG&E also has an outstanding indemnity agreement for the Zimmer -
plant. If all radioactive material is removed from the site, that !
agreement should be terminated. If radioactive material remains on the 3 ;
O _
F William J. Dircks ,
site, the indemnity agreement can be terminated only by Commission order or regulation.
(No indemnity agreement has been issued for Marble. Hill.)
NEPA No substantial NEPA issue is now foreseen. There is no major Federal action which caused the utilities to seek withdrawal of their applications. A negative declaration or environmental assessment should, under circumstances
,now known,_ provide the appropriate NEPA evaluation. Consistency with actions in recent application termination requests suggests that the Licensing Boards assigned to' the'Zimmer and Marble Hill operating license proceedings would probably seek staff's view on the adequacy of environmental measures before terminating the licensing proceedings.
Inspectors There is no applicable law which directs the continued presence of NRC inspec-tors on a site under circumstances which exist at the Zimmer and Marble Hill plants. Accordingly, decisions on the continued presence of inspectors would be within the discretion of the NRC. In exercising that discretion, consid-eration should be given to the need of the continued presence of inspectors .
for any ongoing investigations which would continue despite any change in the licensing status of these plants.
Original signed by ' .
Guy H. Cunningham,lll Guy H. Cunningham, III Executive L6 gal Director
Attachment:
Outline cc w/ attachment: -
H. Denton R. DeYoung DISTRIBUTION:
J. Keppler GHCunninghamchron (2) STreby WCParler Stewis (Region III)
JMurray LCuoco EChristenbury ELD Reading Files W01mstead Central Files JLieberman O)~ ,os 0FC - ^
ELD j$ / K,: : : : :
NAME :WParler:dp :GCunningham : : : : :
DATE:03/.$/84 :03/_SI/84 : : : : :
e
OUTLINE OF RELEVANT LEGAL CONSIDERATIONS CONCERNING A REQUEST BY UTILITIES TO WITHDRAW THEIR APPLICATIONS TO CONSTRUCT AND OPERATE THE ZIMMER AND MARBLE HILL PLANTS
Background:
This responds to Mr. Dircks' request that the ELD provide guidance on the legal considerations applicable in three areas in the event the NRC receives a request from the utilities to withdraw their applications for licenses and to terminate the outstanding construction pennits for the Zimmer and Marble Hill plants. The three areas on which legal guidance is requested concern: (1) The Atomic Energy Act.of 1954; (2) NEPA; and (3) NRC inspectors. After summarizing the present procedural and licensing status of the Zimmer and Marble Hill proceedings, guidance is given in each of these areas.
Present Status - Zimmer:
Construction Permit No.-CPPR-88, issued for the Zimmer Plant on October 27, 1972,. remains in effect. Special nuclear material license SNM-1823, issued on June 26, 1979, authorizes the licensee to possess and store SNM at the Zimmer site. That license, which remains in effect, covers SNM now stored at the Zimmer site. -
. Price-Anderson Act Indemnity Agreement No. B-85 was issued along with the SNM license. The indemnity agreement also remains in effect.
. Procedurally, the application for an operating license is pending before a Licensing Board. *-
Present Status - Marble Hill Construction Permits No. CPPR-170 and 171, which were issued for the Marble Hill plants on April 4, 1978, remain in effect. No SNM license has been _
issued for storage and possession of SNM at the Marble Hill site. No Price-Anderson indemnity agreement has been issued for the Marble Hill plants.
Three petitions have been received to intervene in the Marble Hill operating license proceeding. The applicant earlier requested the presiding Licensing Board to defer any further action'in the proceeding pending a decision on cancellation of the plants.
Guidance in each of three areas is as follows:
A. The Atomic Energy Act e
e mr
- -. - . _ - . __ _ ~
2
~
Any privately-owned reactor which is within the AEA's definition of a " utilization facility" must be licensed under the AEA. The license may be for possession only.
.- The AEA's definit. ion of utilization facility focuses on whether:
. the facility is capable of making use of SNM;
. in such quantity as to be of significance to the conson defense and security; or
. in such manner as to affect the health and safety of the
. public; or, ,
. the facility is pecularily adapted for making use of atomic energy in such quantity as to be of significance to the comon defence and security, or in such manner as to affect the health and safety of the public.
. The AEA's definition of utilization facility does not depend either on the absence of authority to load nuclear fuel or on the owner's declared intent not to do so. The definition is in terms of the capability of the facility itself to make use of special nuclear material. .
. Considering the terms of the AEA's definition of a " utilization facility", it would, we believe, be difficult to conclude that a nuclear plant which is substantially completed is not a utilization facility.
In any event, a conclusion that such a plant is not a utilization facility would have to find support on grounds other than the utility's announced intention that it will not procte'd with the particular plant as a nuclear plant, and a prohibition on the loading of nuclear fuel in 4
the plant.
. The consequences of a nuclear plant being a utilization facility j under "le AEA are: )
4
. Although the construction permit for such a plant can legally be terminated if the applicant requests, the AEA requires that i the plant be covered by a license to possess the reactor. (In prior years, owners of reactors covered by the AEA which have not
, been dismantled but which have been decomissioned have been ,
issued a license to possess the reactor. Examples: N.S. Savannah; l Vallecitos BWR; Westinghouse Test Reactor; Peach Bottom 1; Plumbrook; i Fenni 1; and Saxton.) The requirement of a license to possess such a facility results from the capability of the facility itself to make use of special nuclear material and not because the facility has residual radioactivity from prior operation. If the facility does not have the capability to make use of special nuclear material e nn- .-._..m n. . . -- , - ------,.--r,,--- - -- -p--r - - - -
-n--=----m a ,,-
p--
because it has been dismantled, any residual radioactivity in its
. remaining structure is covered by a byproduct material license.
(Examples: Carolina Virginia Tube Reactor; Pathfinder; and SEFOR).
. If the licensee wants to eliminate the need for a license to possess the plant, then the licensee must disable the reactor sufficiently so that it would not fall within the definition of utilization facility. The type of disabling which would suffice for-that purpose would require a technical judgment, especially if the licensee chose a minimal approach. On the other hand, removal or disassembly of the pressure vessel would quite clearly result in a plant which is no longer a utilization facility and therefore is not licensable under the AEA. . .
. NRC has no't published criteria which apply to disabling. It does have jurisdiction over the facility, however, and has a regulation which covers applications for termination of licenses (i 50.82). A construction permit is a license under the AEA (b 185). -
. Apprcpriate public notice should be given of any application to change the licensing status of the plants. Although a hearing request on such an application is unlikely, if there is one the appropriate action on it would be in the discretion of the
. Commission.
. Presumably the applicants.,would make an appropriate request with the Licensing Boards to te'minater licensing proceedings pending before them.
l'.
- 2. The SNM license For CG&E's SNM license to be terminated, the SNM which is possessed under it at the Zimmer site would first have to be transferred elsewhere consistent with NRC requirements. As noted earlier, there is no similar situation at the Marble Hill site.
- 3. Indemnity agreement B-85 with CG&E
. The indemnity agreement' by its terms shall not terminate until all the radioactive material has been removed from the site and transporta-tion from the site has ended as defined in the indemnity agreement.
. If the removal of all SNM from the Zimmer site results in no residual contamination, then the indemnity agreement can tenminate by its own provisions.
l
% 3 1
\
. If, however, any residual radioactive material remains at the ' site after the SNM is transferred from the site, then the indemnity agreement can only be terminated by applicable Comission order or regulation.
(There is 'no in'demnity agreement for the Marble Hill plants.)
B. NEPA
. There is no legal- basis for requiring an environmental impact state-ment if the licensing status is changed from a construction pemit holoer
, to a possession only license. There is no major Federal action involved; the initiating events were the utilities' decision not to pr6ceed with the nucle'ar plants. An appropriate "hard look" should nevertheless be taken at the situations and either a negative declaration or an environmental assessment should be prepared on the withdrawal requests.
. Recent actions involving plant cancellations, but at a much earlier stage than Zimer and Marble Hill, suggest that the presiding Licensins Boards might seek to maintain jurisdiction until actions, satisfactory to the staff, have'been taken to remedy environmental concerns. The extent to which NRC could force remedial action regarding non-radiological environmental concerns under such circumstances could present difficulties if the utilities refuse to cooperate.
C. Inspectors Section 13 of the NRC Authorization Act'for FY's 1982 and 1983 provides the following directions regardi.ng resident inspectors:
"(a) The Nuclear Regulatory Comission is aut8orized and directed to implement and accelerate the resident inspect 6r program so as to assure the assignment of at least one resident inspector by the end of fiscal year 19E2 at each site at which a nuclear power plant is under construction and construction is more than 15 percent complete. At each such site at which construction is not more than 15 percent complete, the Comission shall-i provide that such inspection personnel as the Comission deems appropriate ,
shall be physically present at the site at such times following issuance of the construction permit as may be necessary in the judgment of the l
. Comission."
The foregoing statutory provision is the only statutory directive to the !
Comission which deals explicitly with the presence of NRC inspections at a facility site. Aside from the fact that we are now in FY 1984 and therefore the effectiveness life of section 13 has expired, its language by its own terms does not apply to the Zimer and Marble Hill situations for the 4